Projects · drawing and BOQ

Industrial machines / Generator set

KOEL diesel generator — 250 kVA · Silent
KOEL · Generator setgenerator set250 kVAKOEL diesel generator — 250 kVA · SilentMOQ 1 unit · 6–12 weeks

KOEL

KOEL diesel generator — 250 kVA · Silent

₹21,54,000

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 850213 · Confirm stock and the rate on the offer.

Make
KOEL
MOQ
1 unit
SKU
RG-3991675
HSN
850213
Dispatch
6–12 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 10,770 kg

Freight ₹10,580 ex-GST · GST ₹1,904 · Payable ₹12,484

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

Specification

Rating250 kVA
CanopySilent
MakeKOEL
StandardCPCB IV+. AMF panel included on the silent set
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

diesel generator. CPCB IV+. AMF panel included on the silent set. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO.

Datasheet

KOEL · KOEL diesel generator — 250 kVA · Silent

Market rate ₹21,54,000 ex-GST · HSN 850213 · MOQ 1 unit · 6–12 weeks

diesel generator. CPCB IV+. AMF panel included on the silent set. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO.

KOEL · Generator setgenerator set250 kVAKOEL diesel generator — 250 kVA · SilentMOQ 1 unit · 6–12 weeks
Rating250 kVA
CanopySilent
MakeKOEL
StandardCPCB IV+. AMF panel included on the silent set
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra

Chartered engineer

This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.

Request an inspection

Other vendors to compare