Audits
Electrical safety, arc flash and thermography
Price on request / Get a quote
What's included
Electrical safety audit with an arc-flash study, a harmonics study where the loads need it, and a thermography round of panels and joints. Electrical safety, arc flash and thermography is for Chemical, Pharmaceutical, Textile, Food, Engineering, Oil and gas sites that need a defined scope rather than a loose product line. Electrical safety audit. Arc-flash study. Harmonics study. Thermography. The work stays inside that list. A task that is not named here is a separate enquiry, not an assumed extra.
- Electrical safety audit
- Arc-flash study
- Harmonics study
- Thermography
Standards we work to
The standards already used for Electrical safety, arc flash and thermography are IS 732, IEEE 1584. A code is printed here only when this service already relies on it. Factoryclix does not add a certificate, a rating or a client name that is not on the page. The note or the report cites the clause that applies once the site data is in, and a licensed engineer stamps a submission that an authority asks for.
- IS 732
- IEEE 1584
Deliverables
The desk issues Audit report, Arc-flash labels data, Thermography images. Typical turnaround is 1–3 weeks including the site day. Drawings and notes are for the enquiry and for the team that will execute the work. They are not a rate list. Price stays on request until the quotation is written from the enquiry.
- Audit report
- Arc-flash labels data
- Thermography images
Industries
Enquiries for Electrical safety, arc flash and thermography usually come from Chemical, Pharmaceutical, Textile, Food, Engineering, Oil and gas, Power, Warehousing. The same scope is used whether the plant is in Ahmedabad or at another site the desk is asked to visit. This page does not claim a finished project for a named client.
- Chemical
- Pharmaceutical
- Textile
- Food
- Engineering
- Oil and gas
- Power
- Warehousing
Where we work
Electrical safety, arc flash and thermography is handled from the Ahmedabad office of Proactive Industrial Private Limited, C-119, Siddhivinayak Business Tower, Makarba, Sarkhej, Ahmedabad 380051, with branch desks at Vadodara, Padal (Kheda) and Bharuch. Site visits cover Gujarat. The same desk takes an enquiry for a plant elsewhere in India when the scope matches what is written here. Call +91 99131 17860 or email help@factoryclix.com and say the city and the duty.
Typical turnaround
1–3 weeks including the site day
Related products and guides
Questions
What is included in Electrical safety, arc flash and thermography?
Electrical safety audit. Arc-flash study. Harmonics study. Thermography.
How long does Electrical safety, arc flash and thermography take?
1–3 weeks including the site day.
What should we send with the enquiry?
Send the city or the site, a short note of the duty, and a drawing or BOQ if you have one. The desk can start from a written description when a drawing is not ready.
How do we get a quote?
Use the enquiry form on this page, or call +91 99131 17860. Price is on request. A quotation is issued only after the enquiry is on the desk. This page does not publish a rate.
Where is the work done?
The registered office is in Makarba, Sarkhej, Ahmedabad. Branches are at Vadodara, Padal (Kheda) and Bharuch. Site work is arranged for plants in Gujarat, and the desk accepts an enquiry from elsewhere in India.
