Project installation
CO2 flooding system
Factoryclix (Proactive Industrial Private Limited), Ahmedabad, supplies and installs CO2 flooding system across Gujarat. Fixed carbon dioxide total flooding: cylinders, valves, nozzles and the discharge test. The scope covers Cylinder bank, valves and manifold, Distribution pipe and discharge nozzles, Predischarge alarm where the room can be occupied. Desks in Vadodara, Padal (Kheda) and Bharuch. Other states are taken on enquiry. Call +91 99131 17860 or send an RFQ.
Price on request / Get a quote
Scope
A carbon dioxide total-flooding system protects an enclosed volume by discharging CO2 from a fixed cylinder bank through a manifold, distribution pipe and discharge nozzles. The scope on this page is that bank, the valves and actuators, the pipe and nozzles, the controls, and the discharge test the code asks for after installation. Local-application CO2, a hose reel, or a portable extinguisher is a different enquiry. The room has to be a space that can be sealed for the hold time the design uses. People-safety interlocks, a lock-off, a predischarge alarm and a posted warning are part of the same scope when the room can be occupied. Factoryclix supplies and installs the listed hardware and writes the note that ties the cylinder quantity to the measured volume. The clean-agent calculator on this site is the quantity check. It does not add a new formula, and this page does not print a cylinder price or a rate per cubic metre.
Standards
Total flooding on this desk follows IS 6382, the code of practice for design and installation of a fixed carbon dioxide fire extinguishing system. The gas-suppression desk already cites IS 15528 for carbon dioxide and NFPA 12 alongside it. Those are the codes named for this duty. The calculator page states the same IS 15528 reference. A design concentration, a material-conversion factor or a leakage allowance is taken from the code that applies to the fuel and from the room the client measures. It is not typed onto this page as a fixed number. Nozzles, valves and cylinders are the ones listed on Factoryclix when a listing exists. A standard printed on a product page is the standard that listing stores. This service page does not add an approval mark or a rating for any make.
Steps
The desk starts from the room drawing or a measured length, width and height, the hazard, the openings that cannot be closed, and whether people can be inside at the time of discharge. The quantity check is run on the clean-agent calculator for the carbon dioxide path. The cylinder count, the manifold, the pipe route and the nozzle positions are then set out so the discharge reaches the protected volume. Valves and actuators are selected to the bank pressure and to the release arrangement. After installation the discharge test, or the test the code allows in place of a full dump, is witnessed and written up. A room that fails the hold or the door-fan style integrity check used for the enclosure is reported as a fail, not adjusted on the page. As-built marks and the cylinder schedule go in the handover file. The work is arranged from Proactive Industrial Private Limited, C-119, Siddhivinayak Business Tower, Makarba, Sarkhej, Ahmedabad, Gujarat 380051, with branch desks at Vadodara, Padal (Kheda) and Bharuch. Call +91 99131 17860 or email help@factoryclix.com. Price is on request. This page does not publish a rate, a client name, or a finished-project list.
What the client provides
Send the city or the site, a drawing or the room dimensions, what is stored or what process runs in the room, the openings, and whether the room is occupied. If a cylinder bank already exists, send the stampings, the last weight record and any previous test sheet. A preferred make is optional. If you name one, the offer uses listings already on Factoryclix and does not treat that name as anything other than a listing. Photographs of the door, the dampers and the existing pipe help. A bill of quantities is useful when you have one, and the desk can start from a written description when the drawing is not ready. Do not send a rate you expect this page to match. The quotation is written after the enquiry is on the desk.
Deliverables
The file contains the basis of design, the cylinder and nozzle schedule, the pipe schematic, the test record for the discharge or the enclosure check that was actually done, and the as-built when the installation is in the order. A warning sign and the predischarge sequence are included when the room can be occupied. Drawings are for the enquiry and for the team that executes the work. They are not a rate list. Typical turnaround for the design note is after the room data is complete. Installation follows the programme agreed on the quotation. Authority time, if a fire NOC file is also ordered, is extra and sits on the Fire NOC service, not inside this discharge scope.
