Engineering hub

Engineering Hub: System Design, Drawings & BOQ

Enter the duty, or describe any requirement and attach the drawing. AutoCAD, PDF, a spreadsheet or a photograph is accepted. The desk sizes what it can from NBC 2016 Part 4, IS 15105, IS 3844, IS 13039, TAC, NFPA 13, NFPA 20, IS 732, IS 3043, IS 2189, ISHRAE and ASHRAE 62.1, draws the P&ID or single-line diagram, the scaled plan, both elevations, section A-A and the isometric, and writes the bill. A PEB shed takes length, width, eave, bay, slope, basic wind speed, crane and cladding, and draws the framing plan, the anchor bolt plan, both elevations, section A-A and a rotatable 3D model. Fire suppression and fire detection sit under Fire protection, not as a separate project type. A mark you add on the sheet is saved with the download. A licensed engineer still stamps the issue.

Choose project type

Civil is selected. The subcategories for this type are under this list. The drawing and the bill further down are the existing type page. A catalogue price is used when it matches. Otherwise a published Indian rate plus 20% is shown with its source. Erection is 10% of that system's materials, testing 2%, and transport 3%.

Subcategories

Each subcategory has its own design basis, calculation, drawings, bill and quotation.

AutoCAD DWG or DXF, PDF, a photograph, or a spreadsheet.

System

Drawing is listening

FACTORYCLIX PROCURERequirementConcrete 600.0 m³ · Reinforcement 1,80,000 kg · 4,800 bagsEnquiry drawing. A licensed engineer stamps the issue. DWG stays a reference file.

Each instruction changes the drawing at once. It keeps taking the next one until you say stop.

Factoryclix

Rev A

SHEET 1 OF 6

The plan is the scaled grid. Marks on this sheet are the calculation and the bill.PrimaryColumnBraceCONCConcrete600 m³STLReinforcement1,80,000 kgTMTTMT bars9,494 barCEMCement4,800 bagB1Frame beams10 lengthFactoryclix / Proactive Industrial Pvt LtdCivilDRAWINGFraming diagramSHEET 1 OF 6SCALE NTSREV AEnquiry2,000 m² per floor · 2 floors · eave 8 mDesign basis Concrete 600.0 m³ · Reinforcement 1,80,000 kg · 4,800 bags

Calculation

PartFormulaWorkingResultStandard
ConcreteV = area per floor × floors × slab thickness2,000 m² per floor × 2 floors × 150 mm600.0 m³IS 456
ReinforcementSteel = built-up area × kg/m² for an RCC frame4,000 m² × 45 kg/m². A slab-only 15 kg/m² is low for RCC framing; 35–50 kg/m² is the usual band. Cement stays 400 kg/m³ of the 600.0 m³ slab, in 50 kg bags.1,80,000 kg · 4,800 bagsIS 456 / IS 1786

Design basis

PartSpecificationStandard
TMT 16 Fe500D1,80,000 kg of steel in the 600 m³ slab, counted as 16 mm bars of 12 m.IS 1786 / IS 456
cement OPC 53M25 at 400 kg/m³ on 600 m³.IS 269 / IS 456
AAC blockBlockwork allowance, about 0.08 m³ per m² of one floor, × 2 floors.IS 2185
ISMB 300Frame beams, counted once for each floor. MOQ is 1 MT.IS 808
river sandFine aggregate, about 0.45 m³ per m³ of slab concrete. Price on request when the catalogue has no sand rate.IS 383
coarse aggregate 20 mm20 mm coarse aggregate, about 0.90 m³ per m³ of concrete. Price on request when the catalogue has no aggregate rate.IS 383
concrete mixerOne site mixer.Site plant
scaffoldingOne scaffold allowance for the slab and the frame. Not a safety harness, and not one line per standard.Site plant
Binding wire1 mm tie wire for 600 m³ of slab, about 1 kg per 5 m³.IS 456
Cover block25 mm cover blocks, about four per m³.IS 456
Shuttering oilFosroc mould oil, about 1 L per 10 m³.IS 456
BoltHolding-down and splice bolts for 10 frame beams. These are catalogue hex bolts, not foundation J-bolts.. Calc 80 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count.ISO 4014
PrimerStructural steel on 10 beams, 1.5 m² a beam. About 15 m². Two coats, an allowance of 10 m² per litre per coat.IS 1477
Finish paintStructural steel on 10 beams, 1.5 m² a beam. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate.IS 1477
Welding rodSite welds on the beam connections, 0.5 kg a beam.AWS A5.1
TestingCivil testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice
ErectionCivil erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. Labour at 10% of material is low for civil work. This line is an allowance, not a measured labour bill.Site practice
TransportCivil transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance.Site practice

Civil BOQ

Proactive Industrial Private LimitedGSTIN: 24AAQCP1475R1ZLRegistered office: C-119, Siddhivinayak Business Tower, Makarba, Sarkhej, Ahmedabad, Gujarat 380051Branch offices: Vadodara | Padal (Kheda) | Bharuch

