Engineering hub

Engineering Hub: System Design, Drawings & BOQ

Enter the duty, or describe any requirement and attach the drawing. AutoCAD, PDF, a spreadsheet or a photograph is accepted. The desk sizes what it can from NBC 2016 Part 4, IS 15105, IS 3844, IS 13039, TAC, NFPA 13, NFPA 20, IS 732, IS 3043, IS 2189, ISHRAE and ASHRAE 62.1, draws the P&ID or single-line diagram, the scaled plan, both elevations, section A-A and the isometric, and writes the bill. A PEB shed takes length, width, eave, bay, slope, basic wind speed, crane and cladding, and draws the framing plan, the anchor bolt plan, both elevations, section A-A and a rotatable 3D model. Fire suppression and fire detection sit under Fire protection, not as a separate project type. A mark you add on the sheet is saved with the download. A licensed engineer still stamps the issue.

Choose project type

Complete plant is selected. The subcategories for this type are under this list. The drawing and the bill further down are the existing type page. A catalogue price is used when it matches. Otherwise a published Indian rate plus 20% is shown with its source. Erection is 10% of that system's materials, testing 2%, and transport 3%.

Combine subcategories

Tick the subcategories to put on one bill. Each one uses its sample inputs. Fire suppression and detection stay on their own pages, under Fire, because the room decides the quantities. Catalogue prices are filled on the subcategory page. A line with no sample rate is price on request.

Fire protection
HVAC
Piping
Electrical
Fittings and steel
Switchyard
Chemical process
ETP
Solar
Civil
PEB shed

Complete plant

Fire protection, HVAC, electrical, piping, the PEB shed and the rest are sized together. One combined drawing set, and a separate drawing set and bill for each system.

Design flow 200 m³/day · 10 m³/h · clarifier 50 m³

Shed plan 48 × 20 m · ridge 8.00 m · 9 frames · 15.3 t · Vb 39 m/s · eave 7 m

AutoCAD DWG or DXF, PDF, or any other file.

Factoryclix

Rev A

SHEET 1 OF 6

FIREFire protection204 m³/h · 3,400 L/min · 88 mHVACHVAC182 TR · 72,800 cfmPIPINGPiping100 NB · 1.70 m/s · 300 mELECTRICALElectrical400 kVA · 556 AFITTINGSFittings and steel8 ISMB 300 · 8 ISMC 150 (1,574.4 kg) · 16 ISASWITCHYARDSwitchyard11 kV · 1 × 400 kVAPROCESSChemical process2000 L · condenser 5 m²ETPETP200 m³/day · 10 m³/h · clarifier 50 m³SOLARSolar110.16 kWp · 204 × 540 WpCIVILCivil600 m³ · 1,80,000 kgPEBPEB shed9 frames · 15.3 t · Vb 39 m/s · eave 7 mFactoryclix / Proactive Industrial Pvt LtdComplete plantDRAWINGP&IDSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis Each block is that system. Quantities on every sheet match the bill.
  • 2,000 m² is the area of one floor, 2 floors, 8 m height. Sprinkler heads, sprinkler branch pipe and smoke detectors are that floor counted again on every floor. The sprinkler pump stays on the remote design area.
  • Prices on the quotation are ex-GST. A catalogue match is used first. Where the catalogue has no price, a published Indian rate plus 20% is used and the source is on the line. GST at 18% is added on every material line. A price the source already quoted including GST is converted to the ex-GST rate and 18% is shown separately. Erection and installation labour is 10% of that system's material subtotal, testing and commissioning 2%, and transport 3%. GST 18% is added on those allowances.
  • Standards cited on this desk: NBC 2016 Part 4, IS 15105, IS 3844, IS 13039, TAC, NFPA 13, NFPA 20, IS 732, IS 3043, IS 2189, ISHRAE and ASHRAE 62.1.
  • Pipe bore is from Q = vA. The metreage is the length you entered, or an allowance from the floor area when that length is left blank.
  • Effluent design flow is 200 KLD, which is 200 m³/day, at 10 m³/h over 20 hours. The clarifier is the next standard size, 50 m³.
  • The shed calculation is a preliminary to IS 800 and IS 875. A licensed structural engineer stamps the drawing before fabrication.
  • Single span 48 × 20 m, eave 7 m, 9 pinned-base rigid frames at 6 m. Ends are rigid frames too, not bearing frames.
  • Terrain category 2, class from the longer side, topography factor 1, openings 5–20% so Cpi is ±0.5. The site basic wind speed is the value you entered from IS 875-3. It is not a city lookup.
  • Knee moment wL²/16 is a preliminary pinned-portal value. It is not a second-order frame analysis, and it is not a sanction.
  • Catalogue lots are used where they exist. Anchor bolts, the eave gutter, skylights, sandwich panels, a crane above 10 t and a plate-girder runway use a published Indian rate plus 20%. Erection is 10% of this system's material subtotal, testing and commissioning 2%, and transport 3%.

Calculation

PartFormulaWorkingResultStandard
Pump flowIS 13039 table by hazard and number of hydrantshigh hazard. 6 hydrants from 30 m yard spacing. Table 3 duty 2,850 L/min. Sprinkler demand 3,250 L/min. Selected catalogue pump 3,400 L/min (204 m³/h), the next listed duty at or above 3,250 L/min.204 m³/h · 3,400 L/minIS 13039:2014 Table 3
Pump headThe higher of the table pressure and static + friction + residualTable pressure 8.8 kg/cm². Hazen–Williams on 3,400 L/min, 200 mm, C 120, L 191 m gives 3.6 m. Remote residual 3.5 bar. Velocity 1.80 m/s.88 mIS 13039:2014 / IS 3844
Jockey4 percent of the main pump, between 3 and 5 percent, at main head plus 5 m4 percent of 3,400 L/min is 136 L/min. Head 88 m + 5 m.180 L/min at 93 mIS 13039:2014 cl. 5.1.9
Fire waterTank = the larger of the sprinkler reserve and a hydrant reserve scaled to the hydrant countSprinkler 3,250 L/min × 90 min = 292.5 m³. Hydrant reserve scales the table pump 2,850 L/min by 6 / 20 hydrants over 3 h = 153.9 m³. Not the full table pump × duration.293 m³IS 13039:2014 Table 4
Sprinkler demandQ = density × area of operationhigh hazard: 12.5 mm/min × 260 m², the most remote design area. Not the 2,000 m² floor and not × 2 floors.3,250 L/minIS 15105 / NFPA 13
DetectionArea ÷ detector coverage, and travel to a call pointSmoke 68: one per 60 m² of the 2,000 m² floor, × 2 floors. Heat 0. Flame 0. Beam 0. Call points 4. Sounders 2. Addressable panel, 72 devices.72 devices · 1 panelIS 2189 / NFPA 72
Suppression mediumMedium from the risk, then the code density or flooding factorOrdinary or light hazard density over the code area of operation. 68°C pendent. Hydrant and hose remain the manual system.Water, wet-pipe sprinklerIS 15105 / NFPA 13
Sprinkler heads(Area per floor ÷ coverage) × floors2,000 m² per floor ÷ 9 m² = 223 heads on one floor × 2 floors. Pump flow stays on the remote design area.446 headsIS 15105 / NFPA 13
Cooling loadTR = (area per floor × floors) ÷ m² per TR2,000 m² × 2 floors ÷ 22 m²/TR.182 TRISHRAE / ASHRAE 62.1
Supply airThe larger of 400 cfm/TR and outdoor airCoil 72,800 cfm. Outdoor air 200 people × 10 L/s + 0.3 L/s·m² = 6,781 cfm.72,800 cfmASHRAE 62.1 / NBC Part 8
Pipe bored from Q = v × π d² / 4800 L/min held to 2 m/s100 NB · 1.70 m/s · 300 mIS 1239
DemandkVA = (kW × diversity) / power factor100 W/m² × 2,000 m² per floor × 2 floors = 400.0 kW. Diversity 0.8, pf 0.8.400 kVANBC Part 8 / IS 732
CableThe larger of current-carrying capacity and voltage drop556 A over 50 m. Allowable drop 5.0%. 2 aluminium XLPE runs of 185 mm², each carrying 278 A. Reactance 0.08 ohm/km.2 × 185 mm² · 1.21% dropIS 3961 / IS 7098 / IS 732
Pipe rackPrimary beams from the floor area, one per 250 m² and at least four2,000 m² of one floor. Columns and braces follow the beams. Not a fire-water duty.8 ISMB 300 · 8 ISMC 150 (1,574.4 kg) · 16 ISAIS 800 / IS 808
YardNext standard transformer at or above the demand. 33 kV from 1,600 kVA, otherwise 11 kV400 kVA demand, 556 A at 415 V. This is the yard, not the fire pump.11 kV · 1 × 400 kVAIEC 62271 / IS 1180
DemandkVA = (kW × diversity) / power factor100 W/m² × 2,000 m² per floor × 2 floors = 400.0 kW. Diversity 0.8, pf 0.8.400 kVANBC Part 8 / IS 732
CableThe larger of current-carrying capacity and voltage drop556 A over 50 m. Allowable drop 5.0%. 2 aluminium XLPE runs of 185 mm², each carrying 278 A. Reactance 0.08 ohm/km.2 × 185 mm² · 1.21% dropIS 3961 / IS 7098 / IS 732
ReactorWorking volume = batch / 0.8 fill1,000 L / 0.82,000 LASME VIII / process datasheet
CondenserA = m Cp ΔT / (t × U × LMTD)1,000 kg, Cp 4.187, ΔT 45 K, 2 h, U 500 W/m²K, LMTD 23 K5 m²TEMA
Hydraulic loadm³/h = KLD / operating hours200 m³/day / 20 h10.0 m³/hCPCB / GPCB consent
ClarifierThe larger of detention volume and SOR area × side-water depthSOR 0.8 m/h needs 12.5 m², which is 37.5 m³ at 3 m side-water depth. Detention 2.5 h needs 25.0 m³. The clarifier is the next standard size at or above 37.5 m³.37.5 m³ required; 50 m³ standard size selectedCPCB manual
ArraykWp = daily kWh / (peak sun hours × performance ratio)Roof limit 110.0 kWp. Load-side 591.7 kWp. The array is sized to 110.0 kWp, then counted in 540 Wp modules so the installed array is not under that figure. Sun hours 5.2, PR 0.78.110.16 kWp · 204 modules · 446.8 kWh/dayIEC 61215 / IEC 62109
ConcreteV = area per floor × floors × slab thickness2,000 m² per floor × 2 floors × 150 mm600.0 m³IS 456
ReinforcementSteel = built-up area × kg/m² for an RCC frame4,000 m² × 45 kg/m². A slab-only 15 kg/m² is low for RCC framing; 35–50 kg/m² is the usual band. Cement stays 400 kg/m³ of the 600.0 m³ slab, in 50 kg bags.1,80,000 kg · 4,800 bagsIS 456 / IS 1786
GeometryBays = round(length / asked bay). Rise = (span / 2) × 1/slope48 m × 20 m, eave 7 m. Asked bay 6 m becomes 8 bays at 6 m. Slope 1 in 10, θ 5.71°. Rise 1 m. Ridge 8 m. Rafter 10.05 m. 9 frames, 18 columns.9 frames · bay 6 m · rise 1 mIS 800
Dead loadSheet + fixings + sag rods + purlin self-weight + servicesSheet and fixings 0.07 kN/m². Sag rods and clips 0.03. Purlin self-weight 0.038 kN/m² from Z 200×2.0. Services 0.02. Wall cladding on the column 0.12 kN/m², separate from the roof UDL.0.158 kN/m² on planIS 875-1
Live load0.75 kN/m² up to 10°, then less 0.02 per degree, minimum 0.40. No roof access.θ 5.71°. At or under 10°, so 0.75 kN/m².0.75 kN/m²IS 875-2
WindVz = Vb k1 k2 k3 k4. pz = 0.6 Vz². pd = Kd Ka Kc pzVb 39 m/s. k1 1.00 for a 50-year general building. k2 0.98 at mean roof height 7.5 m, terrain category 2, class B, Table 2. k3 1.00, flat site. k4 1. Vz 38.22 m/s. pz 0.876 kN/m². Kd 0.90, Ka 0.8 on 120 m², Kc 0.90. pd 0.568 kN/m². Wall Cpe +0.70 / −0.25. Roof Cpe -0.97 / -0.6. Cpi ±0.50. Internal pressure cancels in the net sway.Vz 38.2 m/s · pd 0.568 kN/m²IS 875-3:2015
Rigid framePinned-base knee moment wL²/16. Sway moment (H/2)×eave. Section by N/Nd + M/Md ≤ 1Service roof UDL 5.45 kN/m per frame. Governing case 1.2 (DL+LL+WL): 258.6 kNm and 71.4 kN. fy 250 MPa, γm0 1.1. Haunch 650 mm, flanges 180×8, web 6. Apex 350 mm. Elastic modulus, class 3 limit on outstand and web. Second-order analysis is still required. Wind sway 22.7 kN a frame.15.3 t primary · 650 mm haunchIS 800:2007
SecondariesContinuous Z, M = wL²/10. fy 345 MPa. Spacing reduced until Ze fits.Purlin span is the bay, 6 m. Design pressure 1.36 kN/m². Z 200×2.0 at 1.6 m, Ze 36 cm³. Girts Z 160×2.0 at 1.6 m for wall pressure 1.05 kN/m². 15 purlin lines, side girt lines 6.6.95 t · Z 200×2.0IS 801 / IS 800
Bracing, bolts, baseX-bracing in end bays and mid bay when the shed is long. Pedestal volume × 400 kg/m³ cement and 110 kg/m³ steel.3 braced bays, 23 lengths of ISA 75x75x6. Anchor M24 × 72. Pedestals 6.7 m³, 54 bags, 34 bars. Gutter 96 m. Downpipes 8 × 150 NB.72 bolts · 6.7 m³IS 800 / IS 456