- Basis of design
- Cylinder and nozzle schedule
- Test record
What drives the cost
The quotation moves with the protected volume, the design concentration the code requires for the fuel, the leakage and hold time, the cylinder storage location and the pipe route from the bank to the nozzles, the number of nozzles and selector valves, whether the room needs a lock-off and a predischarge alarm, and access for the cylinder handling. A remote bank, a long pipe run, or a room that must stay in service during the work changes the programme. None of those items has a rupee rate on this page. There is no rate per cubic metre, no rate per cylinder and no rate per nozzle published here. Ask for a quote. The offer states the GST treatment when the line items are known. Freight for cylinders is apart from the hardware rate.
Typical turnaround
Design note after the room data. Installation on the programme in the quotation.
Related products and guides
Products for this system
- CO2 Total Flooding System (cylinders, manifold, nozzles, release panel)
- HD Fire Protect HD-Rakshak IHP CO2 Fire Suppression System – Automatic Fire Protection with Heat Sensing Tube (2Kg–18Kg)
- Installation, testing & commissioning of CO2 flooding system – electrical part only
- SAFE PRO SAFE PRO CO2 Cartridge with Brass Nut 120G
- SAFE PRO SAFE PRO CO2 Direct High Pressure Fire Suppression System
- SAFE PRO SAFE PRO CO2 Indirect High Pressure Suppression System
- SAFE PRO SAFE PRO High Pressure CO2 Flooding System
- Rotarex Firetec 45Kg / 68L Cylinder /Valve B0480/ Pro Cap/including Siphon / filled Co2 Gas 45 kg /PESO
Questions
Who is a CO2 flooding system contractor in Gujarat?
Factoryclix (Proactive Industrial Private Limited) does CO2 flooding system from Ahmedabad, with desks in Vadodara, Padal (Kheda) and Bharuch. Visits cover Gujarat. Call +91 99131 17860 or send an RFQ, and the desk writes the quotation after the enquiry.
What does CO2 flooding system include?
A carbon dioxide total-flooding system protects an enclosed volume by discharging CO2 from a fixed cylinder bank through a manifold, distribution pipe and discharge nozzles. The scope on this page is that bank, the valves and actuators, the pipe and nozzles, the controls, and the discharge test the code asks for after installation. Price is on request until the quotation is written.
Which standards apply to CO2 flooding system in India?
The standards already named for CO2 flooding system are NFPA 12, IS 15528 and IS 6382. A code appears here only because this service uses it. The note cites the clause once the site data is in.
How long does CO2 flooding system take?
Typical turnaround is design note after the room data. Installation on the programme in the quotation. That is the time already stated on this page.
What documents do I need to give for CO2 flooding system?
Send the city or the site, a drawing or the room dimensions, what is stored or what process runs in the room, the openings, and whether the room is occupied. If a cylinder bank already exists, send the stampings, the last weight record and any previous test sheet. A preferred make is optional.
What decides the cost of CO2 flooding system?
The quotation moves with the protected volume, the design concentration the code requires for the fuel, the leakage and hold time, the cylinder storage location and the pipe route from the bank to the nozzles, the number of nozzles and selector valves, whether the room needs a lock-off and a predischarge alarm, and access for the cylinder handling. A remote bank, a long pipe run, or a room that must stay in service during the work changes the programme. None of those items has a rupee rate on this page.
Do you work outside Gujarat?
Enquiries from other states are taken on the same desk when the scope matches; site visits are agreed per job. The desks stay in Ahmedabad, Vadodara, Padal (Kheda) and Bharuch.
Last reviewed 27 November 2026. Prepared by the Factoryclix engineering desk.
Related pages
- Fire hydrant and sprinkler systems
- Gas suppression systems
- Nitrogen injection for transformers
- Fire alarm and fire and gas detection
- About Factoryclix and Proactive Industrial Private Limited
- Contact the Ahmedabad desk
- Send an RFQ
- Factoryclix locations in Gujarat
- Ahmedabad registered office
- Vadodara branch at Raopura
- Bharuch branch
- Site visits to Dahej from Bharuch
- Site visits to Vapi
- Site visits to Sanand from Ahmedabad
- Industrial work across Gujarat
Recent work
Approved project references are not published on this page. This block stays hidden until that list is supplied. No client is named here.
Service areas
Ahmedabad is the registered office. Vadodara and Bharuch are branches. Dahej, Vapi and Sanand are served from those desks. There is no branch page invented for a city that does not have one.