Engineering hub
Engineering Hub: System Design, Drawings & BOQ
Projects / ETP / Screening, equalisation and oil
Screening, equalisation and oil
Get this designed & installed by us
Equalisation volume from the hold time.
CPCB
Volume = flow × HRT
- Discharge still has to meet the CPCB or GPCB limit. This volume does not treat the water.
