Projects · drawing and BOQ

Material handling and PEB / Material handling

Godrej material handling equipment — Belt conveyor · 1.5 T
Godrej · Material handlingBelt conveyor1.5 TGodrej material handling equipment — Belt convMOQ 1 unit · 8–14 weeks

Godrej

Godrej material handling equipment — Belt conveyor · 1.5 T

₹2,66,300

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 842710 · Confirm stock and the rate on the offer.

Make
Godrej
MOQ
1 unit
SKU
RG-3990271
HSN
842710
Dispatch
8–14 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 1,332 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

Specification

TypeBelt conveyor
Capacity1.5 T
MakeGodrej
StandardConfirm duty cycle and span on the offer
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

material handling equipment. Confirm duty cycle and span on the offer. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO.

Datasheet

Godrej · Godrej material handling equipment — Belt conveyor · 1.5 T

Market rate ₹2,66,300 ex-GST · HSN 842710 · MOQ 1 unit · 8–14 weeks

material handling equipment. Confirm duty cycle and span on the offer. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO.

Godrej · Material handlingBelt conveyor1.5 TGodrej material handling equipment — Belt convMOQ 1 unit · 8–14 weeks
TypeBelt conveyor
Capacity1.5 T
MakeGodrej
StandardConfirm duty cycle and span on the offer
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra

Chartered engineer

This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.

Request an inspection

Other vendors to compare