Engineering Hub: System Design, Drawings & BOQ

Enter the duty, or describe any requirement and attach the drawing. AutoCAD, PDF, a spreadsheet or a photograph is accepted. The desk sizes what it can from NBC 2016 Part 4, IS 15105, IS 3844, IS 13039, TAC, NFPA 13, NFPA 20, IS 732, IS 3043, IS 2189, ISHRAE and ASHRAE 62.1, draws the P&ID or single-line diagram, the scaled plan, both elevations, section A-A and the isometric, and writes the bill. A PEB shed takes length, width, eave, bay, slope, basic wind speed, crane and cladding, and draws the framing plan, the anchor bolt plan, both elevations, section A-A and a rotatable 3D model. Fire suppression and fire detection sit under Fire protection, not as a separate project type. A mark you add on the sheet is saved with the download. A licensed engineer still stamps the issue.

Choose project type

PEB shed is selected. The subcategories for this type are under this list. The drawing and the bill further down are the existing type page. A catalogue price is used when it matches. Otherwise a published Indian rate plus 20% is shown with its source. Erection is 10% of that system's materials, testing 2%, and transport 3%.

Subcategories

Each subcategory has its own design basis, calculation, drawings, bill and quotation.

PEB shed

Single-span pre-engineered shed. Dead, live and wind to IS 875. Rigid frames, purlins, bracing, anchors and pedestals to IS 800. Priced only where the catalogue has the lot.

Shed plan 48 × 20 m · ridge 8.00 m · 9 frames · 15.3 t · Vb 39 m/s · eave 7 m

AutoCAD DWG or DXF, PDF, or any other file.

Factoryclix

Rev A

SHEET 1 OF 6

GA / FRAMING PLAN9 rigid frames · Z 200×2.0 at 1.60 m · bracing in 3 bays123456789ABRIDGE48 m · 8 bays @ 6 m20 mAA10 mScale 1:200SCHEDULE — SAME QUANTITIES AS THE BILLRF PEB primary frame 20 MT 15,251 kgPL Z purlin 1 MT 6.95 MTBR ISA 75x75x6 12 m 23 lengthAB foundation anchor bolt M24… 72 no.GT PEB eave gutter 96 mDP GI pipe 150 NB heavy 60.8 mPD cement OPC 53 54 bagTMT TMT 16 Fe500D 34 barFactoryclix / Proactive Industrial Pvt LtdPEB shedDRAWINGGA / framing planSHEET 1 OF 6SCALE 1:200REV AEnquiry48 m × 20 m · eave 7 m · bay 6 m · slope 1:10 · Vb 39 m/sDesign basis Geometry 9 frames · bay 6 m · rise 1 m · Dead load 0.158 kN/m² on plan
  • Prices on the quotation are ex-GST. A catalogue match is used first. Where the catalogue has no price, a published Indian rate plus 20% is used and the source is on the line. GST at 18% is added on every material line. A price the source already quoted including GST is converted to the ex-GST rate and 18% is shown separately. Erection and installation labour is 10% of that system's material subtotal, testing and commissioning 2%, and transport 3%. GST 18% is added on those allowances.
  • The shed calculation is a preliminary to IS 800 and IS 875. A licensed structural engineer stamps the drawing before fabrication.
  • Single span 48 × 20 m, eave 7 m, 9 pinned-base rigid frames at 6 m. Ends are rigid frames too, not bearing frames.
  • Terrain category 2, class from the longer side, topography factor 1, openings 5–20% so Cpi is ±0.5. The site basic wind speed is the value you entered from IS 875-3. It is not a city lookup.
  • Knee moment wL²/16 is a preliminary pinned-portal value. It is not a second-order frame analysis, and it is not a sanction.
  • Catalogue lots are used where they exist. Anchor bolts, the eave gutter, skylights, sandwich panels, a crane above 10 t and a plate-girder runway use a published Indian rate plus 20%. Erection is 10% of this system's material subtotal, testing and commissioning 2%, and transport 3%.

