Arc flash study

Factoryclix (Proactive Industrial Private Limited), Ahmedabad, carries out Arc flash study across Gujarat. Arc-flash study, labels, and thermography when it is ordered. The scope covers Model from the single-line and the settings, Incident energy and boundaries, Labels for modelled boards. Desks in Vadodara, Padal (Kheda) and Bharuch. Other states are taken on enquiry. Call +91 99131 17860 or send an RFQ.

Price on request / Get a quote

Scope

An arc-flash study calculates incident energy and approach boundaries for the switchboards and panels in the scope, and it produces the labels for the equipment that was modelled. Thermography of connections and cable terminations can be included on the same visit when the enquiry asks for it. The broader electrical safety audit, which already mentions an arc-flash study and thermography, remains the wider audit. This page is the study itself: the model, the energy, the labels, and the thermal round if it is ordered. It does not replace a protection-coordination study unless that study is asked for, and it does not publish a calorie-per-square-centimetre example.

Standards

The incident-energy calculation follows IEEE 1584, the method the electrical safety audit on this site already names. Labels follow the approach boundaries that calculation produces. Working rules the plant already uses, including IS 732 where the electrical design service cites it, are referenced in the report when they affect the PPE the plant holds. They are not restated here as a claim that Factoryclix issues a certification. Thermography is a measurement of the temperatures seen on the day. It is not a substitute for the incident-energy calculation, and a hot joint is reported as a finding, not as a cleared board. The study lists the working distance and the electrode gap that IEEE 1584 needs, taken from the equipment class in that method, and it writes those inputs next to the result so a later reader can see what was used. A number from a different plant is not copied in.

Steps

The desk collects the single-line diagram, the transformer and generator data, the cable sizes and lengths, the protective-device settings, and the list of boards to be labelled. The fault current and the clearing time are taken from that data. IEEE 1584 is applied to the equipment that has enough data to model. A board with a missing setting is listed as not calculated, not given a guessed energy. Labels are prepared for the boards that were calculated. If thermography is in the order, the camera round is done on energised gear with the access the plant can give, and the images stay in the report. The study does not change a relay setting. A recommended setting is a note. The plant decides whether to apply it. Two operating cases, such as utility only and utility plus generator, are separate rows when both were supplied. A case that was not supplied is not invented. The work is arranged from Proactive Industrial Private Limited, C-119, Siddhivinayak Business Tower, Makarba, Sarkhej, Ahmedabad, Gujarat 380051, with branch desks at Vadodara, Padal (Kheda) and Bharuch. Call +91 99131 17860 or email help@factoryclix.com. Price is on request. This page does not publish a rate, a client name, or a finished-project list.

What the client provides

Send the single-line diagram, protection settings, transformer ratings, cable schedules, and the list of panels to label. A previous study is useful so the report can say what changed. Access to open doors for thermography has to be arranged by the plant, with the isolation rules the plant uses. Do not send an assumed fault level from another site. If the utility fault level is unknown, the report states the value that was assumed and who supplied it, or it leaves that board out.

Deliverables

The report contains the data list, the method, the incident-energy and boundary table for the modelled equipment, the label schedule, and the thermography findings if that round was ordered. Labels are issued for the boards in the table. A board that could not be modelled is named as excluded. The file does not include a PPE price and it does not name a client on this website. A coordination study or a setting change is a separate enquiry. Label stock is the printed card for the boards in the schedule. It is not a claim that every panel on the site was labelled, and a spare label is not issued for a board that was left out of the model.

  • Study report
  • Label schedule
  • Thermography findings when ordered

What drives the cost

The quotation moves with the number of boards, whether the single-line and the settings are already available, whether generators and more than one incoming supply must be modelled, travel, and whether thermography is on the same visit. A plant that needs doors opened under a permit takes longer. No rate per panel and no rate per label is published here. The fee is on the quotation. A return visit to fit labels after the plant has applied settings is a separate line on that quotation, not a rate on this page.

Typical turnaround

Report after the single-line and the settings are on the desk.

Related products and guides

Products for this system

Questions

Who is a Arc flash study consultant in Gujarat?

Factoryclix (Proactive Industrial Private Limited) does Arc flash study from Ahmedabad, with desks in Vadodara, Padal (Kheda) and Bharuch. Visits cover Gujarat. Call +91 99131 17860 or send an RFQ, and the desk writes the quotation after the enquiry.

What does Arc flash study include?

An arc-flash study calculates incident energy and approach boundaries for the switchboards and panels in the scope, and it produces the labels for the equipment that was modelled. Thermography of connections and cable terminations can be included on the same visit when the enquiry asks for it. Price is on request until the quotation is written.

Which standards apply to Arc flash study in India?

The standards already named for Arc flash study are IEEE 1584 and IS 732. A code appears here only because this service uses it. The note cites the clause once the site data is in.

How long does Arc flash study take?

Typical turnaround is report after the single-line and the settings are on the desk. That is the time already stated on this page.

What documents do I need to give for Arc flash study?

Send the single-line diagram, protection settings, transformer ratings, cable schedules, and the list of panels to label. A previous study is useful so the report can say what changed. Access to open doors for thermography has to be arranged by the plant, with the isolation rules the plant uses.

What decides the cost of Arc flash study?

The quotation moves with the number of boards, whether the single-line and the settings are already available, whether generators and more than one incoming supply must be modelled, travel, and whether thermography is on the same visit. A plant that needs doors opened under a permit takes longer. No rate per panel and no rate per label is published here.

Do you work outside Gujarat?

Enquiries from other states are taken on the same desk when the scope matches; site visits are agreed per job. The desks stay in Ahmedabad, Vadodara, Padal (Kheda) and Bharuch.

Last reviewed 27 November 2026. Prepared by the Factoryclix engineering desk.

Related pages

Service areas

Ahmedabad is the registered office. Vadodara and Bharuch are branches. Dahej, Vapi and Sanand are served from those desks. There is no branch page invented for a city that does not have one.

Request a quote / site visit

Price on request. The enquiry is saved as an RFQ, the same way as the contact desk.