Bag filters, conveying, electrical distribution, fire water and structural steel for a cement works.

The electrical package and the dust-handling mechanical package are usually larger than the fire package. Fire water is still required at the store, the packer and the substation. Structural steel is bought to the drawing, not to a generic listing.

Typical systems

Key standards

  • IS 3043 for the plant earth grid
  • IS 732 for cable
  • IS 13039 for the fire-water duration at the packer and the store

Common products

  • HT and LT cable
  • Motors and mechanical drives
  • Fire hydrant pumps
  • Structural steel to drawing