Labour: Supply installation and testing of Installation of Cables for Control Panel

Labour: Supply installation and testing of Installation of Cables for Control Panel

Installation & Labour

₹21,600 / Lot

Ex-GST

Made to order · lead time 5–12 days

Buy

GST not published · Made to order · lead time 5–12 days

Make
Not listed
MOQ
1 pack
SKU
FC-RQ-04894
HSN
Not listed
Dispatch
Made to order · lead time 5–12 days
GST
GST not published

Purchase record

Applicable standards
None printed on this listing. Ask for them on the RFQ.
Datasheet
No separate datasheet file is stored.
Drawing
The figure under the specification is the desk sketch when one can be drawn. A fabrication drawing is not included unless the listing says so.
Warranty
Certificate of analysis with batch
Dispatch
Made to order · lead time 5–12 days
Supplier
Supplier not named.
Equivalents
4 other listings in this duty, below.

Specification

UnitLot
SpecsErection labour charge offer, Hyderabad
Detailsheet total 15,71,420

Made to order · lead time 5–12 days

Installation & Labourinstallation & labourLabour: Supply installation and testing of InsMade to order · lead time 5–12 days

Description

Erection labour charge offer, Hyderabad; sheet total 15,71,420

100% advance against PI Certificate of analysis with batch Pan-India courier, freight extra

Related

KnowledgeCalculatorServices

Freight

Open original listing on Factoryclix

Equivalent products