Material handling and PEB / PEB

Zamil
Zamil PEB material — Primary frame 20 MT
GST 18% on the listing · HSN 730890 · Confirm stock and the rate on the offer.
- Make
- Zamil
- MOQ
- 1 frame lot, ex-works
- SKU
- RG-3990407
- HSN
- 730890
- Dispatch
- 6–10 weeks
- GST
- 18%
Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.
Freight
Ahmedabad to Vadodara · about 131 km · chargeable 10,975 kg
Freight ₹10,780 ex-GST · GST ₹1,940 · Payable ₹12,720
Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.
- IS 800
Specification
| Item | Primary frame 20 MT |
|---|---|
| Make | Zamil |
| Standard | IS 800 / MBMA practice. Primary steel ex-works |
| MOQ | 1 frame lot, ex-works |
| Chartered Engineer | Inspection can be requested before dispatch |
| Datasheet | Open the datasheet on this page. GA and MTC follow with the offer where the duty needs them. |
Description
PEB material. IS 800 / MBMA practice. Primary steel ex-works. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for the lot in the spec, ex-works. Erection and sheeting accessories are extra unless named.
Datasheet
Zamil · Zamil PEB material — Primary frame 20 MT
Market rate ₹21,95,000 ex-GST · HSN 730890 · MOQ 1 frame lot, ex-works · 6–10 weeks
PEB material. IS 800 / MBMA practice. Primary steel ex-works. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for the lot in the spec, ex-works. Erection and sheeting accessories are extra unless named.
| Item | Primary frame 20 MT |
|---|---|
| Make | Zamil |
| Standard | IS 800 / MBMA practice. Primary steel ex-works |
| MOQ | 1 frame lot, ex-works |
| Chartered Engineer | Inspection can be requested before dispatch |
| Datasheet | Open the datasheet on this page. GA and MTC follow with the offer where the duty needs them. |
40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra
Chartered engineer
This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.
Request an inspectionOther vendors to compare
Kirby
Kirby PEB material — Primary frame 20 MT₹21,17,000
Interarch
Interarch PEB material — Primary frame 20 MT₹20,58,000
