Selection guide for Civil Works

TopicsOpen

Home / Knowledge hub / Civil Works / Selection guide

Civil Works

  • Get a soil investigation report first; it sets SBC and foundation type.
  • Choose flooring by load and use: VDF, tremix, epoxy, PU.
  • Plan drainage from storm-water runoff, not guesswork.
  • Use M25 / Fe500D as a minimum for industrial RCC.

Products for this system

Pipe head loss calculatorStructural design

Products and services

Standards cited by number for reference; verify designs with a qualified engineer.