Fire and safety systems / Gas suppression

Minimax
Minimax gas suppression system — FM-200 · 30 m3
GST 18% on the listing · HSN 842410 · Confirm stock and the rate on the offer.
- Make
- Minimax
- MOQ
- 1 unit
- SKU
- RG-3988477
- HSN
- 842410
- Dispatch
- 6–12 weeks
- GST
- 18%
Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.
Freight
Ahmedabad to Vadodara · about 131 km · chargeable 1,298 kg
Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124
Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.
- FM
- IS 15493
- NFPA 2001.
Specification
| Agent | FM-200 |
|---|---|
| Volume | 30 m3 |
| Make | Minimax |
| Standard | IS 15493 / NFPA 2001. Room integrity test extra |
| MOQ | 1 unit |
| Chartered Engineer | Inspection can be requested before dispatch |
| Datasheet | Open the datasheet on this page. GA and MTC follow with the offer where the duty needs them. |
Description
gas suppression system. IS 15493 / NFPA 2001. Room integrity test extra. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one packaged system, ex-works. Room test and site pipe are extra.
Datasheet
Minimax · Minimax gas suppression system — FM-200 · 30 m3
Market rate ₹2,59,600 ex-GST · HSN 842410 · MOQ 1 unit · 6–12 weeks
gas suppression system. IS 15493 / NFPA 2001. Room integrity test extra. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one packaged system, ex-works. Room test and site pipe are extra.
| Agent | FM-200 |
|---|---|
| Volume | 30 m3 |
| Make | Minimax |
| Standard | IS 15493 / NFPA 2001. Room integrity test extra |
| MOQ | 1 unit |
| Chartered Engineer | Inspection can be requested before dispatch |
| Datasheet | Open the datasheet on this page. GA and MTC follow with the offer where the duty needs them. |
40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra
Chartered engineer
This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.
Request an inspectionOther vendors to compare
Kidde
Kidde gas suppression system — FM-200 · 30 m3₹2,64,300
Ansul
Ansul gas suppression system — FM-200 · 30 m3₹2,71,400
