Audits

Lightning arrester adequacy survey

Factoryclix (Proactive Industrial Private Limited), Ahmedabad, carries out Lightning arrester adequacy survey across Gujarat. Adequacy of the installed lightning protection against IS/IEC 62305. The scope covers Structure data, Inventory of the installed LPS, Risk comparison. The standards named on this page are IS/IEC 62305, IEC 62305 and IS 3043. Desks in Vadodara, Padal (Kheda) and Bharuch. Other states are taken on enquiry. Call +91 99131 17860 or send an RFQ.

Price on request / Get a quote

Scope

A lightning arrester adequacy survey checks whether the air terminals, down conductors, bonds and earths already on a building or a structure match the risk and the method in IS/IEC 62305. It is a survey and a report. A new lightning-protection design is the lightning protection design service. An earth-resistance test on its own is the earthing and lightning testing service. This page is the adequacy check: what is installed, what the structure and the incoming services are, and whether that arrangement meets the code for the risk. Early streamer emission claims are not part of this scope. The engineering desk already states that a lightning earth is a pipe or plate earth, not an ESE set.

Standards

The survey follows IS/IEC 62305, the same code already named on the lightning calculator and on the earthing and lightning testing service, which also cites IS 3043 for the earth. Part 1 is the general principle, part 2 is the risk assessment, part 3 is physical damage and life hazard, and part 4 is electrical and electronic systems. The report uses the parts that the structure needs. It does not print a risk value, a collection area or a rolling-sphere radius as a fixed number on this marketing page. Those are calculated from the height, the length and the contents the client provides, and they appear in the report. No LPS certificate is claimed here. A previous test sheet is quoted only when you supply it. The survey does not invent an earth resistance, and it does not describe an early-streamer terminal as equivalent to the air terminal in part 3.

Steps

The desk takes the length, width and height of each structure, the roof type, the incoming power and data services, and what would be damaged by a strike. The existing air terminals, down conductors, bonds to metalwork and earth pits are recorded from the site or from a marked drawing. The risk assessment in IS/IEC 62305-2 is run for that structure. The rolling-sphere or mesh arrangement in part 3 is compared with what is installed. Bonds and separation for part 4 are noted where electronic systems are in the scope. Gaps are listed as missing downs, a mesh that is too open, an earth that has no test record, or a service that is not bonded. The report does not replace a missing pit. That is a later order. The work is arranged from Proactive Industrial Private Limited, C-119, Siddhivinayak Business Tower, Makarba, Sarkhej, Ahmedabad, Gujarat 380051, with branch desks at Vadodara, Padal (Kheda) and Bharuch. Call +91 99131 17860 or email help@factoryclix.com. Price is on request. This page does not publish a rate, a client name, or a finished-project list.

What the client provides

Send elevations or the height, a roof plan, the locations of existing terminals and pits if you know them, the service entries, and whether the building has a control room or a server room that part 4 should cover. A previous earth-test sheet is useful and is not invented if you do not have one. Access to the roof is required for a visual survey. If the roof cannot be visited, the report says the high-level items were taken from photographs or drawings and were not seen. A site induction and a roof permit, if the plant uses them, are arranged by the client. The survey team does not open a live electrical panel as part of this visit unless the earthing test service is also ordered.

Deliverables

The report contains the structure data, the risk result calculated for this building, the inventory of the installed LPS, the comparison with IS/IEC 62305, and a gap list. A sketch marks terminal and down-conductor positions when they were surveyed. An earth-resistance table is included only when a test was ordered and performed. Design of a new mesh or a new set of pits is the design service, quoted separately. The report does not name a client on this website.

  • Adequacy report
  • Gap list

What drives the cost

The quotation moves with the number and height of structures, whether roofs are accessible, whether part 4 for electronics is included, travel, and whether an earth test is added to the same visit. A tank farm or a set of tall structures takes longer than a single shed. No rate per terminal, no rate per down conductor and no rate per structure is published here. The fee is on the quotation. A second visit, if the roof was locked on the first day, is stated on that quotation rather than assumed.

Typical turnaround

Report after the roof survey and the drawings.

Related products and guides

Products for this system

Matching catalogue lines are on the category page linked above.

Questions

Who is a Lightning arrester adequacy survey consultant in Gujarat?

Factoryclix (Proactive Industrial Private Limited) does Lightning arrester adequacy survey from Ahmedabad, with desks in Vadodara, Padal (Kheda) and Bharuch. Visits cover Gujarat. Call +91 99131 17860 or send an RFQ, and the desk writes the quotation after the enquiry.

What does Lightning arrester adequacy survey include?

A lightning arrester adequacy survey checks whether the air terminals, down conductors, bonds and earths already on a building or a structure match the risk and the method in IS/IEC 62305. It is a survey and a report. Price is on request until the quotation is written.

Which standards apply to Lightning arrester adequacy survey in India?

The standards already named for Lightning arrester adequacy survey are IS/IEC 62305, IEC 62305 and IS 3043. A code appears here only because this service uses it. The note cites the clause once the site data is in.

How long does Lightning arrester adequacy survey take?

Typical turnaround is report after the roof survey and the drawings. That is the time already stated on this page.

What documents do I need to give for Lightning arrester adequacy survey?

Send elevations or the height, a roof plan, the locations of existing terminals and pits if you know them, the service entries, and whether the building has a control room or a server room that part 4 should cover. A previous earth-test sheet is useful and is not invented if you do not have one. Access to the roof is required for a visual survey.

What decides the cost of Lightning arrester adequacy survey?

The quotation moves with the number and height of structures, whether roofs are accessible, whether part 4 for electronics is included, travel, and whether an earth test is added to the same visit. A tank farm or a set of tall structures takes longer than a single shed. No rate per terminal, no rate per down conductor and no rate per structure is published here.

Do you work outside Gujarat?

Enquiries from other states are taken on the same desk when the scope matches; site visits are agreed per job. The desks stay in Ahmedabad, Vadodara, Padal (Kheda) and Bharuch.

Last reviewed 27 November 2026. Prepared by the Factoryclix engineering desk.

Related pages

Service areas

Ahmedabad is the registered office. Vadodara and Bharuch are branches. Dahej, Vapi and Sanand are served from those desks. There is no branch page invented for a city that does not have one.

Request a quote / site visit

Price on request. The enquiry is saved as an RFQ, the same way as the contact desk.