Calculation

PartFormulaWorkingResultStandard
GeometryBays = round(length / asked bay). Rise = (span / 2) × 1/slope48 m × 20 m, eave 7 m. Asked bay 6 m becomes 8 bays at 6 m. Slope 1 in 10, θ 5.71°. Rise 1 m. Ridge 8 m. Rafter 10.05 m. 9 frames, 18 columns.9 frames · bay 6 m · rise 1 mIS 800
Dead loadSheet + fixings + sag rods + purlin self-weight + servicesSheet and fixings 0.07 kN/m². Sag rods and clips 0.03. Purlin self-weight 0.038 kN/m² from Z 200×2.0. Services 0.02. Wall cladding on the column 0.12 kN/m², separate from the roof UDL.0.158 kN/m² on planIS 875-1
Live load0.75 kN/m² up to 10°, then less 0.02 per degree, minimum 0.40. No roof access.θ 5.71°. At or under 10°, so 0.75 kN/m².0.75 kN/m²IS 875-2
WindVz = Vb k1 k2 k3 k4. pz = 0.6 Vz². pd = Kd Ka Kc pzVb 39 m/s. k1 1.00 for a 50-year general building. k2 0.98 at mean roof height 7.5 m, terrain category 2, class B, Table 2. k3 1.00, flat site. k4 1. Vz 38.22 m/s. pz 0.876 kN/m². Kd 0.90, Ka 0.8 on 120 m², Kc 0.90. pd 0.568 kN/m². Wall Cpe +0.70 / −0.25. Roof Cpe -0.97 / -0.6. Cpi ±0.50. Internal pressure cancels in the net sway.Vz 38.2 m/s · pd 0.568 kN/m²IS 875-3:2015
Rigid framePinned-base knee moment wL²/16. Sway moment (H/2)×eave. Section by N/Nd + M/Md ≤ 1Service roof UDL 5.45 kN/m per frame. Governing case 1.2 (DL+LL+WL): 258.6 kNm and 71.4 kN. fy 250 MPa, γm0 1.1. Haunch 650 mm, flanges 180×8, web 6. Apex 350 mm. Elastic modulus, class 3 limit on outstand and web. Second-order analysis is still required. Wind sway 22.7 kN a frame.15.3 t primary · 650 mm haunchIS 800:2007
SecondariesContinuous Z, M = wL²/10. fy 345 MPa. Spacing reduced until Ze fits.Purlin span is the bay, 6 m. Design pressure 1.36 kN/m². Z 200×2.0 at 1.6 m, Ze 36 cm³. Girts Z 160×2.0 at 1.6 m for wall pressure 1.05 kN/m². 15 purlin lines, side girt lines 6.6.95 t · Z 200×2.0IS 801 / IS 800
Bracing, bolts, baseX-bracing in end bays and mid bay when the shed is long. Pedestal volume × 400 kg/m³ cement and 110 kg/m³ steel.3 braced bays, 23 lengths of ISA 75x75x6. Anchor M24 × 72. Pedestals 6.7 m³, 54 bags, 34 bars. Gutter 96 m. Downpipes 8 × 150 NB.72 bolts · 6.7 m³IS 800 / IS 456