Design basis

PartSpecificationStandard
SprinklerPendent sprinkler, 68°C. Coverage 9 m². 223 heads on one floor of 2,000 m² × 2 floors. The water demand is the remote design area, not this head count. Ordinary or light hazard density over the code area of operation. 68°C pendent. Hydrant and hose remain the manual system.IS 15105 / NFPA 13
ExtinguisherABC powder extinguisher, 6 kg, IS 15683 marking. 20 on one floor of 2,000 m² (one per 100 m², at least two) × 2 floors.IS 15683 / NFPA 10
Hose reelFirst-aid hose reel, 20 mm or 25 mm, 30 m hose, shut-off nozzle. 3 per floor of 2,000 m² (one per 800 m², at least one) × 2 floors.IS 884 / IS 3844
Landing valveInternal landing valve, 63 mm female instantaneous outlet, oblique, flanged inlet. Wet riser 200 mm NB. One per 1,000 m² of each floor, and at least one on every floor.IS 3844 / IS 5290 / NFPA 14
Wet riserWet riser, 200 mm NB, GI heavy, 8 m. The catalogue figure is a per-metre rate, not a 6 m length. Fire-red finish to IS 5.IS 3844 / IS 1239 / NFPA 14
External hydrantSingle-outlet stand post, 80 mm, outlet 1 m above ground, 63 mm instantaneous coupling. One post per 30 m of external wall.IS 13039:2014 / IS 908 / NFPA 24
Double hydrantDouble-headed stand post, 100 mm, within 15 m of the storage or process block so two jets can reach the roof.IS 13039:2014 cl. 4.13 / IS 908
Ring mainHydrant ring main, 200 mm NB, 179 m. The catalogue figure is a per-metre rate, not a 6 m length. Buried mains coated and wrapped to IS 10221.IS 13039:2014 / NFPA 24
Section valveSluice valve on the ring main, flanged, to isolate a section without shutting the yard.IS 780 / IS 13039:2014
Delivery hoseNon-percolating delivery hose, 63 mm × 15 m, two lengths at each external hydrant.IS 636 / IS 13039:2014
Branch and nozzleBranch pipe and nozzle, 63 mm instantaneous inlet, with nozzle spanner.IS 903
Hose boxWeatherproof hose box at each external hydrant, holding two hoses, the branch and the nozzle.IS 13039:2014
Brigade inletFire-brigade breeching inlet, 4-way, on the wet riser, within sight of the fire-service approach.IS 904 / IS 3844
Sprinkler pipeSprinkler range and branch pipe, 25 mm NB, GI medium. About 0.22 m of pipe per m², 2,000 m² × 2 floors. The catalogue figure is a per-metre rate.IS 1239 / IS 15105
Fire pump204 m³/h (3,400 L/min) at 88 m. Same flow on the calculation, the drawing and this line. Nearest catalogue pump at or above the duty.IS 12469 / IS 13039:2014 / NFPA 20
Diesel pumpDiesel standby, same 3,400 L/min at 88 m as the electric pump.IS 12469 / NFPA 20
Jockey pumpJockey 180 L/min at 93 m, about 4 percent of the main flow and 5 m above the main head. A catalogue jockey is used when its flow is at least this duty and its head is within 15 percent above it. If none is that close, the next catalogue jockey at or above the head is used.IS 12469 / NFPA 20
Fire water tank293 KL required. Nearest catalogue band at or above that volume is 300 KL. ₹/KL is the published band rate, and it is not allowed to rise with size, so this line uses ₹3,360/KL. A lump-sum tank is not used.IS 13039:2014 / NBC 2016 Part 4
Fire alarm panelAddressable panel. 72 devices. Release of Water, wet-pipe sprinkler is from a confirmed detection.IS 2189 / NFPA 72
Smoke detectorOptical smoke detector. One per 60 m² of the 2,000 m² floor, multiplied by 2 floors.IS 2189 / NFPA 72
Manual call pointManual call point at each storey exit. Further points so travel stays within about 22.5 m.IS 2189 / NFPA 72
SounderElectronic sounder so the alarm is heard above the noise of that floor. One per floor as the minimum.IS 2189 / NFPA 72
ElbowRiser offsets and floor outlets on the 200 NB wet riser. Same riser bore as the drawing.ASME B16.9
TeeOne tee at each landing valve, 4 valves.ASME B16.9
Sprinkler elbowOne elbow on each 6 m sprinkler length. 148 lengths, the same count as the sprinkler pipe.ASME B16.9
ReducerOutlet reducers off the 200 NB riser. Catalogue size is the smaller bore.ASME B16.9
CouplingScrewed couplings on the hose-reel take-offs and the drain.ASME B16.11
FlangeTwo flanges on each of 2 section valves and 3 pump connections.ASME B16.5
GasketOne gasket on each of those flanges.ASME B16.20
BoltEight bolts on each flange pair. Calc 40 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count.ISO 4014
StrainerOne strainer on the pump suction.Site practice
Check valveOne non-return valve on each pump discharge. 3 pumps on this duty.API 594
HangerRiser 12 m, ring 179 m, sprinkler branch 888 m. One hanger about every 3 m, 360 clamps, 200 mm to match the line. Price on request unless the catalogue has this bore. An 80 mm clamp is not used on a different line.Site practice
Pressure gaugeSuction, pump discharge and hydrant header. 4 inch dial, 0–10 kg/cm².IS 3624
EscutcheonOne chrome rosette per sprinkler head, 446 heads, the same count as the drawing.IS 15105
Flow switchOne 100 mm vane flow switch on the sprinkler riser of each floor.IS 15105
PrimerFire pipe, outside surface from the riser, ring and branch lengths. About 190 m². Two coats, an allowance of 10 m² per litre per coat.IS 1477
Finish paintFire pipe, outside surface from the riser, ring and branch lengths. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate.IS 1477
Welding rod166 welded joints on elbows, tees and weld-neck flanges. Allowance 0.50 kg a joint.AWS A5.1
SealantOne cartridge a floor for sleeves and the breeching inlet.Site practice
TestingFire protection testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionFire protection erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TransportFire protection transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
air handling unit 60000182 TR from 2,000 m² × 2 floors at the same m²/TR as the cooling tool. Supply 72,800 cfm. 1 × 60,000 cfm = 60,000 cfm, within about 10–20% above the required air.ISHRAE / ASHRAE 62.1 / NBC Part 8
chiller 200182 TR from 2,000 m² × 2 floors. 1 × 200 TR is the next standard chiller at or above that load.ASHRAE / ISHRAE
GI sheet 24 gauge per kgDuct sheet area 345.6 m² is an allowance, not a measured take-off: 240 lengths × 1.2 m × 1.2 m girth. 24 gauge is 0.60 mm, 4.71 kg/m². Weight = duct area × sheet weight = 1,628 kg. Priced per kg of that gauge.SMACNA
fire damperFire and volume dampers. The wall schedule fixes the real count.NBC Part 8
insulation nitrileChilled-pipe insulation, 48 m. The catalogue price is a 2 m tube, so the rate is that price divided by 2.NBC Part 8
Duct elbow346 m of duct. One 90° elbow about every 8 m, so the fittings stay under the duct-sheet allowance. 400 mm is the catalogue size until the duct drawing fixes the throat.SMACNA
Duct teeBranch tees off the same duct allowance.SMACNA
Duct reducerReducers off the same duct allowance.SMACNA
Volume damperVolume dampers in the branches. Fire dampers are already on the bill and are not counted again. 400 mm is the catalogue size.NBC Part 8
DiffuserOne 600×600 mm square diffuser or grille about every 20 m² of the floor. 600×600 is the published size used as the allowance.ISHRAE
Duct hangerGI duct clamps from 345.6 m² of sheet, one about every 3 m². The published piece is a 190 mm round duct clamp.SMACNA
SealantDuct joints on 345.6 m². One cartridge about every 15 m².Site practice
CHW valveChilled-water isolation on a 182 TR plant. Supply, return, bypass and drain. Bore 150 NB is the allowance for that load.API 600
CHW strainerStrainer on the chiller return.Site practice
CHW checkNon-return on the two CHW pumps or the bypass pair.API 594
CHW flangeTwo flanges on each of the four CHW valves.ASME B16.5
CHW gasketOne gasket on each CHW flange.ASME B16.20
BoltEight bolts on each of four CHW valve pairs. Calc 32 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count.ISO 4014
Pressure gaugeCHW supply and return. 4 inch dial, 0–10 kg/cm².IS 3624
HangerCHW pipe hanger allowance, 12 m a floor. One hanger about every 3 m, 8 clamps, 150 mm to match the line. Price on request unless the catalogue has this bore. An 80 mm clamp is not used on a different line.Site practice
TestingHVAC testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionHVAC erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TransportHVAC transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
GI pipe 100 NB heavy300 m, 100 NB from velocity 1.7 m/s, GI heavy. The catalogue figure is a per-metre rate, not a 6 m length.IS 1239
gate valve 100 NBOne isolation about every 30 m.API 600
flange 100 NB class 150 A105Two flanges for each isolation valve, class 150, A105.ASME B16.5
90 elbow 100 NB Sch 40One elbow for each isolation, as an allowance.ASME B16.9
equal tee 100 NB Sch 40Branch tees. A reducer is not added when both ends are the same bore, and a 25 NB union is not put on this line.ASME B16.9
spiral wound gasket 100 NB class 150One gasket each flange pair, class 150.ASME B16.20
CouplingOne screwed coupling about every 12 m.ASME B16.11
StrainerOne strainer about every 60 m.Site practice
Check valveOne non-return valve about every 80 m.API 594
BoltEight bolts on each of the 10 flange pairs already on the pipe bill. Calc 80 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count.ISO 4014
Hanger300 m of pipe. One hanger about every 3 m, 100 clamps, 100 mm to match the line. Price on request unless the catalogue has this bore. An 80 mm clamp is not used on a different line.Site practice
Insulation300 m of pipe insulation. The catalogue price is a 2 m tube, so the rate is that price divided by 2.NBC Part 8
Pressure gaugeOne upstream and one downstream of the control point. 4 inch dial, 0–10 kg/cm².IS 3624
Flow switchOne 100 mm vane flow switch on the duty.Site practice
PrimerOutside of 300 m of 100 NB pipe. About 94 m². Two coats, an allowance of 10 m² per litre per coat.IS 1477
Finish paintOutside of 300 m of 100 NB pipe. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate.IS 1477
Welding rodWelds on the elbows, tees and flanges already counted, 35 joints.AWS A5.1
SealantJoint sealant on the sleeves, one cartridge about every 40 m.Site practice
TestingPiping testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionPiping erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TransportPiping transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
distribution transformer 400400 kW connected, 400 kVA after diversity and power factor. 1 × 400 kVA is the next standard rating at or above that demand.IS 1180
ACB 800Main incomer. Calculated current 556 A. Next standard frame at or above that current is 800 A.IEC 60947-2 / NBC Part 8
MCCB 630Feeder breakers. Calculated current 556 A. Next frame at or above that current is 630 A. One on each floor plus the incomer, and extra frames only when one breaker cannot carry the current.IEC 60947-2
power cable 1852 parallel runs × 50 m of 185 mm² aluminium XLPE. The catalogue figure is a per-metre rate, not a 100 m drum. Voltage drop 1.21% against an allowable 5%.IS 3961 / IS 7098
cable tray 300Tray allowance. A 2.5 m length is the catalogue unit.NBC Part 8
pipe earth pitPipe or plate earth pit. Not an ESE lightning-earthing set. Resistance is proved on site. Price on request when the catalogue has no pit rate.IS 3043
Cable glandTwo glands on each cable run, 2 runs. 25 mm is the published gland. Confirm the cable OD before the order.IS 12943
Cable lugFour 70 mm² lugs a cable end, for a 3.5-core or 4-core termination. 70 mm² is the termination allowance.IS 8309
Junction boxOne 150×150 mm GI box about every 80 m² of each floor.IS 732
MCBLighting circuits, about eight lamps a breaker.IEC 60898
LightOne 100 W lamp about every 64 m², on each of 2 floors.Site practice
SignOne danger board at the incomer and one on each floor.CEA
SealantSealant for cable entries, one cartridge a floor.Site practice
TestingElectrical testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionElectrical erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TransportElectrical transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ISMB 300Pipe-rack primary beams. MOQ is 1 MT.IS 800 / IS 808
ISMC 150Calc 8 lengths of 12 m | Billed 1,574.4 kg at 16.4 kg/m. The catalogue rate is per kg, not per length.IS 808
ISA 75x75x6Bracing angles. MOQ is 1 MT.IS 808
chequered plate 6Walkway plate on the rack.IS 3502
BoltSplice and cleat bolts, eight on each of 8 primary beams. Calc 64 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count.ISO 4014
PrimerPipe-rack steel, an allowance of 1.5 m² an ISMB and 1.2 m² an ISMC, 8 beams. About 22 m². Two coats, an allowance of 10 m² per litre per coat.IS 1477
