Engineering hub

Engineering Hub: System Design, Drawings & BOQ

Projects / ETP / Screening, equalisation and oil

Screening, equalisation and oil

Get this designed & installed by us

Equalisation volume from the hold time.

CPCB

Volume = flow × HRT

  • Discharge still has to meet the CPCB or GPCB limit. This volume does not treat the water.