Projects · drawing and BOQ

Mechanical equipment / Electric motor

CG LV induction motor — 11 kW · 2 pole · IE2 · B3 foot · S1 continuous · TEFC · Low voltage
CG · Electric motorS1 continuous11 kWCG LV induction motor — 11 kW · 2 pole · IE2 ·MOQ 1 unit · 4–8 weeks

CG

CG LV induction motor — 11 kW · 2 pole · IE2 · B3 foot · S1 continuous · TEFC · Low voltage

₹43,460

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 850152 · Confirm stock and the rate on the offer.

Make
CG
MOQ
1 unit
SKU
RG-3550848
HSN
850152
Dispatch
4–8 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 217 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

Specification

Power11 kW
Poles2 pole
EfficiencyIE2
MountB3 foot
DutyS1 continuous
EnclosureTEFC
SupplyLow voltage
MakeCG
StandardBIS IE marked, low voltage, 50 Hz
MOQ1 unit
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

LV induction motor. BIS IE marked, low voltage, 50 Hz. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO.

Datasheet

CG · CG LV induction motor — 11 kW · 2 pole · IE2 · B3 foot · S1 continuous · TEFC · Low voltage

Market rate ₹43,460 ex-GST · HSN 850152 · MOQ 1 unit · 4–8 weeks

LV induction motor. BIS IE marked, low voltage, 50 Hz. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO.

CG · Electric motorS1 continuous11 kWCG LV induction motor — 11 kW · 2 pole · IE2 ·MOQ 1 unit · 4–8 weeks
Power11 kW
Poles2 pole
EfficiencyIE2
MountB3 foot
DutyS1 continuous
EnclosureTEFC
SupplyLow voltage
MakeCG
StandardBIS IE marked, low voltage, 50 Hz
MOQ1 unit
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, FOR site — not a parcel

Other vendors to compare