Engineering hub

Engineering Hub: System Design, Drawings & BOQ

Enter the duty, or describe any requirement and attach the drawing. AutoCAD, PDF, a spreadsheet or a photograph is accepted. The desk sizes what it can from NBC 2016 Part 4, IS 15105, IS 3844, IS 13039, TAC, NFPA 13, NFPA 20, IS 732, IS 3043, IS 2189, ISHRAE and ASHRAE 62.1, draws the P&ID or single-line diagram, the scaled plan, both elevations, section A-A and the isometric, and writes the bill. A PEB shed takes length, width, eave, bay, slope, basic wind speed, crane and cladding, and draws the framing plan, the anchor bolt plan, both elevations, section A-A and a rotatable 3D model. Fire suppression and fire detection sit under Fire protection, not as a separate project type. A mark you add on the sheet is saved with the download. A licensed engineer still stamps the issue.

Choose project type

Electrical is selected. The subcategories for this type are under this list. The drawing and the bill further down are the existing type page. A catalogue price is used when it matches. Otherwise a published Indian rate plus 20% is shown with its source. Erection is 10% of that system's materials, testing 2%, and transport 3%.

Subcategories

Each subcategory has its own design basis, calculation, drawings, bill and quotation.

Electrical

Incoming gear and the cable. A load list still has to be done by the electrical designer.

AutoCAD DWG or DXF, PDF, or any other file.

Factoryclix

Rev A

SHEET 1 OF 6

415 V distributionTR-1Transformer1 no.400 kVAACBMain ACB1 no.800 AMCCBFeeder MCCB3 no.400 kVA · 556 A at 415 VCable 2 × 185 mm² · 1.21% drop · 100 mEquipment quantities are the bill. Plan, elevations and section A-A share one scale.Factoryclix / Proactive Industrial Pvt LtdElectricalDRAWINGSingle line diagramSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis Demand 400 kVA · Cable 2 × 185 mm² · 1.21% drop
  • 2,000 m² is the area of one floor, 2 floors, 8 m height. Sprinkler heads, sprinkler branch pipe and smoke detectors are that floor counted again on every floor. The sprinkler pump stays on the remote design area.
  • Prices on the quotation are ex-GST. A catalogue match is used first. Where the catalogue has no price, a published Indian rate plus 20% is used and the source is on the line. GST at 18% is added on every material line. A price the source already quoted including GST is converted to the ex-GST rate and 18% is shown separately. Erection and installation labour is 10% of that system's material subtotal, testing and commissioning 2%, and transport 3%. GST 18% is added on those allowances.
  • Standards cited on this desk: NBC 2016 Part 4, IS 15105, IS 3844, IS 13039, TAC, NFPA 13, NFPA 20, IS 732, IS 3043, IS 2189, ISHRAE and ASHRAE 62.1.

Calculation

PartFormulaWorkingResultStandard
DemandkVA = (kW × diversity) / power factor100 W/m² × 2,000 m² per floor × 2 floors = 400.0 kW. Diversity 0.8, pf 0.8.400 kVANBC Part 8 / IS 732
CableThe larger of current-carrying capacity and voltage drop556 A over 50 m. Allowable drop 5.0%. 2 aluminium XLPE runs of 185 mm², each carrying 278 A. Reactance 0.08 ohm/km.2 × 185 mm² · 1.21% dropIS 3961 / IS 7098 / IS 732

Design basis

PartSpecificationStandard
distribution transformer 400400 kW connected, 400 kVA after diversity and power factor. 1 × 400 kVA is the next standard rating at or above that demand.IS 1180
ACB 800Main incomer. Calculated current 556 A. Next standard frame at or above that current is 800 A.IEC 60947-2 / NBC Part 8
MCCB 630Feeder breakers. Calculated current 556 A. Next frame at or above that current is 630 A. One on each floor plus the incomer, and extra frames only when one breaker cannot carry the current.IEC 60947-2
power cable 1852 parallel runs × 50 m of 185 mm² aluminium XLPE. The catalogue figure is a per-metre rate, not a 100 m drum. Voltage drop 1.21% against an allowable 5%.IS 3961 / IS 7098
cable tray 300Tray allowance. A 2.5 m length is the catalogue unit.NBC Part 8
pipe earth pitPipe or plate earth pit. Not an ESE lightning-earthing set. Resistance is proved on site. Price on request when the catalogue has no pit rate.IS 3043
Cable glandTwo glands on each cable run, 2 runs. 25 mm is the published gland. Confirm the cable OD before the order.IS 12943
Cable lugFour 70 mm² lugs a cable end, for a 3.5-core or 4-core termination. 70 mm² is the termination allowance.IS 8309
Junction boxOne 150×150 mm GI box about every 80 m² of each floor.IS 732
MCBLighting circuits, about eight lamps a breaker.IEC 60898
LightOne 100 W lamp about every 64 m², on each of 2 floors.Site practice
SignOne danger board at the incomer and one on each floor.CEA
SealantSealant for cable entries, one cartridge a floor.Site practice
TestingElectrical testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionElectrical erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TransportElectrical transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice

Get this designed & installed by us

Statutory

  • This is an enquiry BOQ, not a sanctioned design. A licensed consultant stamps the drawing before construction.
  • The electrical drawing is signed by a licensed electrical contractor or chartered engineer where the supply authority asks for it.

Electrical BOQ

Proactive Industrial Private LimitedGSTIN: 24AAQCP1475R1ZLRegistered office: C-119, Siddhivinayak Business Tower, Makarba, Sarkhej, Ahmedabad, Gujarat 380051Branch offices: Vadodara | Padal (Kheda) | Bharuch

Supply

  • distribution transformer 400

    400 kW connected, 400 kVA after diversity and power factor. 1 × 400 kVA is the next standard rating at or above that demand. · IS 1180

    1 no. × —

    GST —

    Amount —

  • ACB 800

    Main incomer. Calculated current 556 A. Next standard frame at or above that current is 800 A. · IEC 60947-2 / NBC Part 8

    1 no. × —

    GST —

    Amount —

  • MCCB 630

    Feeder breakers. Calculated current 556 A. Next frame at or above that current is 630 A. One on each floor plus the incomer, and extra frames only when one breaker cannot carry the current. · IEC 60947-2

    3 no. × —

    GST —

    Amount —

  • power cable 185

    2 parallel runs × 50 m of 185 mm² aluminium XLPE. The catalogue figure is a per-metre rate, not a 100 m drum. Voltage drop 1.21% against an allowable 5%. · IS 3961 / IS 7098

    100 m × —

    GST —

    Amount —

  • cable tray 300

    Tray allowance. A 2.5 m length is the catalogue unit. · NBC Part 8

    25 length × —

    GST —

    Amount —

  • pipe earth pit

    Pipe or plate earth pit. Not an ESE lightning-earthing set. Resistance is proved on site. Price on request when the catalogue has no pit rate. · IS 3043

    2 no. × —

    GST —

    Amount —

  • brass cable gland 25 mm

    Two glands on each cable run, 2 runs. 25 mm is the published gland. Confirm the cable OD before the order. · IS 12943

    4 no. × —

    GST —

    Amount —

  • aluminium cable lug 70 sq mm

    Four 70 mm² lugs a cable end, for a 3.5-core or 4-core termination. 70 mm² is the termination allowance. · IS 8309

    16 no. × —

    GST —

    Amount —

  • GI junction box 150 mm

    One 150×150 mm GI box about every 80 m² of each floor. · IS 732

    25 no. × —

    GST —

    Amount —

  • MCB 16 A

    Lighting circuits, about eight lamps a breaker. · IEC 60898

    8 no. × —

    GST —

    Amount —

  • LED highbay 100 W

    One 100 W lamp about every 64 m², on each of 2 floors. · Site practice

    63 no. × —

    GST —

    Amount —

  • electrical danger sign

    One danger board at the incomer and one on each floor. · CEA

    3 no. × —

    GST —

    Amount —

  • silicone sealant 280 ml

    Sealant for cable entries, one cartridge a floor. · Site practice

    2 no. × —

    GST —

    Amount —

  • transport to site

    Electrical transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

Supply subtotal—

Installation

  • testing and commissioning

    Electrical testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    Electrical erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

Installation subtotal—

GST —

Grand total —

Supply is the material and the transport. Installation is erection, testing and commissioning, and the other site services. Each section has its own ex-GST subtotal. GST and the grand total follow. A catalogue match is used when the catalogue has a price. Where it does not, the rate is a published Indian marketplace or maker price plus 20%, and the source is on the line. Every material rate is ex-GST, and GST at 18% is added on it. A published price that already included GST is converted to the ex-GST figure and 18% is shown separately. Erection and installation labour is 10% of that system's material subtotal, testing and commissioning 2%, and transport 3%, with GST at 18% on those allowances.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 150 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.