Projects · drawing and BOQ

Mechanical equipment / Electric motor

ABB LV induction motor — 0.37 kW · 2 pole · IE2 · B5 flange · S1 continuous · TEFC · 690 V
ABB · Electric motorS1 continuous0.37 kWABB LV induction motor — 0.37 kW · 2 pole · IEMOQ 1 unit · 4–8 weeks

ABB

ABB LV induction motor — 0.37 kW · 2 pole · IE2 · B5 flange · S1 continuous · TEFC · 690 V

₹14,230

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 850152 · Confirm stock and the rate on the offer.

Make
ABB
MOQ
1 unit
SKU
RG-3533577
HSN
850152
Dispatch
4–8 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 150 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

Specification

Power0.37 kW
Poles2 pole
EfficiencyIE2
MountB5 flange
DutyS1 continuous
EnclosureTEFC
Supply690 V
MakeABB
StandardBIS IE marked, low voltage, 50 Hz
MOQ1 unit
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

LV induction motor. BIS IE marked, low voltage, 50 Hz. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO.

Datasheet

ABB · ABB LV induction motor — 0.37 kW · 2 pole · IE2 · B5 flange · S1 continuous · TEFC · 690 V

Market rate ₹14,230 ex-GST · HSN 850152 · MOQ 1 unit · 4–8 weeks

LV induction motor. BIS IE marked, low voltage, 50 Hz. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO.

ABB · Electric motorS1 continuous0.37 kWABB LV induction motor — 0.37 kW · 2 pole · IEMOQ 1 unit · 4–8 weeks
Power0.37 kW
Poles2 pole
EfficiencyIE2
MountB5 flange
DutyS1 continuous
EnclosureTEFC
Supply690 V
MakeABB
StandardBIS IE marked, low voltage, 50 Hz
MOQ1 unit
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, FOR site — not a parcel

Other vendors to compare