Engineering hub

Engineering Hub: System Design, Drawings & BOQ

Enter the duty, or describe any requirement and attach the drawing. AutoCAD, PDF, a spreadsheet or a photograph is accepted. The desk sizes what it can from NBC 2016 Part 4, IS 15105, IS 3844, IS 13039, TAC, NFPA 13, NFPA 20, IS 732, IS 3043, IS 2189, ISHRAE and ASHRAE 62.1, draws the P&ID or single-line diagram, the scaled plan, both elevations, section A-A and the isometric, and writes the bill. A PEB shed takes length, width, eave, bay, slope, basic wind speed, crane and cladding, and draws the framing plan, the anchor bolt plan, both elevations, section A-A and a rotatable 3D model. Fire suppression and fire detection sit under Fire protection, not as a separate project type. A mark you add on the sheet is saved with the download. A licensed engineer still stamps the issue.

Choose project type

Piping is selected. The subcategories for this type are under this list. The drawing and the bill further down are the existing type page. A catalogue price is used when it matches. Otherwise a published Indian rate plus 20% is shown with its source. Erection is 10% of that system's materials, testing 2%, and transport 3%.

Subcategories

Each subcategory has its own design basis, calculation, drawings, bill and quotation.

Piping

MS, GI and SS are separate duties. MOQ follows the class on each line.

AutoCAD DWG or DXF, PDF, or any other file.

Factoryclix

Rev A

SHEET 1 OF 6

100 NB · 1.70 m/s · 300 mP-1001L-1001Line300 m100 NB · 1.70 m/s · 300 mGVGate valves10 no.FLFlanges20 no.ELElbows10 no.TEETees5 no.Equipment quantities are the bill. Plan, elevations and section A-A share one scale.Factoryclix / Proactive Industrial Pvt LtdPipingDRAWINGP&IDSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis Pipe bore 100 NB · 1.70 m/s · 300 m
  • 2,000 m² is the area of one floor, 2 floors, 8 m height. Sprinkler heads, sprinkler branch pipe and smoke detectors are that floor counted again on every floor. The sprinkler pump stays on the remote design area.
  • Prices on the quotation are ex-GST. A catalogue match is used first. Where the catalogue has no price, a published Indian rate plus 20% is used and the source is on the line. GST at 18% is added on every material line. A price the source already quoted including GST is converted to the ex-GST rate and 18% is shown separately. Erection and installation labour is 10% of that system's material subtotal, testing and commissioning 2%, and transport 3%. GST 18% is added on those allowances.
  • Standards cited on this desk: NBC 2016 Part 4, IS 15105, IS 3844, IS 13039, TAC, NFPA 13, NFPA 20, IS 732, IS 3043, IS 2189, ISHRAE and ASHRAE 62.1.
  • Pipe bore is from Q = vA. The metreage is the length you entered, or an allowance from the floor area when that length is left blank.

Calculation

PartFormulaWorkingResultStandard
Pipe bored from Q = v × π d² / 4800 L/min held to 2 m/s100 NB · 1.70 m/s · 300 mIS 1239

Design basis

PartSpecificationStandard
GI pipe 100 NB heavy300 m, 100 NB from velocity 1.7 m/s, GI heavy. The catalogue figure is a per-metre rate, not a 6 m length.IS 1239
gate valve 100 NBOne isolation about every 30 m.API 600
flange 100 NB class 150 A105Two flanges for each isolation valve, class 150, A105.ASME B16.5
90 elbow 100 NB Sch 40One elbow for each isolation, as an allowance.ASME B16.9
equal tee 100 NB Sch 40Branch tees. A reducer is not added when both ends are the same bore, and a 25 NB union is not put on this line.ASME B16.9
spiral wound gasket 100 NB class 150One gasket each flange pair, class 150.ASME B16.20
CouplingOne screwed coupling about every 12 m.ASME B16.11
StrainerOne strainer about every 60 m.Site practice
Check valveOne non-return valve about every 80 m.API 594
BoltEight bolts on each of the 10 flange pairs already on the pipe bill. Calc 80 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count.ISO 4014
Hanger300 m of pipe. One hanger about every 3 m, 100 clamps, 100 mm to match the line. Price on request unless the catalogue has this bore. An 80 mm clamp is not used on a different line.Site practice
Insulation300 m of pipe insulation. The catalogue price is a 2 m tube, so the rate is that price divided by 2.NBC Part 8
Pressure gaugeOne upstream and one downstream of the control point. 4 inch dial, 0–10 kg/cm².IS 3624
Flow switchOne 100 mm vane flow switch on the duty.Site practice
PrimerOutside of 300 m of 100 NB pipe. About 94 m². Two coats, an allowance of 10 m² per litre per coat.IS 1477
Finish paintOutside of 300 m of 100 NB pipe. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate.IS 1477
Welding rodWelds on the elbows, tees and flanges already counted, 35 joints.AWS A5.1
SealantJoint sealant on the sleeves, one cartridge about every 40 m.Site practice
TestingPiping testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionPiping erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TransportPiping transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice

Get this designed & installed by us

Statutory

  • This is an enquiry BOQ, not a sanctioned design. A licensed consultant stamps the drawing before construction.
  • Steam pipe is an IBR job. Petroleum, solvent and compressed-gas lines follow PESO where the storage crosses the threshold. Hot or large-bore lines need a pipe-stress check.

