Projects · drawing and BOQ

Process equipment / Boiler

Cheema industrial boiler — Non-IBR 0.5 TPH
Cheema · BoilerNon-IBR 0.5 TPHCheema industrial boiler — Non-IBR 0.5 TPHMOQ 1 unit · 10–16 weeks

Cheema

Cheema industrial boiler — Non-IBR 0.5 TPH

₹3,16,200

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 840219 · Confirm stock and the rate on the offer.

Make
Cheema
MOQ
1 unit
SKU
RG-3990235
HSN
840219
Dispatch
10–16 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 1,581 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

  • IBR 0.5
  • IBR

Specification

DutyNon-IBR 0.5 TPH
MakeCheema
StandardIBR where the duty is IBR. Non-IBR only inside the statutory limit
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

industrial boiler. IBR where the duty is IBR. Non-IBR only inside the statutory limit. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one boiler, ex-works. Chimney, fuel train and IBR fees are confirmed on the offer.

Datasheet

Cheema · Cheema industrial boiler — Non-IBR 0.5 TPH

Market rate ₹3,16,200 ex-GST · HSN 840219 · MOQ 1 unit · 10–16 weeks

industrial boiler. IBR where the duty is IBR. Non-IBR only inside the statutory limit. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one boiler, ex-works. Chimney, fuel train and IBR fees are confirmed on the offer.

Cheema · BoilerNon-IBR 0.5 TPHCheema industrial boiler — Non-IBR 0.5 TPHMOQ 1 unit · 10–16 weeks
DutyNon-IBR 0.5 TPH
MakeCheema
StandardIBR where the duty is IBR. Non-IBR only inside the statutory limit
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra

Chartered engineer

This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.

Request an inspection