Finish paintPipe-rack steel, an allowance of 1.5 m² an ISMB and 1.2 m² an ISMC, 8 beams. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate.IS 1477
Welding rod32 site joints, 0.5 kg a joint.AWS A5.1
TestingFittings and steel testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionFittings and steel erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TransportFittings and steel transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
isolator 1111 kV isolators. 1 bay from 400 kVA, at least a line bay and a transformer bay.IEC 62271
vacuum circuit breaker 1111 kV vacuum breaker, one per bay.IEC 62271
lightning arrestor 11One set per bay on the incomer.IEC 60099
current transformer 11Metering CTs, one set per bay.IS 16227
distribution transformer 400400 kVA from the demand equation. 1 × 400 kVA is the next standard rating at or above that demand.IS 1180
EarthingPipe or plate earth pits, not an ESE lightning set. Resistance is proved on site. Not added again when the electrical bill already has the pits. Price on request if the catalogue has no pipe-earth pit.IS 3043
HT cableTransformer tail. One catalogue length of 100 m, 95 mm², 11 kV. The yard drawing fixes the real run.IS 7098 Part 2
Cable glandGlands on the CT, breaker and transformer tails. 25 mm is the published gland.IS 12943
Cable lug70 mm² lugs for those tails. 70 mm² is the termination allowance.IS 8309
ClampClamps on the earth risers and the cable supports. The published rate is an 80 mm U clamp.Site practice
SignDanger boards on the fence. The published board is 11000 V, 200×250 mm, IS 2551, including when this yard is 11 kV.CEA
TestingSwitchyard testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionSwitchyard erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TransportSwitchyard transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
glass lined reactor 20002000 L from the batch and an 80% fill.ASME VIII
distillation column 600Column 600 mm against the reactor volume.Process datasheet
process condenser 5Heat-transfer area 5 m² from Q = U A ΔT.TEMA
scrubber 500Packed scrubber on the vent.Process datasheet
stainless pipe SS316 100 NB Sch 40Calc 300 m | Billed 300 m. The catalogue figure is one 6 m length, so the rate is that price divided by 6. The run follows the floor area, so a small plant and the default plant are not the same length.ASTM A312
ElbowProcess pipe is 50 lengths, 300 m. One elbow about every 12 m. SS316, to match the line.ASME B16.9
TeeBranch tees on the same allowance. SS316, to match the line. A reducer is not added when both ends are the same bore.ASME B16.9
CouplingScrewed couplings on this line. SS316.ASME B16.11
ValveOne isolation about every 30 m. Body SS316 / CF8M, not cast iron.API 600
Check valveOne non-return about every 80 m. SS316.API 594
StrainerOne strainer about every 60 m, ahead of the control valve. SS316 body.Site practice
FlangeTwo flanges on each isolation valve, class 150, SS316.ASME B16.5
GasketOne gasket on each flange.ASME B16.20
BoltEight bolts on each flange pair. Calc 80 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count.ISO 4014
Hanger300 m of process pipe. One hanger about every 3 m, 100 clamps, 100 mm to match the line. Price on request unless the catalogue has this bore. An 80 mm clamp is not used on a different line.Site practice
Pressure gaugeReactor jacket and the line. 4 inch dial, 0–10 kg/cm².IS 3624
Level switchOne tank float switch on the reactor.Process datasheet
Flow switchOne 100 mm vane flow switch on the condenser water.Process datasheet
PrimerOutside of 300 m of 100 NB process pipe where it is carbon steel. Stainless is not painted; confirm before ordering the paint.. About 94 m². Two coats, an allowance of 10 m² per litre per coat.IS 1477
Finish paintOutside of 300 m of 100 NB process pipe where it is carbon steel. Stainless is not painted; confirm before ordering the paint.. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate.IS 1477
Welding rodWelds on 50 fittings.AWS A5.1
SealantFlange and sleeve sealant.Site practice
TestingChemical process testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionChemical process erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TransportChemical process transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
clarifier 50200 KLD, 10 m³/h. 37.5 m³ required; 50 m³ standard size selected.CPCB
tube settler 10Lamella ahead of the clarifier.CPCB
filter press 630Sludge dewatering.Process datasheet
RO 5000Polishing RO. Recovery is on the offer.Process datasheet
PAC 25Coagulant, 25 kg packs.COA
dosing skidOne skid for coagulant and one for polymer.Process datasheet
ETP pipeInterconnecting pipe, 50 NB, 400 m, from 200 KLD. The catalogue figure is a per-metre rate.IS 1239
ElbowElbows on the interconnecting pipe.ASME B16.9
TeeBranch tees. A reducer is not added when both ends are 50 NB.ASME B16.9
CouplingScrewed couplings on the dosing and drain lines. A 25 NB union is not put on this 50 NB line.ASME B16.11
ValveIsolation at each tank nozzle.API 600
Check valveNon-return on the transfer pump and the filter feed.API 594
StrainerOne strainer ahead of the pump and one ahead of the RO.Site practice
FlangeTwo flanges on each isolation valve.ASME B16.5
GasketOne gasket on each flange.ASME B16.20
BoltEight bolts on each valve. Calc 160 bolts | Billed 2 lots of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count.ISO 4014
Hanger400 m of ETP pipe. One hanger about every 3 m, 134 clamps, 50 mm to match the line. Price on request unless the catalogue has this bore. An 80 mm clamp is not used on a different line.Site practice
Transfer pumpTransfer pump. Plant flow is 10 m³/h. Next catalogue pump at or above that flow is 10 m³/h at 15 m, an allowance for a short transfer, not a fire pump.ISO 5199
Pressure gaugePump discharge and filter inlet. 4 inch dial, 0–10 kg/cm².IS 3624
Level switchOne tank float switch on the collection tank.Process datasheet
Flow switchOne 100 mm vane flow switch on the treated outlet.Process datasheet
Primer400 m of 50 NB interconnecting pipe. About 63 m². Two coats, an allowance of 10 m² per litre per coat.IS 1477
Finish paint400 m of 50 NB interconnecting pipe. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate.IS 1477
Welding rodFillet allowance on the flanged joints.AWS A5.1
TestingETP testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionETP erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TransportETP transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
PV module 540204 modules × 540 Wp = 110.16 kWp. The count is rounded up so the array is not under the required output.IEC 61215
solar inverter 1002 × 100 kW, the next standard inverter at or above 110.16 kWp.IEC 62109
module mounting structureRoof structure, one catalogue line is 1 kWp.IS 800
DC cableString cable, 2 m a module, 408 m. The catalogue figure is a per-metre rate, not a drum.IEC 62930
AC cableAC run from the inverter, billed in metres. The catalogue match is a per-metre rate.IS 7098
Cable glandGlands at the inverter and the AC isolator. 25 mm is the published gland.IS 12943
Cable lug70 mm² lugs for the AC tails. 70 mm² is the termination allowance.IS 8309
MC4One male-female pair a module. The published price is a pair, so the quantity is the module count, not two pieces.IEC 62852
Junction boxDC combiner, about one per 20 modules. The published box is a 4-in 4-out 1000 V DCDB.IEC 62548
Cable trayTray from the array to the inverter. This is not the building tray.NBC Part 8
TestingSolar testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionSolar erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TransportSolar transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TMT 16 Fe500D1,80,000 kg of steel in the 600 m³ slab, counted as 16 mm bars of 12 m.IS 1786 / IS 456
cement OPC 53M25 at 400 kg/m³ on 600 m³.IS 269 / IS 456
AAC blockBlockwork allowance, about 0.08 m³ per m² of one floor, × 2 floors.IS 2185
ISMB 300Frame beams, counted once for each floor. MOQ is 1 MT.IS 808
river sandFine aggregate, about 0.45 m³ per m³ of slab concrete. Price on request when the catalogue has no sand rate.IS 383
coarse aggregate 20 mm20 mm coarse aggregate, about 0.90 m³ per m³ of concrete. Price on request when the catalogue has no aggregate rate.IS 383
concrete mixerOne site mixer.Site plant
scaffoldingOne scaffold allowance for the slab and the frame. Not a safety harness, and not one line per standard.Site plant
Binding wire1 mm tie wire for 600 m³ of slab, about 1 kg per 5 m³.IS 456
Cover block25 mm cover blocks, about four per m³.IS 456
Shuttering oilFosroc mould oil, about 1 L per 10 m³.IS 456
BoltHolding-down and splice bolts for 10 frame beams. These are catalogue hex bolts, not foundation J-bolts.. Calc 80 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count.ISO 4014
PrimerStructural steel on 10 beams, 1.5 m² a beam. About 15 m². Two coats, an allowance of 10 m² per litre per coat.IS 1477
Finish paintStructural steel on 10 beams, 1.5 m² a beam. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate.IS 1477
Welding rodSite welds on the beam connections, 0.5 kg a beam.AWS A5.1
TestingCivil testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionCivil erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. Labour at 10% of material is low for civil work. This line is an allowance, not a measured labour bill.Site practice
TransportCivil transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
Primary frames15.25 t (15,251 kg) of built-up steel, including an 8% allowance for splices, stiffeners and base plates. Billed as kg × the 20 MT catalogue lot divided by 20,000 kg (₹116.40/kg). Not a whole 20 MT lot. Haunch 650×180×8 web 6 mm. Apex 350 mm. E250, fy 250.IS 800 / IS 2062
Purlins and girtsZ 200×2.0 purlins at 1.6 m, Z 160×2.0 girts at 1.6 m. 6.95 t of Z, billed to 0.01 t, not rounded up to a whole MT. C girts are not a separate price.IS 801 / IS 800
GalvalumeCalc 2,063 m² | Billed 2,100 m². Roof 1,013 m² and walls 1,050 m², laps included. The catalogue sells a 100 m² lot, so the billed area is that lot stepped up. Rate is the lot price divided by 100.IS 875-1
Sag rodsCalc 960 m² of plan | the catalogue sag-rod lot is taken as 500 m², so this line is that area × (lot price / 500). Not one ₹49,900 lot unless the plan is 500 m².IS 800
Bracing23 bracing members in 3 braced bays (8 bays). Roof diagonal 20.9 m, wall diagonal 9.2 m, cut from 12 m lengths. Two roof diagonals and two wall diagonals per braced bay, plus one strut in each unbraced bay.IS 800 / IS 808
Anchor bolts4 bolts a column, M24, embedment 600 mm, projection 100 mm, pitch 150 mm, gauge 180 mm. Catalogue hex bolts stop at 250 mm, so this foundation bolt is not priced from them.IS 800 / IS 5624
Eave gutterBoth eaves, 96 m. No gutter is in the catalogue.IS 875-2
Downpipes8 drops of 150 NB, 60.8 m including a shoe. The catalogue figure is a per-metre rate, so this line is metres, not a count of 6 m lengths.IS 1239
Pedestal concrete18 pedestals 600×600×900 mm plus 75 mm PCC. 6.7 m³ at 400 kg/m³, M25.IS 456
Pedestal steel642 kg in the pedestals at 110 kg/m³, counted as 16 mm bars of 12 m. PCC is unreinforced.IS 1786
FlashingEaves and gables, 2 × 48 m + 2 × 20 m. The sourced piece is 1.829 m and the rate is per metre.IS 875-1
RidgeRidge along the length, 48 m. Same sourced piece as the flashing, priced per metre.IS 875-1
Sheeting screw2,063 m² of sheet, about 6 screws a square metre, boxes of 500.IS 875-1
SkylightAbout 3% of the plan, minimum 3 m². 10 mm multiwall sheet, the published ₹45 a square foot converted to m².IS 875-1
Turbo ventilatorOne 600 mm ventilator about every 150 m² of plan, and at least two.IS 875-1
SealantSealant on the gutter and the ridge, one cartridge about every 12 m.Site practice
PrimerPrimary and secondary steel, an allowance of 25 m² a tonne, 22.2 t. About 555 m². Two coats, an allowance of 10 m² per litre per coat.IS 1477
Finish paintPrimary and secondary steel, an allowance of 25 m² a tonne, 22.2 t. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate.IS 1477
Welding rodSite splice allowance, 2 kg a frame, 9 frames. Shop welds are in the primary steel.AWS A5.1
TestingPEB shed testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionPEB shed erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
TransportPEB shed transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice

Get this designed & installed by us

Statutory

  • This is an enquiry BOQ, not a sanctioned design. A licensed consultant stamps the drawing before construction.
  • Fire NOC from the local authority. In Gujarat, the Fire Prevention and Life Safety Measures Act applies to the buildings it covers.
  • Suppression medium is Water, wet-pipe sprinkler. Ordinary or light hazard density over the code area of operation. 68°C pendent. Hydrant and hose remain the manual system. A licensed fire consultant stamps the design before the Fire NOC.
  • The heat load, fresh-air schedule and fire-damper schedule are part of the design. ECBC applies to a commercial building above the state threshold. A licensed MEP consultant stamps the drawing before construction.
  • Steam pipe is an IBR job. Petroleum, solvent and compressed-gas lines follow PESO where the storage crosses the threshold. Hot or large-bore lines need a pipe-stress check.
  • The electrical drawing is signed by a licensed electrical contractor or chartered engineer where the supply authority asks for it.
  • The pipe rack is a structure. A structural engineer designs it to IS 800 and IS 875 and stamps the GA before fabrication.
  • The supply authority clears the yard drawing. A licensed electrical engineer signs it. CEA safety regulations and the state electrical inspector apply to the high-voltage installation.
  • Pressure parts follow the IBR or PESO route when the duty is steam, a petroleum product or a compressed gas. Factory licence and the state factory inspector apply to the plant. A chartered engineer checks the datasheet before fabrication.
  • Consent to Establish and Consent to Operate from the State Pollution Control Board. In Gujarat that is GPCB. Hazardous sludge needs authorisation under the Hazardous and Other Wastes Rules. The consent limits replace this allowance.
  • Net metering is with the DISCOM. The electrical inspector (CEIG) clears the plant where the state rule requires it. Use ALMM modules when the tender or the DISCOM asks. Earthing is IS 3043.
  • Building permission from the local authority. Structural design is stamped to NBC, IS 456 and IS 1893. Ahmedabad is seismic zone III unless the site geotech says otherwise. IS 875 covers wind on a shed.
  • A chartered structural engineer has to run the final analysis, including second-order effects, and stamp the GA before fabrication.
  • Building permission is from the local authority. Wind is the speed you entered. Ahmedabad and other cities are not assumed.

Complete plant BOQ

Proactive Industrial Private LimitedGSTIN: 24AAQCP1475R1ZLRegistered office: C-119, Siddhivinayak Business Tower, Makarba, Sarkhej, Ahmedabad, Gujarat 380051Branch offices: Vadodara | Padal (Kheda) | Bharuch

Supply

  • sprinkler pendant 68

    Pendent sprinkler, 68°C. Coverage 9 m². 223 heads on one floor of 2,000 m² × 2 floors. The water demand is the remote design area, not this head count. Ordinary or light hazard density over the code area of operation. 68°C pendent. Hydrant and hose remain the manual system. · IS 15105 / NFPA 13

    446 no. × —

    GST —

    Amount —

  • ABC powder extinguisher 6 kg

    ABC powder extinguisher, 6 kg, IS 15683 marking. 20 on one floor of 2,000 m² (one per 100 m², at least two) × 2 floors. · IS 15683 / NFPA 10

    40 no. × —

    GST —

    Amount —

  • hose reel

    First-aid hose reel, 20 mm or 25 mm, 30 m hose, shut-off nozzle. 3 per floor of 2,000 m² (one per 800 m², at least one) × 2 floors. · IS 884 / IS 3844

    6 no. × —

    GST —

    Amount —

  • landing valve 63 mm

    Internal landing valve, 63 mm female instantaneous outlet, oblique, flanged inlet. Wet riser 200 mm NB. One per 1,000 m² of each floor, and at least one on every floor. · IS 3844 / IS 5290 / NFPA 14

    4 no. × —

    GST —

    Amount —

  • GI pipe 200 NB heavy

    Wet riser, 200 mm NB, GI heavy, 8 m. The catalogue figure is a per-metre rate, not a 6 m length. Fire-red finish to IS 5. · IS 3844 / IS 1239 / NFPA 14

    8 m × —

    GST —

    Amount —

  • hydrant stand post

    Single-outlet stand post, 80 mm, outlet 1 m above ground, 63 mm instantaneous coupling. One post per 30 m of external wall. · IS 13039:2014 / IS 908 / NFPA 24

    6 no. × —

    GST —

    Amount —

  • hydrant stand post double

    Double-headed stand post, 100 mm, within 15 m of the storage or process block so two jets can reach the roof. · IS 13039:2014 cl. 4.13 / IS 908

    2 no. × —

    GST —

    Amount —

  • MS ERW pipe 200 NB

    Hydrant ring main, 200 mm NB, 179 m. The catalogue figure is a per-metre rate, not a 6 m length. Buried mains coated and wrapped to IS 10221. · IS 13039:2014 / NFPA 24

    179 m × —

    GST —

    Amount —

  • gate valve 200 NB

    Sluice valve on the ring main, flanged, to isolate a section without shutting the yard. · IS 780 / IS 13039:2014

    2 no. × —

    GST —

    Amount —

  • RRL hose 63 mm x 15 m

    Non-percolating delivery hose, 63 mm × 15 m, two lengths at each external hydrant. · IS 636 / IS 13039:2014