Piping BOQ

Proactive Industrial Private LimitedGSTIN: 24AAQCP1475R1ZLRegistered office: C-119, Siddhivinayak Business Tower, Makarba, Sarkhej, Ahmedabad, Gujarat 380051Branch offices: Vadodara | Padal (Kheda) | Bharuch

Supply

  • GI pipe 100 NB heavy

    300 m, 100 NB from velocity 1.7 m/s, GI heavy. The catalogue figure is a per-metre rate, not a 6 m length. · IS 1239

    300 m × —

    GST —

    Amount —

  • gate valve 100 NB

    One isolation about every 30 m. · API 600

    10 no. × —

    GST —

    Amount —

  • flange 100 NB class 150 A105

    Two flanges for each isolation valve, class 150, A105. · ASME B16.5

    20 no. × —

    GST —

    Amount —

  • 90 elbow 100 NB Sch 40

    One elbow for each isolation, as an allowance. · ASME B16.9

    10 no. × —

    GST —

    Amount —

  • equal tee 100 NB Sch 40

    Branch tees. A reducer is not added when both ends are the same bore, and a 25 NB union is not put on this line. · ASME B16.9

    5 no. × —

    GST —

    Amount —

  • spiral wound gasket 100 NB class 150

    One gasket each flange pair, class 150. · ASME B16.20

    20 no. × —

    GST —

    Amount —

  • forged coupling 100 NB

    One screwed coupling about every 12 m. · ASME B16.11

    25 no. × —

    GST —

    Amount —

  • Y strainer 100 NB

    One strainer about every 60 m. · Site practice

    5 no. × —

    GST —

    Amount —

  • check valve 100 NB

    One non-return valve about every 80 m. · API 594

    4 no. × —

    GST —

    Amount —

  • hex bolt M16 60 mm grade 8.8

    Eight bolts on each of the 10 flange pairs already on the pipe bill. Calc 80 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count. · ISO 4014

    1 lot × —

    GST —

    Amount —

  • GI pipe clamp 100 mm

    300 m of pipe. One hanger about every 3 m, 100 clamps, 100 mm to match the line. Price on request unless the catalogue has this bore. An 80 mm clamp is not used on a different line. · Site practice

    100 no. × —

    GST —

    Amount —

  • insulation nitrile

    300 m of pipe insulation. The catalogue price is a 2 m tube, so the rate is that price divided by 2. · NBC Part 8

    300 m × —

    GST —

    Amount —

  • pressure gauge

    One upstream and one downstream of the control point. 4 inch dial, 0–10 kg/cm². · IS 3624

    2 no. × —

    GST —

    Amount —

  • flow switch

    One 100 mm vane flow switch on the duty. · Site practice

    1 no. × —

    GST —

    Amount —

  • red oxide metal primer 1 L

    Outside of 300 m of 100 NB pipe. About 94 m². Two coats, an allowance of 10 m² per litre per coat. · IS 1477

    19 L × —

    GST —

    Amount —

  • synthetic enamel finish 1 L

    Outside of 300 m of 100 NB pipe. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate. · IS 1477

    10 L × —

    GST —

    Amount —

  • welding electrode E6013 3.15 mm

    Welds on the elbows, tees and flanges already counted, 35 joints. · AWS A5.1

    9 kg × —

    GST —

    Amount —

  • silicone sealant 280 ml

    Joint sealant on the sleeves, one cartridge about every 40 m. · Site practice

    8 no. × —

    GST —

    Amount —

  • transport to site

    Piping transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

Supply subtotal—

Installation

  • testing and commissioning

    Piping testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    Piping erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

Installation subtotal—

GST —

Grand total —

Supply is the material and the transport. Installation is erection, testing and commissioning, and the other site services. Each section has its own ex-GST subtotal. GST and the grand total follow. A catalogue match is used when the catalogue has a price. Where it does not, the rate is a published Indian marketplace or maker price plus 20%, and the source is on the line. Every material rate is ex-GST, and GST at 18% is added on it. A published price that already included GST is converted to the ex-GST figure and 18% is shown separately. Erection and installation labour is 10% of that system's material subtotal, testing and commissioning 2%, and transport 3%, with GST at 18% on those allowances.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 150 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.