Projects · drawing and BOQ

Chemical process / Scrubber

Pharmalab packed scrubber — 300 mm · FRP
Pharmalab · Scrubber300 mm · FRPPharmalab packed scrubber — 300 mm · FRPMOQ 1 unit · 8–14 weeks

Pharmalab

Pharmalab packed scrubber — 300 mm · FRP

₹73,500

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 841989 · Confirm stock and the rate on the offer.

Make
Pharmalab
MOQ
1 unit
SKU
RG-3991497
HSN
841989
Dispatch
8–14 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 368 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

Specification

Diameter300 mm
MOCFRP
MakePharmalab
StandardFRP or SS. Gas and packing on the offer
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

packed scrubber. FRP or SS. Gas and packing on the offer. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO.

Datasheet

Pharmalab · Pharmalab packed scrubber — 300 mm · FRP

Market rate ₹73,500 ex-GST · HSN 841989 · MOQ 1 unit · 8–14 weeks

packed scrubber. FRP or SS. Gas and packing on the offer. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO.

Pharmalab · Scrubber300 mm · FRPPharmalab packed scrubber — 300 mm · FRPMOQ 1 unit · 8–14 weeks
Diameter300 mm
MOCFRP
MakePharmalab
StandardFRP or SS. Gas and packing on the offer
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra

Chartered engineer

This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.

Request an inspection

Other vendors to compare