Arc flash study & report incl. recommended PPE and arc-flash boundary chart
Audits & Studies
₹1,14,000 / Lot
Ex-GST
Made to order · lead time 7–14 days
GST not published · Made to order · lead time 7–14 days
- Make
- Not listed
- MOQ
- 1 no.
- SKU
- FC-RQ-04613
- HSN
- Not listed
- Dispatch
- Made to order · lead time 7–14 days
- GST
- GST not published
Purchase record
- Applicable standards
- None printed on this listing. Ask for them on the RFQ.
- Datasheet
- No separate datasheet file is stored.
- Drawing
- The figure under the specification is the desk sketch when one can be drawn. A fabrication drawing is not included unless the listing says so.
- Warranty
- 12 months, test certificate on request
- Dispatch
- Made to order · lead time 7–14 days
- Supplier
- Supplier not named.
- Equivalents
- 4 other listings in this duty, below.
Specification
| Unit | Lot |
|---|
Made to order · lead time 7–14 days
Description
No description stored.
30% advance, balance against delivery 12 months, test certificate on request Pan-India courier, freight extra
Related
- Relay coordination study for entire electrical system as per SLD
₹1,02,000
- Quantitative Risk Assessment (QRA) study
Price on request
- Adequacy of fire water network study
Price on request
- HAZOP study (14in ~34 km ATF pipeline)
Price on request