Design basis

PartSpecificationStandard
Primary frames15.25 t (15,251 kg) of built-up steel, including an 8% allowance for splices, stiffeners and base plates. Billed as kg × the 20 MT catalogue lot divided by 20,000 kg (₹116.40/kg). Not a whole 20 MT lot. Haunch 650×180×8 web 6 mm. Apex 350 mm. E250, fy 250.IS 800 / IS 2062
Purlins and girtsZ 200×2.0 purlins at 1.6 m, Z 160×2.0 girts at 1.6 m. 6.95 t of Z, billed to 0.01 t, not rounded up to a whole MT. C girts are not a separate price.IS 801 / IS 800
GalvalumeCalc 2,063 m² | Billed 2,100 m². Roof 1,013 m² and walls 1,050 m², laps included. The catalogue sells a 100 m² lot, so the billed area is that lot stepped up. Rate is the lot price divided by 100.IS 875-1
Sag rodsCalc 960 m² of plan | the catalogue sag-rod lot is taken as 500 m², so this line is that area × (lot price / 500). Not one ₹49,900 lot unless the plan is 500 m².IS 800
Bracing23 bracing members in 3 braced bays (8 bays). Roof diagonal 20.9 m, wall diagonal 9.2 m, cut from 12 m lengths. Two roof diagonals and two wall diagonals per braced bay, plus one strut in each unbraced bay.IS 800 / IS 808
Anchor bolts4 bolts a column, M24, embedment 600 mm, projection 100 mm, pitch 150 mm, gauge 180 mm. Catalogue hex bolts stop at 250 mm, so this foundation bolt is not priced from them.IS 800 / IS 5624
Eave gutterBoth eaves, 96 m. No gutter is in the catalogue.IS 875-2
Downpipes8 drops of 150 NB, 60.8 m including a shoe. The catalogue figure is a per-metre rate, so this line is metres, not a count of 6 m lengths.IS 1239
Pedestal concrete18 pedestals 600×600×900 mm plus 75 mm PCC. 6.7 m³ at 400 kg/m³, M25.IS 456
Pedestal steel642 kg in the pedestals at 110 kg/m³, counted as 16 mm bars of 12 m. PCC is unreinforced.IS 1786
FlashingEaves and gables, 2 × 48 m + 2 × 20 m. The sourced piece is 1.829 m and the rate is per metre.IS 875-1
RidgeRidge along the length, 48 m. Same sourced piece as the flashing, priced per metre.IS 875-1
Sheeting screw2,063 m² of sheet, about 6 screws a square metre, boxes of 500.IS 875-1
SkylightAbout 3% of the plan, minimum 3 m². 10 mm multiwall sheet, the published ₹45 a square foot converted to m².IS 875-1
Turbo ventilatorOne 600 mm ventilator about every 150 m² of plan, and at least two.IS 875-1
SealantSealant on the gutter and the ridge, one cartridge about every 12 m.Site practice
PrimerPrimary and secondary steel, an allowance of 25 m² a tonne, 22.2 t. About 555 m². Two coats, an allowance of 10 m² per litre per coat.IS 1477
Finish paintPrimary and secondary steel, an allowance of 25 m² a tonne, 22.2 t. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate.IS 1477
Welding rodSite splice allowance, 2 kg a frame, 9 frames. Shop welds are in the primary steel.AWS A5.1
TestingPEB shed testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionPEB shed erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TransportPEB shed transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice

Get this designed & installed by us

Statutory

  • This is an enquiry BOQ, not a sanctioned design. A licensed consultant stamps the drawing before construction.
  • A chartered structural engineer has to run the final analysis, including second-order effects, and stamp the GA before fabrication.
  • Building permission is from the local authority. Wind is the speed you entered. Ahmedabad and other cities are not assumed.

PEB shed BOQ

Proactive Industrial Private LimitedGSTIN: 24AAQCP1475R1ZLRegistered office: C-119, Siddhivinayak Business Tower, Makarba, Sarkhej, Ahmedabad, Gujarat 380051Branch offices: Vadodara | Padal (Kheda) | Bharuch

Supply

  • PEB primary frame 20 MT

    15.25 t (15,251 kg) of built-up steel, including an 8% allowance for splices, stiffeners and base plates. Billed as kg × the 20 MT catalogue lot divided by 20,000 kg (₹116.40/kg). Not a whole 20 MT lot. Haunch 650×180×8 web 6 mm. Apex 350 mm. E250, fy 250. · IS 800 / IS 2062

    15251 kg × —

    GST —

    Amount —

  • Z purlin 1 MT

    Z 200×2.0 purlins at 1.6 m, Z 160×2.0 girts at 1.6 m. 6.95 t of Z, billed to 0.01 t, not rounded up to a whole MT. C girts are not a separate price. · IS 801 / IS 800

    6.95 MT × —

    GST —

    Amount —

  • PEB galvalume sheet 100 m2

    Calc 2,063 m² | Billed 2,100 m². Roof 1,013 m² and walls 1,050 m², laps included. The catalogue sells a 100 m² lot, so the billed area is that lot stepped up. Rate is the lot price divided by 100. · IS 875-1

    2100 m2 × —

    GST —

    Amount —

  • PEB sag rod lot

    Calc 960 m² of plan | the catalogue sag-rod lot is taken as 500 m², so this line is that area × (lot price / 500). Not one ₹49,900 lot unless the plan is 500 m². · IS 800