    12 length × —

    GST —

    Amount —

  • branch pipe

    Branch pipe and nozzle, 63 mm instantaneous inlet, with nozzle spanner. · IS 903

    6 no. × —

    GST —

    Amount —

  • hose box

    Weatherproof hose box at each external hydrant, holding two hoses, the branch and the nozzle. · IS 13039:2014

    6 no. × —

    GST —

    Amount —

  • breeching inlet

    Fire-brigade breeching inlet, 4-way, on the wet riser, within sight of the fire-service approach. · IS 904 / IS 3844

    1 no. × —

    GST —

    Amount —

  • GI pipe 25 NB

    Sprinkler range and branch pipe, 25 mm NB, GI medium. About 0.22 m of pipe per m², 2,000 m² × 2 floors. The catalogue figure is a per-metre rate. · IS 1239 / IS 15105

    880 m × —

    GST —

    Amount —

  • electric fire pump 3400 LPM 88 m

    204 m³/h (3,400 L/min) at 88 m. Same flow on the calculation, the drawing and this line. Nearest catalogue pump at or above the duty. · IS 12469 / IS 13039:2014 / NFPA 20

    1 no. × —

    GST —

    Amount —

  • diesel fire pump 3400 LPM 88 m

    Diesel standby, same 3,400 L/min at 88 m as the electric pump. · IS 12469 / NFPA 20

    1 no. × —

    GST —

    Amount —

  • jockey pump 180 LPM 93 m

    Jockey 180 L/min at 93 m, about 4 percent of the main flow and 5 m above the main head. A catalogue jockey is used when its flow is at least this duty and its head is within 15 percent above it. If none is that close, the next catalogue jockey at or above the head is used. · IS 12469 / NFPA 20

    1 no. × —

    GST —

    Amount —

  • fire water storage tank 293 KL

    293 KL required. Nearest catalogue band at or above that volume is 300 KL. ₹/KL is the published band rate, and it is not allowed to rise with size, so this line uses ₹3,360/KL. A lump-sum tank is not used. · IS 13039:2014 / NBC 2016 Part 4

    293 KL × —

    GST —

    Amount —

  • Ravel Avani

    Addressable panel. 72 devices. Release of Water, wet-pipe sprinkler is from a confirmed detection. · IS 2189 / NFPA 72

    1 no. × —

    GST —

    Amount —

  • smoke detector

    Optical smoke detector. One per 60 m² of the 2,000 m² floor, multiplied by 2 floors. · IS 2189 / NFPA 72

    68 no. × —

    GST —

    Amount —

  • manual call point

    Manual call point at each storey exit. Further points so travel stays within about 22.5 m. · IS 2189 / NFPA 72

    4 no. × —

    GST —

    Amount —

  • fire alarm sounder

    Electronic sounder so the alarm is heard above the noise of that floor. One per floor as the minimum. · IS 2189 / NFPA 72

    2 no. × —

    GST —

    Amount —

  • 90 elbow 200 NB Sch 40

    Riser offsets and floor outlets on the 200 NB wet riser. Same riser bore as the drawing. · ASME B16.9

    4 no. × —

    GST —

    Amount —

  • equal tee 200 NB Sch 40

    One tee at each landing valve, 4 valves. · ASME B16.9

    4 no. × —

    GST —

    Amount —

  • 90 elbow 25 NB Sch 40

    One elbow on each 6 m sprinkler length. 148 lengths, the same count as the sprinkler pipe. · ASME B16.9

    148 no. × —

    GST —

    Amount —

  • concentric reducer 25 NB Sch 40

    Outlet reducers off the 200 NB riser. Catalogue size is the smaller bore. · ASME B16.9

    2 no. × —

    GST —

    Amount —

  • forged coupling 25 NB

    Screwed couplings on the hose-reel take-offs and the drain. · ASME B16.11

    6 no. × —

    GST —

    Amount —

  • flange 200 NB class 150 A105

    Two flanges on each of 2 section valves and 3 pump connections. · ASME B16.5

    10 no. × —

    GST —

    Amount —

  • spiral wound gasket 200 NB class 150

    One gasket on each of those flanges. · ASME B16.20

    10 no. × —

    GST —

    Amount —

  • hex bolt M16 60 mm grade 8.8

    Eight bolts on each flange pair. Calc 40 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count. · ISO 4014

    1 lot × —

    GST —

    Amount —

  • Y strainer 200 NB

    One strainer on the pump suction. · Site practice

    1 no. × —

    GST —

    Amount —

  • check valve 200 NB

    One non-return valve on each pump discharge. 3 pumps on this duty. · API 594

    3 no. × —

    GST —

    Amount —

  • GI pipe clamp 200 mm

    Riser 12 m, ring 179 m, sprinkler branch 888 m. One hanger about every 3 m, 360 clamps, 200 mm to match the line. Price on request unless the catalogue has this bore. An 80 mm clamp is not used on a different line. · Site practice

    360 no. × —

    GST —

    Amount —

  • pressure gauge

    Suction, pump discharge and hydrant header. 4 inch dial, 0–10 kg/cm². · IS 3624

    3 no. × —

    GST —

    Amount —

  • sprinkler escutcheon

    One chrome rosette per sprinkler head, 446 heads, the same count as the drawing. · IS 15105

    446 no. × —

    GST —

    Amount —

  • flow switch

    One 100 mm vane flow switch on the sprinkler riser of each floor. · IS 15105

    2 no. × —

    GST —

    Amount —

  • red oxide metal primer 1 L

    Fire pipe, outside surface from the riser, ring and branch lengths. About 190 m². Two coats, an allowance of 10 m² per litre per coat. · IS 1477

    38 L × —

    GST —

    Amount —

  • synthetic enamel finish 1 L

    Fire pipe, outside surface from the riser, ring and branch lengths. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate. · IS 1477

    19 L × —

    GST —

    Amount —

  • welding electrode E6013 3.15 mm

    166 welded joints on elbows, tees and weld-neck flanges. Allowance 0.50 kg a joint. · AWS A5.1

    83 kg × —

    GST —

    Amount —

  • silicone sealant 280 ml

    One cartridge a floor for sleeves and the breeching inlet. · Site practice

    2 no. × —

    GST —

    Amount —

  • transport to site

    Fire protection transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • air handling unit 60000

    182 TR from 2,000 m² × 2 floors at the same m²/TR as the cooling tool. Supply 72,800 cfm. 1 × 60,000 cfm = 60,000 cfm, within about 10–20% above the required air. · ISHRAE / ASHRAE 62.1 / NBC Part 8

    1 no. × —

    GST —

    Amount —

  • chiller 200

    182 TR from 2,000 m² × 2 floors. 1 × 200 TR is the next standard chiller at or above that load. · ASHRAE / ISHRAE

    1 no. × —

    GST —

    Amount —

  • GI sheet 24 gauge per kg

    Duct sheet area 345.6 m² is an allowance, not a measured take-off: 240 lengths × 1.2 m × 1.2 m girth. 24 gauge is 0.60 mm, 4.71 kg/m². Weight = duct area × sheet weight = 1,628 kg. Priced per kg of that gauge. · SMACNA

    1628 kg × —

    GST —

    Amount —

  • fire damper

    Fire and volume dampers. The wall schedule fixes the real count. · NBC Part 8

    8 no. × —

    GST —

    Amount —

  • insulation nitrile

    Chilled-pipe insulation, 48 m. The catalogue price is a 2 m tube, so the rate is that price divided by 2. · NBC Part 8

    48 m × —

    GST —

    Amount —

  • duct fitting 90 elbow 400 mm

    346 m of duct. One 90° elbow about every 8 m, so the fittings stay under the duct-sheet allowance. 400 mm is the catalogue size until the duct drawing fixes the throat. · SMACNA

    44 no. × —

    GST —

    Amount —

  • duct fitting tee 400 mm

    Branch tees off the same duct allowance. · SMACNA

    22 no. × —

    GST —

    Amount —

  • duct fitting reducer 400 mm

    Reducers off the same duct allowance. · SMACNA

    15 no. × —

    GST —

    Amount —

  • volume damper 400 mm

    Volume dampers in the branches. Fire dampers are already on the bill and are not counted again. 400 mm is the catalogue size. · NBC Part 8

    5 no. × —

    GST —

    Amount —

  • square diffuser grille

    One 600×600 mm square diffuser or grille about every 20 m² of the floor. 600×600 is the published size used as the allowance. · ISHRAE

    100 no. × —

    GST —

    Amount —

  • duct hanger

    GI duct clamps from 345.6 m² of sheet, one about every 3 m². The published piece is a 190 mm round duct clamp. · SMACNA

    116 no. × —

    GST —

    Amount —

  • silicone sealant 280 ml

    Duct joints on 345.6 m². One cartridge about every 15 m². · Site practice

    24 no. × —

    GST —

    Amount —

  • gate valve 150 NB

    Chilled-water isolation on a 182 TR plant. Supply, return, bypass and drain. Bore 150 NB is the allowance for that load. · API 600

    4 no. × —

    GST —

    Amount —

  • Y strainer 150 NB

    Strainer on the chiller return. · Site practice

    1 no. × —

    GST —

    Amount —

  • check valve 150 NB

    Non-return on the two CHW pumps or the bypass pair. · API 594

    2 no. × —

    GST —

    Amount —

  • flange 150 NB class 150 A105

    Two flanges on each of the four CHW valves. · ASME B16.5

    8 no. × —

    GST —

    Amount —

  • spiral wound gasket 150 NB class 150

    One gasket on each CHW flange. · ASME B16.20

    8 no. × —

    GST —

    Amount —

  • hex bolt M16 60 mm grade 8.8

    Eight bolts on each of four CHW valve pairs. Calc 32 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count. · ISO 4014

    1 lot × —

    GST —

    Amount —

  • pressure gauge

    CHW supply and return. 4 inch dial, 0–10 kg/cm². · IS 3624

    2 no. × —

    GST —

    Amount —

  • GI pipe clamp 150 mm

    CHW pipe hanger allowance, 12 m a floor. One hanger about every 3 m, 8 clamps, 150 mm to match the line. Price on request unless the catalogue has this bore. An 80 mm clamp is not used on a different line. · Site practice

    8 no. × —

    GST —

    Amount —

  • transport to site

    HVAC transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • GI pipe 100 NB heavy

    300 m, 100 NB from velocity 1.7 m/s, GI heavy. The catalogue figure is a per-metre rate, not a 6 m length. · IS 1239

    300 m × —

    GST —

    Amount —

  • gate valve 100 NB

    One isolation about every 30 m. · API 600

    10 no. × —

    GST —

    Amount —

  • flange 100 NB class 150 A105

    Two flanges for each isolation valve, class 150, A105. · ASME B16.5

    20 no. × —

    GST —

    Amount —

  • 90 elbow 100 NB Sch 40

    One elbow for each isolation, as an allowance. · ASME B16.9

    10 no. × —

    GST —

    Amount —

  • equal tee 100 NB Sch 40

    Branch tees. A reducer is not added when both ends are the same bore, and a 25 NB union is not put on this line. · ASME B16.9

