Labour: Supply installation and testing of Installation of the standard response Automatic sprinkler heads with k=80,operating temp 69 deg cel

Labour: Supply installation and testing of Installation of the standard response Automatic sprinkler heads with k=80,operating temp 69 deg cel

Installation & Labour

GST not published · Made to order · lead time 5–12 days

Make
Not listed
MOQ
1 pack
SKU
FC-RQ-04931
HSN
Not listed
Dispatch
Made to order · lead time 5–12 days
GST
GST not published
  • IS 15105

Purchase record

Applicable standards
IS 15105
Datasheet
No separate datasheet file is stored.
Drawing
The figure under the specification is the desk sketch when one can be drawn. A fabrication drawing is not included unless the listing says so.
Warranty
Certificate of analysis with batch
Dispatch
Made to order · lead time 5–12 days
Supplier
Supplier not named.
Equivalents
4 other listings in this duty, below.

Specification

UnitNos.
SpecsErection labour charge offer, Hyderabad
Detailsheet total 15,71,420

Made to order · lead time 5–12 days

Installation & Labourinstallation & labourLabour: Supply installation and testing of InsMade to order · lead time 5–12 days

Description

Erection labour charge offer, Hyderabad; sheet total 15,71,420

100% advance against PI Certificate of analysis with batch Pan-India courier, freight extra

Related

KnowledgeCalculatorFire hydrant and sprinkler installation

Freight

Open original listing on Factoryclix

Equivalent products