Projects · drawing and BOQ

Fire and safety systems / Gas suppression

Ansul gas suppression system — FM-200 · 30 m3
Ansul · Gas suppressionFM-200FM-200Ansul gas suppression system — FM-200 · 30 m3MOQ 1 unit · 6–12 weeks

Ansul

Ansul gas suppression system — FM-200 · 30 m3

₹2,71,400

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 842410 · Confirm stock and the rate on the offer.

Make
Ansul
MOQ
1 unit
SKU
RG-3988457
HSN
842410
Dispatch
6–12 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 1,357 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

  • FM
  • IS 15493
  • NFPA 2001.

Specification

AgentFM-200
Volume30 m3
MakeAnsul
StandardIS 15493 / NFPA 2001. Room integrity test extra
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

gas suppression system. IS 15493 / NFPA 2001. Room integrity test extra. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one packaged system, ex-works. Room test and site pipe are extra.

Datasheet

Ansul · Ansul gas suppression system — FM-200 · 30 m3

Market rate ₹2,71,400 ex-GST · HSN 842410 · MOQ 1 unit · 6–12 weeks

gas suppression system. IS 15493 / NFPA 2001. Room integrity test extra. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one packaged system, ex-works. Room test and site pipe are extra.

Ansul · Gas suppressionFM-200FM-200Ansul gas suppression system — FM-200 · 30 m3MOQ 1 unit · 6–12 weeks
AgentFM-200
Volume30 m3
MakeAnsul
StandardIS 15493 / NFPA 2001. Room integrity test extra
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra

Chartered engineer

This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.

Request an inspection

Other vendors to compare