    5 no. × —

    GST —

    Amount —

  • spiral wound gasket 100 NB class 150

    One gasket each flange pair, class 150. · ASME B16.20

    20 no. × —

    GST —

    Amount —

  • forged coupling 100 NB

    One screwed coupling about every 12 m. · ASME B16.11

    25 no. × —

    GST —

    Amount —

  • Y strainer 100 NB

    One strainer about every 60 m. · Site practice

    5 no. × —

    GST —

    Amount —

  • check valve 100 NB

    One non-return valve about every 80 m. · API 594

    4 no. × —

    GST —

    Amount —

  • hex bolt M16 60 mm grade 8.8

    Eight bolts on each of the 10 flange pairs already on the pipe bill. Calc 80 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count. · ISO 4014

    1 lot × —

    GST —

    Amount —

  • GI pipe clamp 100 mm

    300 m of pipe. One hanger about every 3 m, 100 clamps, 100 mm to match the line. Price on request unless the catalogue has this bore. An 80 mm clamp is not used on a different line. · Site practice

    100 no. × —

    GST —

    Amount —

  • insulation nitrile

    300 m of pipe insulation. The catalogue price is a 2 m tube, so the rate is that price divided by 2. · NBC Part 8

    300 m × —

    GST —

    Amount —

  • pressure gauge

    One upstream and one downstream of the control point. 4 inch dial, 0–10 kg/cm². · IS 3624

    2 no. × —

    GST —

    Amount —

  • flow switch

    One 100 mm vane flow switch on the duty. · Site practice

    1 no. × —

    GST —

    Amount —

  • red oxide metal primer 1 L

    Outside of 300 m of 100 NB pipe. About 94 m². Two coats, an allowance of 10 m² per litre per coat. · IS 1477

    19 L × —

    GST —

    Amount —

  • synthetic enamel finish 1 L

    Outside of 300 m of 100 NB pipe. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate. · IS 1477

    10 L × —

    GST —

    Amount —

  • welding electrode E6013 3.15 mm

    Welds on the elbows, tees and flanges already counted, 35 joints. · AWS A5.1

    9 kg × —

    GST —

    Amount —

  • silicone sealant 280 ml

    Joint sealant on the sleeves, one cartridge about every 40 m. · Site practice

    8 no. × —

    GST —

    Amount —

  • transport to site

    Piping transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • distribution transformer 400

    400 kW connected, 400 kVA after diversity and power factor. 1 × 400 kVA is the next standard rating at or above that demand. · IS 1180

    1 no. × —

    GST —

    Amount —

  • ACB 800

    Main incomer. Calculated current 556 A. Next standard frame at or above that current is 800 A. · IEC 60947-2 / NBC Part 8

    1 no. × —

    GST —

    Amount —

  • MCCB 630

    Feeder breakers. Calculated current 556 A. Next frame at or above that current is 630 A. One on each floor plus the incomer, and extra frames only when one breaker cannot carry the current. · IEC 60947-2

    3 no. × —

    GST —

    Amount —

  • power cable 185

    2 parallel runs × 50 m of 185 mm² aluminium XLPE. The catalogue figure is a per-metre rate, not a 100 m drum. Voltage drop 1.21% against an allowable 5%. · IS 3961 / IS 7098

    100 m × —

    GST —

    Amount —

  • cable tray 300

    Tray allowance. A 2.5 m length is the catalogue unit. · NBC Part 8

    25 length × —

    GST —

    Amount —

  • pipe earth pit

    Pipe or plate earth pit. Not an ESE lightning-earthing set. Resistance is proved on site. Price on request when the catalogue has no pit rate. · IS 3043

    2 no. × —

    GST —

    Amount —

  • brass cable gland 25 mm

    Two glands on each cable run, 2 runs. 25 mm is the published gland. Confirm the cable OD before the order. · IS 12943

    4 no. × —

    GST —

    Amount —

  • aluminium cable lug 70 sq mm

    Four 70 mm² lugs a cable end, for a 3.5-core or 4-core termination. 70 mm² is the termination allowance. · IS 8309

    16 no. × —

    GST —

    Amount —

  • GI junction box 150 mm

    One 150×150 mm GI box about every 80 m² of each floor. · IS 732

    25 no. × —

    GST —

    Amount —

  • MCB 16 A

    Lighting circuits, about eight lamps a breaker. · IEC 60898

    8 no. × —

    GST —

    Amount —

  • LED highbay 100 W

    One 100 W lamp about every 64 m², on each of 2 floors. · Site practice

    63 no. × —

    GST —

    Amount —

  • electrical danger sign

    One danger board at the incomer and one on each floor. · CEA

    3 no. × —

    GST —

    Amount —

  • silicone sealant 280 ml

    Sealant for cable entries, one cartridge a floor. · Site practice

    2 no. × —

    GST —

    Amount —

  • transport to site

    Electrical transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • ISMB 300

    Pipe-rack primary beams. MOQ is 1 MT. · IS 800 / IS 808

    8 length × —

    GST —

    Amount —

  • ISMC 150

    Calc 8 lengths of 12 m | Billed 1,574.4 kg at 16.4 kg/m. The catalogue rate is per kg, not per length. · IS 808

    1574.4 kg × —

    GST —

    Amount —

  • ISA 75x75x6

    Bracing angles. MOQ is 1 MT. · IS 808

    16 length × —

    GST —

    Amount —

  • chequered plate 6

    Walkway plate on the rack. · IS 3502

    3 no. × —

    GST —

    Amount —

  • hex bolt M16 60 mm grade 8.8

    Splice and cleat bolts, eight on each of 8 primary beams. Calc 64 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count. · ISO 4014

    1 lot × —

    GST —

    Amount —

  • red oxide metal primer 1 L

    Pipe-rack steel, an allowance of 1.5 m² an ISMB and 1.2 m² an ISMC, 8 beams. About 22 m². Two coats, an allowance of 10 m² per litre per coat. · IS 1477

    5 L × —

    GST —

    Amount —

  • synthetic enamel finish 1 L

    Pipe-rack steel, an allowance of 1.5 m² an ISMB and 1.2 m² an ISMC, 8 beams. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate. · IS 1477

    3 L × —

    GST —

    Amount —

  • welding electrode E6013 3.15 mm

    32 site joints, 0.5 kg a joint. · AWS A5.1

    16 kg × —

    GST —

    Amount —

  • transport to site

    Fittings and steel transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • isolator 11

    11 kV isolators. 1 bay from 400 kVA, at least a line bay and a transformer bay. · IEC 62271

    2 set × —

    GST —

    Amount —

  • vacuum circuit breaker 11

    11 kV vacuum breaker, one per bay. · IEC 62271

    1 no. × —

    GST —

    Amount —

  • lightning arrestor 11

    One set per bay on the incomer. · IEC 60099

    1 set × —

    GST —

    Amount —

  • current transformer 11

    Metering CTs, one set per bay. · IS 16227

    1 set × —

    GST —

    Amount —

  • distribution transformer 400

    400 kVA from the demand equation. 1 × 400 kVA is the next standard rating at or above that demand. · IS 1180

    1 no. × —

    GST —

    Amount —

  • pipe earth pit

    Pipe or plate earth pits, not an ESE lightning set. Resistance is proved on site. Not added again when the electrical bill already has the pits. Price on request if the catalogue has no pipe-earth pit. · IS 3043

    2 no. × —

    GST —

    Amount —

  • HT cable 95 sqmm 11 kV

    Transformer tail. One catalogue length of 100 m, 95 mm², 11 kV. The yard drawing fixes the real run. · IS 7098 Part 2

    1 length × —

    GST —

    Amount —

  • brass cable gland 25 mm

    Glands on the CT, breaker and transformer tails. 25 mm is the published gland. · IS 12943

    6 no. × —

    GST —

    Amount —

  • aluminium cable lug 70 sq mm

    70 mm² lugs for those tails. 70 mm² is the termination allowance. · IS 8309

    12 no. × —

    GST —

    Amount —

  • GI pipe clamp 80 mm

    Clamps on the earth risers and the cable supports. The published rate is an 80 mm U clamp. · Site practice

    12 no. × —

    GST —

    Amount —

  • switchyard danger sign

    Danger boards on the fence. The published board is 11000 V, 200×250 mm, IS 2551, including when this yard is 11 kV. · CEA

    4 no. × —

    GST —

    Amount —

  • transport to site

    Switchyard transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • glass lined reactor 2000

    2000 L from the batch and an 80% fill. · ASME VIII

    1 no. × —

    GST —

    Amount —

  • distillation column 600

    Column 600 mm against the reactor volume. · Process datasheet

    1 no. × —

    GST —

    Amount —

  • process condenser 5

    Heat-transfer area 5 m² from Q = U A ΔT. · TEMA

    1 no. × —

    GST —

    Amount —

  • scrubber 500

    Packed scrubber on the vent. · Process datasheet

    1 no. × —

    GST —

    Amount —

  • stainless pipe SS316 100 NB Sch 40

    Calc 300 m | Billed 300 m. The catalogue figure is one 6 m length, so the rate is that price divided by 6. The run follows the floor area, so a small plant and the default plant are not the same length. · ASTM A312

    300 m × —

    GST —

    Amount —

  • 90 elbow SS316 100 NB Sch 40

    Process pipe is 50 lengths, 300 m. One elbow about every 12 m. SS316, to match the line. · ASME B16.9

    25 no. × —

    GST —

    Amount —

  • equal tee SS316 100 NB Sch 40

    Branch tees on the same allowance. SS316, to match the line. A reducer is not added when both ends are the same bore. · ASME B16.9

    5 no. × —

    GST —

    Amount —

  • forged coupling SS316 100 NB

    Screwed couplings on this line. SS316. · ASME B16.11

    25 no. × —

    GST —

    Amount —

  • gate valve SS316 100 NB

    One isolation about every 30 m. Body SS316 / CF8M, not cast iron. · API 600

    10 no. × —

    GST —

    Amount —

  • check valve SS316 100 NB

    One non-return about every 80 m. SS316. · API 594

    4 no. × —

    GST —

    Amount —

  • Y strainer SS316 100 NB

    One strainer about every 60 m, ahead of the control valve. SS316 body. · Site practice

    5 no. × —

    GST —

    Amount —

  • flange SS316 100 NB class 150 SS316

    Two flanges on each isolation valve, class 150, SS316. · ASME B16.5

    20 no. × —

    GST —

    Amount —

  • spiral wound gasket 100 NB class 150

    One gasket on each flange. · ASME B16.20

    20 no. × —

    GST —

    Amount —

  • hex bolt M16 60 mm grade 8.8

    Eight bolts on each flange pair. Calc 80 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count. · ISO 4014

    1 lot × —

    GST —

    Amount —

  • GI pipe clamp 100 mm

    300 m of process pipe. One hanger about every 3 m, 100 clamps, 100 mm to match the line. Price on request unless the catalogue has this bore. An 80 mm clamp is not used on a different line. · Site practice

