Systems / Complete electrical package
Complete electrical package
Distribution from the incomer to the motor and the lighting board.
Requirement, then engineering, drawing, BOQ, specification, product match and the RFQ.
What engineering needs
Load in kW, voltage, fault level and the length of the run.
Major components
- Incomer and MCCB
- Cable
- Cable tray
- Motor starter
- Earthing
Typical bill
- Panels
- Cable by size and run
- Tray and glands
- Earthing strip
A typical bill is a starting list. It is not your plant’s quantity.
Catalogue
Engineering hub
Opens this project type on the engineering hub. Quantities stay on that drawing and bill.
Makes on the catalogue are listed products. A listing is not an approved-vendor certificate.
