Projects · drawing and BOQ

Material handling and PEB / PEB

Kirby PEB material — Primary frame 20 MT
Kirby · PEBPrimary frame 20 MTPrimary frame 20 MTKirby PEB material — Primary frame 20 MTMOQ 1 frame lot, ex-works · 6–10 weeks

Kirby

Kirby PEB material — Primary frame 20 MT

₹21,17,000

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 730890 · Confirm stock and the rate on the offer.

Make
Kirby
MOQ
1 frame lot, ex-works
SKU
RG-3990391
HSN
730890
Dispatch
6–10 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 10,585 kg

Freight ₹10,400 ex-GST · GST ₹1,872 · Payable ₹12,272

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

  • IS 800

Specification

ItemPrimary frame 20 MT
MakeKirby
StandardIS 800 / MBMA practice. Primary steel ex-works
MOQ1 frame lot, ex-works
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

PEB material. IS 800 / MBMA practice. Primary steel ex-works. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for the lot in the spec, ex-works. Erection and sheeting accessories are extra unless named.

Datasheet

Kirby · Kirby PEB material — Primary frame 20 MT

Market rate ₹21,17,000 ex-GST · HSN 730890 · MOQ 1 frame lot, ex-works · 6–10 weeks

PEB material. IS 800 / MBMA practice. Primary steel ex-works. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for the lot in the spec, ex-works. Erection and sheeting accessories are extra unless named.

Kirby · PEBPrimary frame 20 MTPrimary frame 20 MTKirby PEB material — Primary frame 20 MTMOQ 1 frame lot, ex-works · 6–10 weeks
ItemPrimary frame 20 MT
MakeKirby
StandardIS 800 / MBMA practice. Primary steel ex-works
MOQ1 frame lot, ex-works
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra

Chartered engineer

This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.

Request an inspection

Other vendors to compare