    100 no. × —

    GST —

    Amount —

  • pressure gauge

    Reactor jacket and the line. 4 inch dial, 0–10 kg/cm². · IS 3624

    2 no. × —

    GST —

    Amount —

  • level switch

    One tank float switch on the reactor. · Process datasheet

    1 no. × —

    GST —

    Amount —

  • flow switch

    One 100 mm vane flow switch on the condenser water. · Process datasheet

    1 no. × —

    GST —

    Amount —

  • red oxide metal primer 1 L

    Outside of 300 m of 100 NB process pipe where it is carbon steel. Stainless is not painted; confirm before ordering the paint.. About 94 m². Two coats, an allowance of 10 m² per litre per coat. · IS 1477

    19 L × —

    GST —

    Amount —

  • synthetic enamel finish 1 L

    Outside of 300 m of 100 NB process pipe where it is carbon steel. Stainless is not painted; confirm before ordering the paint.. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate. · IS 1477

    10 L × —

    GST —

    Amount —

  • welding electrode E6013 3.15 mm

    Welds on 50 fittings. · AWS A5.1

    13 kg × —

    GST —

    Amount —

  • silicone sealant 280 ml

    Flange and sleeve sealant. · Site practice

    10 no. × —

    GST —

    Amount —

  • transport to site

    Chemical process transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • clarifier 50

    200 KLD, 10 m³/h. 37.5 m³ required; 50 m³ standard size selected. · CPCB

    1 no. × —

    GST —

    Amount —

  • tube settler 10

    Lamella ahead of the clarifier. · CPCB

    1 no. × —

    GST —

    Amount —

  • filter press 630

    Sludge dewatering. · Process datasheet

    1 no. × —

    GST —

    Amount —

  • RO 5000

    Polishing RO. Recovery is on the offer. · Process datasheet

    1 plant × —

    GST —

    Amount —

  • PAC 25

    Coagulant, 25 kg packs. · COA

    20 pack × —

    GST —

    Amount —

  • dosing skid

    One skid for coagulant and one for polymer. · Process datasheet

    2 no. × —

    GST —

    Amount —

  • GI pipe 50 NB heavy

    Interconnecting pipe, 50 NB, 400 m, from 200 KLD. The catalogue figure is a per-metre rate. · IS 1239

    400 m × —

    GST —

    Amount —

  • 90 elbow 50 NB Sch 40

    Elbows on the interconnecting pipe. · ASME B16.9

    20 no. × —

    GST —

    Amount —

  • equal tee 50 NB Sch 40

    Branch tees. A reducer is not added when both ends are 50 NB. · ASME B16.9

    10 no. × —

    GST —

    Amount —

  • forged coupling 50 NB

    Screwed couplings on the dosing and drain lines. A 25 NB union is not put on this 50 NB line. · ASME B16.11

    34 no. × —

    GST —

    Amount —

  • gate valve 50 NB

    Isolation at each tank nozzle. · API 600

    20 no. × —

    GST —

    Amount —

  • check valve 50 NB

    Non-return on the transfer pump and the filter feed. · API 594

    2 no. × —

    GST —

    Amount —

  • Y strainer 50 NB

    One strainer ahead of the pump and one ahead of the RO. · Site practice

    2 no. × —

    GST —

    Amount —

  • flange 50 NB class 150 A105

    Two flanges on each isolation valve. · ASME B16.5

    40 no. × —

    GST —

    Amount —

  • spiral wound gasket 50 NB class 150

    One gasket on each flange. · ASME B16.20

    40 no. × —

    GST —

    Amount —

  • hex bolt M16 60 mm grade 8.8

    Eight bolts on each valve. Calc 160 bolts | Billed 2 lots of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count. · ISO 4014

    2 lot × —

    GST —

    Amount —

  • GI pipe clamp 50 mm

    400 m of ETP pipe. One hanger about every 3 m, 134 clamps, 50 mm to match the line. Price on request unless the catalogue has this bore. An 80 mm clamp is not used on a different line. · Site practice

    134 no. × —

    GST —

    Amount —

  • centrifugal pump 10 m3/h 15 m

    Transfer pump. Plant flow is 10 m³/h. Next catalogue pump at or above that flow is 10 m³/h at 15 m, an allowance for a short transfer, not a fire pump. · ISO 5199

    1 no. × —

    GST —

    Amount —

  • pressure gauge

    Pump discharge and filter inlet. 4 inch dial, 0–10 kg/cm². · IS 3624

    2 no. × —

    GST —

    Amount —

  • level switch

    One tank float switch on the collection tank. · Process datasheet

    1 no. × —

    GST —

    Amount —

  • flow switch

    One 100 mm vane flow switch on the treated outlet. · Process datasheet

    1 no. × —

    GST —

    Amount —

  • red oxide metal primer 1 L

    400 m of 50 NB interconnecting pipe. About 63 m². Two coats, an allowance of 10 m² per litre per coat. · IS 1477

    13 L × —

    GST —

    Amount —

  • synthetic enamel finish 1 L

    400 m of 50 NB interconnecting pipe. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate. · IS 1477

    7 L × —

    GST —

    Amount —

  • welding electrode E6013 3.15 mm

    Fillet allowance on the flanged joints. · AWS A5.1

    5 kg × —

    GST —

    Amount —

  • transport to site

    ETP transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • PV module 540

    204 modules × 540 Wp = 110.16 kWp. The count is rounded up so the array is not under the required output. · IEC 61215

    204 no. × —

    GST —

    Amount —

  • solar inverter 100

    2 × 100 kW, the next standard inverter at or above 110.16 kWp. · IEC 62109

    2 no. × —

    GST —

    Amount —

  • module mounting structure

    Roof structure, one catalogue line is 1 kWp. · IS 800

    110.16 kWp × —

    GST —

    Amount —

  • solar DC cable 4 sqmm 1 core copper

    String cable, 2 m a module, 408 m. The catalogue figure is a per-metre rate, not a drum. · IEC 62930

    408 m × —

    GST —

    Amount —

  • power cable 16

    AC run from the inverter, billed in metres. The catalogue match is a per-metre rate. · IS 7098

    220 m × —

    GST —

    Amount —

  • brass cable gland 25 mm

    Glands at the inverter and the AC isolator. 25 mm is the published gland. · IS 12943

    4 no. × —

    GST —

    Amount —

  • aluminium cable lug 70 sq mm

    70 mm² lugs for the AC tails. 70 mm² is the termination allowance. · IS 8309

    8 no. × —

    GST —

    Amount —

  • MC4 connector pair

    One male-female pair a module. The published price is a pair, so the quantity is the module count, not two pieces. · IEC 62852

    204 pair × —

    GST —

    Amount —

  • solar DC combiner box

    DC combiner, about one per 20 modules. The published box is a 4-in 4-out 1000 V DCDB. · IEC 62548

    11 no. × —

    GST —

    Amount —

  • cable tray 300

    Tray from the array to the inverter. This is not the building tray. · NBC Part 8

    3 length × —

    GST —

    Amount —

  • transport to site

    Solar transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • TMT 16 Fe500D

    1,80,000 kg of steel in the 600 m³ slab, counted as 16 mm bars of 12 m. · IS 1786 / IS 456

    9494 bar × —

    GST —

    Amount —

  • cement OPC 53

    M25 at 400 kg/m³ on 600 m³. · IS 269 / IS 456

    4800 bag × —

    GST —

    Amount —

  • AAC block

    Blockwork allowance, about 0.08 m³ per m² of one floor, × 2 floors. · IS 2185

    320 m3 × —

    GST —

    Amount —

  • ISMB 300

    Frame beams, counted once for each floor. MOQ is 1 MT. · IS 808

    10 length × —

    GST —

    Amount —

  • river sand

    Fine aggregate, about 0.45 m³ per m³ of slab concrete. Price on request when the catalogue has no sand rate. · IS 383

    270 m3 × —

    GST —

    Amount —

  • coarse aggregate 20 mm

    20 mm coarse aggregate, about 0.90 m³ per m³ of concrete. Price on request when the catalogue has no aggregate rate. · IS 383

    540 m3 × —

    GST —

    Amount —

  • concrete mixer

    One site mixer. · Site plant

    1 no. × —

    GST —

    Amount —

  • scaffolding

    One scaffold allowance for the slab and the frame. Not a safety harness, and not one line per standard. · Site plant

    1 lot × —

    GST —

    Amount —

  • binding wire

    1 mm tie wire for 600 m³ of slab, about 1 kg per 5 m³. · IS 456

    120 kg × —

    GST —

    Amount —

  • cover block

    25 mm cover blocks, about four per m³. · IS 456

    2400 no. × —

    GST —

    Amount —

  • shuttering oil

    Fosroc mould oil, about 1 L per 10 m³. · IS 456

    60 L × —

    GST —

    Amount —

  • hex bolt M16 60 mm grade 8.8

    Holding-down and splice bolts for 10 frame beams. These are catalogue hex bolts, not foundation J-bolts.. Calc 80 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count. · ISO 4014

    1 lot × —

    GST —

    Amount —

  • red oxide metal primer 1 L

    Structural steel on 10 beams, 1.5 m² a beam. About 15 m². Two coats, an allowance of 10 m² per litre per coat. · IS 1477

    3 L × —

    GST —

    Amount —

  • synthetic enamel finish 1 L

    Structural steel on 10 beams, 1.5 m² a beam. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate. · IS 1477

    2 L × —

    GST —

    Amount —

  • welding electrode E6013 3.15 mm

    Site welds on the beam connections, 0.5 kg a beam. · AWS A5.1

    5 kg × —

    GST —

    Amount —

  • transport to site

    Civil transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • PEB primary frame 20 MT

    15.25 t (15,251 kg) of built-up steel, including an 8% allowance for splices, stiffeners and base plates. Billed as kg × the 20 MT catalogue lot divided by 20,000 kg (₹116.40/kg). Not a whole 20 MT lot. Haunch 650×180×8 web 6 mm. Apex 350 mm. E250, fy 250. · IS 800 / IS 2062

    15251 kg × —

    GST —

    Amount —

  • Z purlin 1 MT

    Z 200×2.0 purlins at 1.6 m, Z 160×2.0 girts at 1.6 m. 6.95 t of Z, billed to 0.01 t, not rounded up to a whole MT. C girts are not a separate price. · IS 801 / IS 800

    6.95 MT × —

    GST —

    Amount —

  • PEB galvalume sheet 100 m2

    Calc 2,063 m² | Billed 2,100 m². Roof 1,013 m² and walls 1,050 m², laps included. The catalogue sells a 100 m² lot, so the billed area is that lot stepped up. Rate is the lot price divided by 100. · IS 875-1

    2100 m2 × —

    GST —

    Amount —

  • PEB sag rod lot

    Calc 960 m² of plan | the catalogue sag-rod lot is taken as 500 m², so this line is that area × (lot price / 500). Not one ₹49,900 lot unless the plan is 500 m². · IS 800

    960 m2 × —

    GST —

    Amount —

  • ISA 75x75x6 12 m

    23 bracing members in 3 braced bays (8 bays). Roof diagonal 20.9 m, wall diagonal 9.2 m, cut from 12 m lengths. Two roof diagonals and two wall diagonals per braced bay, plus one strut in each unbraced bay. · IS 800 / IS 808