Supply

  • TMT 16 Fe500D

    1,80,000 kg of steel in the 600 m³ slab, counted as 16 mm bars of 12 m. · IS 1786 / IS 456

    9494 bar × —

    GST —

    Amount —

  • cement OPC 53

    M25 at 400 kg/m³ on 600 m³. · IS 269 / IS 456

    4800 bag × —

    GST —

    Amount —

  • AAC block

    Blockwork allowance, about 0.08 m³ per m² of one floor, × 2 floors. · IS 2185

    320 m3 × —

    GST —

    Amount —

  • ISMB 300

    Frame beams, counted once for each floor. MOQ is 1 MT. · IS 808

    10 length × —

    GST —

    Amount —

  • river sand

    Fine aggregate, about 0.45 m³ per m³ of slab concrete. Price on request when the catalogue has no sand rate. · IS 383

    270 m3 × —

    GST —

    Amount —

  • coarse aggregate 20 mm

    20 mm coarse aggregate, about 0.90 m³ per m³ of concrete. Price on request when the catalogue has no aggregate rate. · IS 383

    540 m3 × —

    GST —

    Amount —

  • concrete mixer

    One site mixer. · Site plant

    1 no. × —

    GST —

    Amount —

  • scaffolding

    One scaffold allowance for the slab and the frame. Not a safety harness, and not one line per standard. · Site plant

    1 lot × —

    GST —

    Amount —

  • binding wire

    1 mm tie wire for 600 m³ of slab, about 1 kg per 5 m³. · IS 456

    120 kg × —

    GST —

    Amount —

  • cover block

    25 mm cover blocks, about four per m³. · IS 456

    2400 no. × —

    GST —

    Amount —

  • shuttering oil

    Fosroc mould oil, about 1 L per 10 m³. · IS 456

    60 L × —

    GST —

    Amount —

  • hex bolt M16 60 mm grade 8.8

    Holding-down and splice bolts for 10 frame beams. These are catalogue hex bolts, not foundation J-bolts.. Calc 80 bolts | Billed 1 lot of 100. M16 × 60 mm, grade 8.8. The catalogue price is a box or lot, so it is not multiplied by the bolt count. · ISO 4014

    1 lot × —

    GST —

    Amount —

  • red oxide metal primer 1 L

    Structural steel on 10 beams, 1.5 m² a beam. About 15 m². Two coats, an allowance of 10 m² per litre per coat. · IS 1477

    3 L × —

    GST —

    Amount —

  • synthetic enamel finish 1 L

    Structural steel on 10 beams, 1.5 m² a beam. One finish coat on the same area. Asian Paints Apcolite gloss, the published 1 L rate. · IS 1477

    2 L × —

    GST —

    Amount —

  • welding electrode E6013 3.15 mm

    Site welds on the beam connections, 0.5 kg a beam. · AWS A5.1

    5 kg × —

    GST —

    Amount —

  • transport to site

    Civil transport and freight. 3% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

Supply subtotal—

Installation

  • testing and commissioning

    Civil testing and commissioning. 2% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. · Site practice

    1 lot × —

    GST —

    Amount —

  • erection and labour

    Civil erection and installation labour. 10% of this system's material subtotal, ex-GST. GST 18% is added on this allowance. Labour at 10% of material is low for civil work. This line is an allowance, not a measured labour bill. · Site practice

    1 lot × —

    GST —

    Amount —

Installation subtotal—

GST —

Grand total —

Supply is the material and the transport. Installation is erection, testing and commissioning, and the other site services. Each section has its own ex-GST subtotal. GST and the grand total follow. A catalogue match is used when the catalogue has a price. Where it does not, the rate is a published Indian marketplace or maker price plus 20%, and the source is on the line. Every material rate is ex-GST, and GST at 18% is added on it. A published price that already included GST is converted to the ex-GST figure and 18% is shown separately. Erection and installation labour is 10% of that system's material subtotal, testing and commissioning 2%, and transport 3%, with GST at 18% on those allowances.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 150 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

  • 2,000 m² is the area of one floor, 2 floors, 8 m height. Sprinkler heads, sprinkler branch pipe and smoke detectors are that floor counted again on every floor. The sprinkler pump stays on the remote design area.
  • Prices on the quotation are ex-GST. A catalogue match is used first. Where the catalogue has no price, a published Indian rate plus 20% is used and the source is on the line. GST at 18% is added on every material line. A price the source already quoted including GST is converted to the ex-GST rate and 18% is shown separately. Erection and installation labour is 10% of that system's material subtotal, testing and commissioning 2%, and transport 3%. GST 18% is added on those allowances.
  • Standards cited on this desk: NBC 2016 Part 4, IS 15105, IS 3844, IS 13039, TAC, NFPA 13, NFPA 20, IS 732, IS 3043, IS 2189, ISHRAE and ASHRAE 62.1.

Get this designed & installed by us

Statutory

  • This is an enquiry BOQ, not a sanctioned design. A licensed consultant stamps the drawing before construction.
  • Building permission from the local authority. Structural design is stamped to NBC, IS 456 and IS 1893. Ahmedabad is seismic zone III unless the site geotech says otherwise. IS 875 covers wind on a shed.