Engineering hub

Engineering Hub: System Design, Drawings & BOQ

Enter the duty, or describe any requirement and attach the drawing. AutoCAD, PDF, a spreadsheet or a photograph is accepted. The desk sizes what it can from NBC 2016 Part 4, IS 15105, IS 3844, IS 13039, TAC, NFPA 13, NFPA 20, IS 732, IS 3043, IS 2189, ISHRAE and ASHRAE 62.1, draws the P&ID or single-line diagram, the scaled plan, both elevations, section A-A and the isometric, and writes the bill. A PEB shed takes length, width, eave, bay, slope, basic wind speed, crane and cladding, and draws the framing plan, the anchor bolt plan, both elevations, section A-A and a rotatable 3D model. Fire suppression and fire detection sit under Fire protection, not as a separate project type. A mark you add on the sheet is saved with the download. A licensed engineer still stamps the issue.

Choose project type

Solar is selected. The subcategories for this type are under this list. The drawing and the bill further down are the existing type page. A catalogue price is used when it matches. Otherwise a published Indian rate plus 20% is shown with its source. Erection is 10% of that system's materials, testing 2%, and transport 3%.

Subcategories

Each subcategory has its own design basis, calculation, drawings, bill and quotation.

Solar

Modules, inverter, structure and the AC side.

AutoCAD DWG or DXF, PDF, or any other file.

Factoryclix

Rev A

SHEET 1 OF 6

DC string and AC outputPVPV array204 no.110.16 kWp · 204 × 540 WpINVInverter2 no.2 × 100 kWMMSMounting structure110.16 kWpGridEquipment quantities are the bill. Plan, elevations and section A-A share one scale.Factoryclix / Proactive Industrial Pvt LtdSolarDRAWINGSingle line diagramSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis Array 110.16 kWp · 204 modules · 446.8 kWh/day
  • 2,000 m² is the area of one floor, 2 floors, 8 m height. Sprinkler heads, sprinkler branch pipe and smoke detectors are that floor counted again on every floor. The sprinkler pump stays on the remote design area.
  • Prices on the quotation are ex-GST. A catalogue match is used first. Where the catalogue has no price, a published Indian rate plus 20% is used and the source is on the line. GST at 18% is added on every material line. A price the source already quoted including GST is converted to the ex-GST rate and 18% is shown separately. Erection and installation labour is 10% of that system's material subtotal, testing and commissioning 2%, and transport 3%. GST 18% is added on those allowances.
  • Standards cited on this desk: NBC 2016 Part 4, IS 15105, IS 3844, IS 13039, TAC, NFPA 13, NFPA 20, IS 732, IS 3043, IS 2189, ISHRAE and ASHRAE 62.1.

Calculation

PartFormulaWorkingResultStandard
ArraykWp = daily kWh / (peak sun hours × performance ratio)Roof limit 110.0 kWp. Load-side 591.7 kWp. The array is sized to 110.0 kWp, then counted in 540 Wp modules so the installed array is not under that figure. Sun hours 5.2, PR 0.78.110.16 kWp · 204 modules · 446.8 kWh/dayIEC 61215 / IEC 62109

Design basis

PartSpecificationStandard
PV module 540204 modules × 540 Wp = 110.16 kWp. The count is rounded up so the array is not under the required output.IEC 61215
solar inverter 1002 × 100 kW, the next standard inverter at or above 110.16 kWp.IEC 62109
module mounting structureRoof structure, one catalogue line is 1 kWp.IS 800
DC cableString cable, 2 m a module, 408 m. The catalogue figure is a per-metre rate, not a drum.IEC 62930
AC cableAC run from the inverter, billed in metres. The catalogue match is a per-metre rate.IS 7098
Cable glandGlands at the inverter and the AC isolator. 25 mm is the published gland.IS 12943
Cable lug70 mm² lugs for the AC tails. 70 mm² is the termination allowance.IS 8309
MC4One male-female pair a module. The published price is a pair, so the quantity is the module count, not two pieces.IEC 62852
Junction boxDC combiner, about one per 20 modules. The published box is a 4-in 4-out 1000 V DCDB.IEC 62548
Cable trayTray from the array to the inverter. This is not the building tray.NBC Part 8
TestingSolar testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionSolar erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TransportSolar transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice

Get this designed & installed by us

Statutory

  • This is an enquiry BOQ, not a sanctioned design. A licensed consultant stamps the drawing before construction.
  • Net metering is with the DISCOM. The electrical inspector (CEIG) clears the plant where the state rule requires it. Use ALMM modules when the tender or the DISCOM asks. Earthing is IS 3043.

Solar BOQ

Proactive Industrial Private LimitedGSTIN: 24AAQCP1475R1ZLRegistered office: C-119, Siddhivinayak Business Tower, Makarba, Sarkhej, Ahmedabad, Gujarat 380051Branch offices: Vadodara | Padal (Kheda) | Bharuch

Supply

  • PV module 540

    204 modules × 540 Wp = 110.16 kWp. The count is rounded up so the array is not under the required output. · IEC 61215

    204 no. × —

    GST —

    Amount —

  • solar inverter 100

    2 × 100 kW, the next standard inverter at or above 110.16 kWp. · IEC 62109

    2 no. × —

    GST —

    Amount —

  • module mounting structure

    Roof structure, one catalogue line is 1 kWp. · IS 800

    110.16 kWp × —

    GST —

    Amount —

  • solar DC cable 4 sqmm 1 core copper

    String cable, 2 m a module, 408 m. The catalogue figure is a per-metre rate, not a drum. · IEC 62930

    408 m × —

    GST —

    Amount —

  • power cable 16

    AC run from the inverter, billed in metres. The catalogue match is a per-metre rate. · IS 7098

    220 m × —

    GST —

    Amount —

  • brass cable gland 25 mm

    Glands at the inverter and the AC isolator. 25 mm is the published gland. · IS 12943

    4 no. × —

    GST —

    Amount —

  • aluminium cable lug 70 sq mm

    70 mm² lugs for the AC tails. 70 mm² is the termination allowance. · IS 8309

    8 no. × —

    GST —

    Amount —

  • MC4 connector pair

    One male-female pair a module. The published price is a pair, so the quantity is the module count, not two pieces. · IEC 62852

    204 pair × —

    GST —

    Amount —

  • solar DC combiner box

    DC combiner, about one per 20 modules. The published box is a 4-in 4-out 1000 V DCDB. · IEC 62548

    11 no. × —

    GST —

    Amount —

  • cable tray 300

    Tray from the array to the inverter. This is not the building tray. · NBC Part 8

    3 length × —

    GST —

    Amount —

  • transport to site

    Solar transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

Supply subtotal—

Installation

  • testing and commissioning

    Solar testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    Solar erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

Installation subtotal—

GST —

Grand total —

Supply is the material and the transport. Installation is erection, testing and commissioning, and the other site services. Each section has its own ex-GST subtotal. GST and the grand total follow. A catalogue match is used when the catalogue has a price. Where it does not, the rate is a published Indian marketplace or maker price plus 20%, and the source is on the line. Every material rate is ex-GST, and GST at 18% is added on it. A published price that already included GST is converted to the ex-GST figure and 18% is shown separately. Erection and installation labour is 10% of that system's material subtotal, testing and commissioning 2%, and transport 3%, with GST at 18% on those allowances.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 150 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.