
Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 6 m · Bare- Process Seamless
- Size 50 NB
₹14,750
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days
Catalogue
Pipes, valves and fittings cover the size, material and end connection named on each listing. A published rate is ex-GST. A listing without a rate is price on request.
Showing 1,23,601–1,23,624 of 1,84,320 products. This count is the live catalogue. A brand number is product lines, not units in a warehouse.
Mill pipe lists 1,84,320 products on Factoryclix. Subcategories linked from this page are Mill pipe (1,84,320), Valves (1,244), Pipe Fittings (456), HDPE Pipes (225), Flanges (180), SS Pipes (84), MS Pipes (83), Pipes & Fittings (57), GI Pipes (33), CPVC Pipes (22), Strainers & Filters (15). Makes with listed lines here include APL Apollo (1), Chandan (1), Electrosteel (1), ISMT (1), Jain (1), Jindal (1), Jindal SAW (1), Jindal Stainless (1), Maharashtra Seamless (1), Rashmi (1). Standards named on listings in this view include API 5L / ASTM A106 / IS 3589. A price on a card is the listed rate, ex-GST. Where the card says Price on request, no rate is published and the line is sent as an RFQ. GST, HSN, MOQ and lead time are shown on the product page when the listing stores them. A missing field is left off the page. Freight is quoted apart from the product rate. Comparison holds up to three makes on one sheet. Buy stays on listings that show a rupee price. An enquiry does not become an order until the desk confirms the rate, the GST and the lead time. Drawings from the engineering desk are an enquiry until a licensed engineer stamps them. A logo or a make name means the name is on a listing. It is not a claim of an exclusive dealership.
Subcategories: Mill pipe, Valves, Pipe Fittings, HDPE Pipes, Flanges, SS Pipes, MS Pipes, Pipes & Fittings, GI Pipes, CPVC Pipes, Strainers & Filters
Makes: APL Apollo, Chandan, Electrosteel, ISMT, Jain, Jindal, Jindal SAW, Jindal Stainless, Maharashtra Seamless, Rashmi

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 6 m · Bare₹14,750
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 6 m · Varnish₹15,340
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 6 m · Galvanised₹22,860
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 6 m · 3LPE₹17,990
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 12 m · Bare₹29,490
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 12 m · Varnish₹30,670
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 12 m · Galvanised₹45,710
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 12 m · 3LPE₹35,980
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 6 m bevel · Bare₹14,750
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 6 m bevel · Varnish₹15,340
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 6 m bevel · Galvanised₹22,860
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 6 m bevel · 3LPE₹17,990
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 12 m bevel · Bare₹29,490
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 12 m bevel · Varnish₹30,670
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 12 m bevel · Galvanised₹45,710
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 80 · 12 m bevel · 3LPE₹35,980
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 120 · 6 m · Bare₹19,630
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 120 · 6 m · Varnish₹20,420
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 120 · 6 m · Galvanised₹30,430
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 120 · 6 m · 3LPE₹23,950
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 120 · 12 m · Bare₹39,270
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 120 · 12 m · Varnish₹40,840
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 120 · 12 m · Galvanised₹60,900
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days

Mill pipe
Surya carbon steel pipe — Seamless · 50 NB · Sch 120 · 12 m · 3LPE₹47,910
Ex-GST
MOQ 1 MT — MS seamless, Sch 80 or 200 NB and above
Made to order · lead time 10–21 days