Projects · drawing and BOQ

Industrial machines / Generator set

Kirloskar diesel generator — 30 kVA · Silent
Kirloskar · Generator setgenerator set30 kVAKirloskar diesel generator — 30 kVA · SilentMOQ 1 unit · 6–12 weeks

Kirloskar

Kirloskar diesel generator — 30 kVA · Silent

₹4,03,000

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 850213 · Confirm stock and the rate on the offer.

Make
Kirloskar
MOQ
1 unit
SKU
RG-3991666
HSN
850213
Dispatch
6–12 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 2,015 kg

Freight ₹1,980 ex-GST · GST ₹356 · Payable ₹2,336

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

Specification

Rating30 kVA
CanopySilent
MakeKirloskar
StandardCPCB IV+. AMF panel included on the silent set
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

diesel generator. CPCB IV+. AMF panel included on the silent set. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO.

Datasheet

Kirloskar · Kirloskar diesel generator — 30 kVA · Silent

Market rate ₹4,03,000 ex-GST · HSN 850213 · MOQ 1 unit · 6–12 weeks

diesel generator. CPCB IV+. AMF panel included on the silent set. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO.

Kirloskar · Generator setgenerator set30 kVAKirloskar diesel generator — 30 kVA · SilentMOQ 1 unit · 6–12 weeks
Rating30 kVA
CanopySilent
MakeKirloskar
StandardCPCB IV+. AMF panel included on the silent set
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra

Chartered engineer

This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.

Request an inspection

Other vendors to compare