Projects · drawing and BOQ

Industrial Machinery / Cooling Systems

Mottotech 400TR Industrial FRP Cooling Towe
Mottotech · Cooling Systemscooling systems400TR · FRPMottotech 400TR Industrial FRP Cooling ToweMOQ 1 unit · 3–6 weeks

Mottotech

Mottotech 400TR Industrial FRP Cooling Towe

₹4,73,000

Market rate, ex-GST

BuySpec

GST not published on this listing · In stock on Factoryclix

Make
Mottotech
MOQ
1 unit
SKU
MOT-FRPCT-400TR
HSN
Not listed
Dispatch
Not published. Quote it on the RFQ.
GST
Not published

Delivery days are not on the Factoryclix listing, so this desk does not invent one. Set lead time on the comparison sheet before you issue the RFQ.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 2,365 kg

Freight ₹2,320 ex-GST · GST ₹418 · Payable ₹2,738

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

Open original listing on Factoryclix

Specification

Capacity400TR
Size/Model10"
HSN CODE84198940
MaterialFRP
Weight5800 kg
Dimensions4200 × 4200 × 3000 cm

Description

Boost your facility efficiency with the Mottotech 400TR FRP cooling tower. Engineered for high-performance heat dissipation, this durable unit handles a massive 240,000 LPH water flow rate. Designed with premium corrosion-resistant materials and a high-torque 12.5 HP fan system,

Datasheet

Mottotech · Mottotech 400TR Industrial FRP Cooling Towe

Market rate ₹4,73,000 ex-GST · MOQ 1 unit · 3–6 weeks

Boost your facility efficiency with the Mottotech 400TR FRP cooling tower. Engineered for high-performance heat dissipation, this durable unit handles a massive 240,000 LPH water flow rate. Designed with premium corrosion-resistant materials and a high-torque 12.5 HP fan system,

Mottotech · Cooling Systemscooling systems400TR · FRPMottotech 400TR Industrial FRP Cooling ToweMOQ 1 unit · 3–6 weeks
Capacity400TR
Size/Model10"
HSN CODE84198940
MaterialFRP
Weight5800 kg
Dimensions4200 × 4200 × 3000 cm

40% advance, balance before dispatch 12 months from commissioning Extra, FOR site — not a parcel

Other vendors to compare