Systems / Complete HVAC system
Complete HVAC system
Cooling and air movement for a factory block, from the load to the air handler.
Requirement, then engineering, drawing, BOQ, specification, product match and the RFQ.
What engineering needs
Floor area, fresh air and the process load. A thumb rule is not the design.
Major components
- Chiller or condensing unit
- AHU
- Duct and diffuser
- Pump and pipe for chilled water
- Controls
Typical bill
- Cooling machine at the calculated TR
- Air handlers
- Chilled-water pump and pipe
- Duct, grille and insulation
A typical bill is a starting list. It is not your plant’s quantity.
Catalogue
Engineering hub
Opens this project type on the engineering hub. Quantities stay on that drawing and bill.
Makes on the catalogue are listed products. A listing is not an approved-vendor certificate.