    960 m2 × —

    GST —

    Amount —

  • ISA 75x75x6 12 m

    23 bracing members in 3 braced bays (8 bays). Roof diagonal 20.9 m, wall diagonal 9.2 m, cut from 12 m lengths. Two roof diagonals and two wall diagonals per braced bay, plus one strut in each unbraced bay. · IS 800 / IS 808

    23 length × —

    GST —

    Amount —

  • foundation anchor bolt M24 grade 8.8

    4 bolts a column, M24, embedment 600 mm, projection 100 mm, pitch 150 mm, gauge 180 mm. Catalogue hex bolts stop at 250 mm, so this foundation bolt is not priced from them. · IS 800 / IS 5624

    72 no. × —

    GST —

    Amount —

  • PEB eave gutter

    Both eaves, 96 m. No gutter is in the catalogue. · IS 875-2

    96 m × —

    GST —

    Amount —

  • GI pipe 150 NB heavy

    8 drops of 150 NB, 60.8 m including a shoe. The catalogue figure is a per-metre rate, so this line is metres, not a count of 6 m lengths. · IS 1239

    60.8 m × —

    GST —

    Amount —

  • cement OPC 53

    18 pedestals 600×600×900 mm plus 75 mm PCC. 6.7 m³ at 400 kg/m³, M25. · IS 456

    54 bag × —

    GST —

    Amount —

  • TMT 16 Fe500D

    642 kg in the pedestals at 110 kg/m³, counted as 16 mm bars of 12 m. PCC is unreinforced. · IS 1786

    34 bar × —

    GST —

    Amount —

  • GI flashing

    Eaves and gables, 2 × 48 m + 2 × 20 m. The sourced piece is 1.829 m and the rate is per metre. · IS 875-1

    136 m × —

    GST —

    Amount —

  • GI ridge cap

    Ridge along the length, 48 m. Same sourced piece as the flashing, priced per metre. · IS 875-1

    48 m × —

    GST —

    Amount —

  • self-drilling sheeting screw box 500

    2,063 m² of sheet, about 6 screws a square metre, boxes of 500. · IS 875-1

    25 box × —

    GST —

    Amount —

  • polycarbonate skylight

    About 3% of the plan, minimum 3 m². 10 mm multiwall sheet, the published ₹45 a square foot converted to m². · IS 875-1

    29 m2 × —

    GST —

    Amount —

  • turbo ventilator 24 inch

    One 600 mm ventilator about every 150 m² of plan, and at least two. · IS 875-1

    7 no. × —

    GST —

    Amount —

  • silicone sealant 280 ml

    Sealant on the gutter and the ridge, one cartridge about every 12 m. · Site practice

    12 no. × —

    GST —

    Amount —

  • red oxide metal primer 1 L

    Primary and secondary steel, an allowance of 25 m² a tonne, 22.2 t. About 555 m². Two coats, an allowance of 10 m² per litre per coat. · IS 1477

    111 L × —

    GST —

    Amount —

  • synthetic enamel finish 1 L

    Primary and secondary steel, an allowance of 25 m² a tonne, 22.2 t. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate. · IS 1477

    56 L × —

    GST —

    Amount —

  • welding electrode E6013 3.15 mm

    Site splice allowance, 2 kg a frame, 9 frames. Shop welds are in the primary steel. · AWS A5.1

    18 kg × —

    GST —

    Amount —

  • transport to site

    PEB shed transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

Supply subtotal—

Installation

  • testing and commissioning

    PEB shed testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    PEB shed erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

Installation subtotal—

GST —

Grand total —

Supply is the material and the transport. Installation is erection, testing and commissioning, and the other site services. Each section has its own ex-GST subtotal. GST and the grand total follow. A catalogue match is used when the catalogue has a price. Where it does not, the rate is a published Indian marketplace or maker price plus 20%, and the source is on the line. Every material rate is ex-GST, and GST at 18% is added on it. A published price that already included GST is converted to the ex-GST figure and 18% is shown separately. Erection and installation labour is 10% of that system's material subtotal, testing and commissioning 2%, and transport 3%, with GST at 18% on those allowances.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 150 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.