    23 length × —

    GST —

    Amount —

  • foundation anchor bolt M24 grade 8.8

    4 bolts a column, M24, embedment 600 mm, projection 100 mm, pitch 150 mm, gauge 180 mm. Catalogue hex bolts stop at 250 mm, so this foundation bolt is not priced from them. · IS 800 / IS 5624

    72 no. × —

    GST —

    Amount —

  • PEB eave gutter

    Both eaves, 96 m. No gutter is in the catalogue. · IS 875-2

    96 m × —

    GST —

    Amount —

  • GI pipe 150 NB heavy

    8 drops of 150 NB, 60.8 m including a shoe. The catalogue figure is a per-metre rate, so this line is metres, not a count of 6 m lengths. · IS 1239

    60.8 m × —

    GST —

    Amount —

  • cement OPC 53

    18 pedestals 600×600×900 mm plus 75 mm PCC. 6.7 m³ at 400 kg/m³, M25. · IS 456

    54 bag × —

    GST —

    Amount —

  • TMT 16 Fe500D

    642 kg in the pedestals at 110 kg/m³, counted as 16 mm bars of 12 m. PCC is unreinforced. · IS 1786

    34 bar × —

    GST —

    Amount —

  • GI flashing

    Eaves and gables, 2 × 48 m + 2 × 20 m. The sourced piece is 1.829 m and the rate is per metre. · IS 875-1

    136 m × —

    GST —

    Amount —

  • GI ridge cap

    Ridge along the length, 48 m. Same sourced piece as the flashing, priced per metre. · IS 875-1

    48 m × —

    GST —

    Amount —

  • self-drilling sheeting screw box 500

    2,063 m² of sheet, about 6 screws a square metre, boxes of 500. · IS 875-1

    25 box × —

    GST —

    Amount —

  • polycarbonate skylight

    About 3% of the plan, minimum 3 m². 10 mm multiwall sheet, the published ₹45 a square foot converted to m². · IS 875-1

    29 m2 × —

    GST —

    Amount —

  • turbo ventilator 24 inch

    One 600 mm ventilator about every 150 m² of plan, and at least two. · IS 875-1

    7 no. × —

    GST —

    Amount —

  • silicone sealant 280 ml

    Sealant on the gutter and the ridge, one cartridge about every 12 m. · Site practice

    12 no. × —

    GST —

    Amount —

  • red oxide metal primer 1 L

    Primary and secondary steel, an allowance of 25 m² a tonne, 22.2 t. About 555 m². Two coats, an allowance of 10 m² per litre per coat. · IS 1477

    111 L × —

    GST —

    Amount —

  • synthetic enamel finish 1 L

    Primary and secondary steel, an allowance of 25 m² a tonne, 22.2 t. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate. · IS 1477

    56 L × —

    GST —

    Amount —

  • welding electrode E6013 3.15 mm

    Site splice allowance, 2 kg a frame, 9 frames. Shop welds are in the primary steel. · AWS A5.1

    18 kg × —

    GST —

    Amount —

  • transport to site

    PEB shed transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

Supply subtotal—

Installation

  • testing and commissioning

    Fire protection testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    Fire protection erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • testing and commissioning

    HVAC testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    HVAC erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • testing and commissioning

    Piping testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    Piping erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • testing and commissioning

    Electrical testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    Electrical erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • testing and commissioning

    Fittings and steel testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    Fittings and steel erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • testing and commissioning

    Switchyard testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    Switchyard erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • testing and commissioning

    Chemical process testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    Chemical process erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • testing and commissioning

    ETP testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    ETP erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • testing and commissioning

    Solar testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    Solar erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • testing and commissioning

    Civil testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    Civil erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. Labour at 10% of material is low for civil work. This line is an allowance, not a measured labour bill. · Site practice

    1 lot × —

    GST —

    Amount —

  • testing and commissioning

    PEB shed testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    PEB shed erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

Installation subtotal—

GST —

Grand total —

Supply is the material and the transport. Installation is erection, testing and commissioning, and the other site services. Each section has its own ex-GST subtotal. GST and the grand total follow. A catalogue match is used when the catalogue has a price. Where it does not, the rate is a published Indian marketplace or maker price plus 20%, and the source is on the line. Every material rate is ex-GST, and GST at 18% is added on it. A published price that already included GST is converted to the ex-GST figure and 18% is shown separately. Erection and installation labour is 10% of that system's material subtotal, testing and commissioning 2%, and transport 3%, with GST at 18% on those allowances.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 150 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

Separate drawings

Factoryclix

Rev A

SHEET 1 OF 6

FW-1001 SUCTIONFW-1002 SUCTIONFW-1003 JOCKEY200-FW-2001 RISER200-FW-2001 RISER25-FW-2501 RANGE200-FW-3001 RINGT-101Fire water tank293 KL293 m³P-101Electric fire pump1 no.3,400 L/min at 88 mP-102Diesel fire pump1 no.3,400 L/min at 88 mP-103Jockey pump1 no.180 L/min at 93 mLVLanding valves4 no.GVSection valves2 no.SPKSprinkler heads446 no.Remote area demand is not t…YHYard hydrants6 no.FAFire alarm panel1 no.PG-101FT-101Instrument bubbles are the scheme. A bubble with no quantity is not a bill line. Equipment quantities are the bill.Factoryclix / Proactive Industrial Pvt LtdFire protectionDRAWINGP&IDSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis Pump flow 204 m³/h · 3,400 L/min · Pump head 88 m
Factoryclix

Rev A

SHEET 1 OF 6

CHW-1001 SUPPLYCHW-1002 RETURNSA / RACH-01Chiller1 no.200 TRAHUAir handling units1 no.1 × 60,000 cfm · 182 TR · 7…DUCTGI duct1,628 kgFDFire dampers8 no.TT-01Instrument bubbles are the scheme. A bubble with no quantity is not a bill line. Equipment quantities are the bill.Factoryclix / Proactive Industrial Pvt LtdHVACDRAWINGP&IDSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis Cooling load 182 TR · Supply air 72,800 cfm
Factoryclix

Rev A

SHEET 1 OF 6

100 NB · 1.70 m/s · 300 mP-1001L-1001Line300 m100 NB · 1.70 m/s · 300 mGVGate valves10 no.FLFlanges20 no.ELElbows10 no.TEETees5 no.Equipment quantities are the bill. Plan, elevations and section A-A share one scale.Factoryclix / Proactive Industrial Pvt LtdPipingDRAWINGP&IDSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis Pipe bore 100 NB · 1.70 m/s · 300 m
Factoryclix

Rev A

SHEET 1 OF 6

415 V distributionTR-1Transformer1 no.400 kVAACBMain ACB1 no.800 AMCCBFeeder MCCB3 no.400 kVA · 556 A at 415 VCable 2 × 185 mm² · 1.21% drop · 100 mEquipment quantities are the bill. Plan, elevations and section A-A share one scale.Factoryclix / Proactive Industrial Pvt LtdElectricalDRAWINGSingle line diagramSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis Demand 400 kVA · Cable 2 × 185 mm² · 1.21% drop
Factoryclix

Rev A

SHEET 1 OF 6

Member marks match the bill. The plan is the scaled rack.PrimaryColumnBraceB1ISMB primary8 length8 ISMB 300 · 8 ISMC 150 (1…C1ISMC columns1,574.4 kgBRISA braces16 lengthFactoryclix / Proactive Industrial Pvt LtdFittings and steelDRAWINGSteel line diagramSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis Pipe rack 8 ISMB 300 · 8 ISMC 150 (1,574.4 kg) · 16 ISA
Factoryclix

Rev A

SHEET 1 OF 6

11 kV gantryLALightning arrestor1 set11 kVISOLIsolators2 set11 kVCTCurrent transformer1 setVCBVacuum breaker1 no.TR-1Transformer1 no.400 kVA400 kVA · 556 AEquipment quantities are the bill. Plan, elevations and section A-A share one scale.Factoryclix / Proactive Industrial Pvt LtdSwitchyardDRAWINGSingle line diagramSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis Yard 11 kV · 1 × 400 kVA · Demand 400 kVA
Factoryclix

Rev A

SHEET 1 OF 6

100-PA-1001100-PA-1002 VAPOUR100-VT-1003 VENTR-101Reactor1 no.2000 LC-101Column1 no.600 mmE-101Condenser1 no.5 m²S-101Scrubber1 no.TI-101PI-101Instrument bubbles are the scheme. A bubble with no quantity is not a bill line. Equipment quantities are the bill.Factoryclix / Proactive Industrial Pvt LtdChemical processDRAWINGP&IDSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis Reactor 2,000 L · Condenser 5 m²
Factoryclix

Rev A

SHEET 1 OF 6

EFF-1001EFF-1002EFF-1003EFF-1004DSDosing skids2 no.TSTube settler1 no.CL-101Clarifier1 no.200 m³/day · 10 m³/h over 2…FPFilter press1 no.RORO plant1 plantFIT-101Instrument bubbles are the scheme. A bubble with no quantity is not a bill line. Equipment quantities are the bill.Factoryclix / Proactive Industrial Pvt LtdETPDRAWINGP&IDSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis 200 m³/day · 10 m³/h · clarifier 50 m³
Factoryclix

Rev A

SHEET 1 OF 6

DC string and AC outputPVPV array204 no.110.16 kWp · 204 × 540 WpINVInverter2 no.2 × 100 kWMMSMounting structure110.16 kWpGridEquipment quantities are the bill. Plan, elevations and section A-A share one scale.Factoryclix / Proactive Industrial Pvt LtdSolarDRAWINGSingle line diagramSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis Array 110.16 kWp · 204 modules · 446.8 kWh/day
Factoryclix

Rev A

SHEET 1 OF 6

The plan is the scaled grid. Marks on this sheet are the calculation and the bill.PrimaryColumnBraceCONCConcrete600 m³STLReinforcement1,80,000 kgTMTTMT bars9,494 barCEMCement4,800 bagB1Frame beams10 lengthFactoryclix / Proactive Industrial Pvt LtdCivilDRAWINGFraming diagramSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis Concrete 600.0 m³ · Reinforcement 1,80,000 kg · 4,800 bags
Factoryclix

Rev A

SHEET 1 OF 6

GA / FRAMING PLAN9 rigid frames · Z 200×2.0 at 1.60 m · bracing in 3 bays123456789ABRIDGE48 m · 8 bays @ 6 m20 mAA10 mScale 1:200SCHEDULE — SAME QUANTITIES AS THE BILLRF PEB primary frame 20 MT 15,251 kgPL Z purlin 1 MT 6.95 MTBR ISA 75x75x6 12 m 23 lengthAB foundation anchor bolt M24… 72 no.GT PEB eave gutter 96 mDP GI pipe 150 NB heavy 60.8 mPD cement OPC 53 54 bagTMT TMT 16 Fe500D 34 barFactoryclix / Proactive Industrial Pvt LtdPEB shedDRAWINGGA / framing planSHEET 1 OF 6SCALE 1:200REV AEnquiry48 m × 20 m · eave 7 m · bay 6 m · slope 1:10 · Vb 39 m/sDesign basis Geometry 9 frames · bay 6 m · rise 1 m · Dead load 0.158 kN/m² on plan