Engineering hub
Engineering Hub: System Design, Drawings & BOQ
RO and ZLD
Get this designed & installed by us
Permeate and a flux check. The skid is the existing catalogue size when it matches.
Process datasheet
Recovery and flux are inputs
- Recovery 75% and flux 15–20 LMH are the usual band. Confirm on the projection.