Engineering hub
Engineering Hub: System Design, Drawings & BOQ
Projects / Switchyard / Switchyard
Switchyard
Get this designed & installed by us
Bus current. Clearance stays in the code table.
IS / CBIP
I = MVA / (√3 × kV)
- The sample is 10 MVA at 11 kV.
