Fire and safety systems / Foam flooding

Tyco
Tyco foam flooding package — High expansion · 200 m3
GST 18% on the listing · HSN 842410 · Confirm stock and the rate on the offer.
- Make
- Tyco
- MOQ
- 1 unit
- SKU
- RG-3987521
- HSN
- 842410
- Dispatch
- 6–12 weeks
- GST
- 18%
Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.
Freight
Ahmedabad to Vadodara · about 131 km · chargeable 1,945 kg
Freight ₹1,910 ex-GST · GST ₹344 · Payable ₹2,254
Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.
- NFPA 11
- NFPA 16.
- NFPA 16
Specification
| Agent | High expansion |
|---|---|
| Volume | 200 m3 |
| Make | Tyco |
| Standard | NFPA 11 / NFPA 16 |
| MOQ | 1 unit |
| Chartered Engineer | Inspection can be requested before dispatch |
| Datasheet | Open the datasheet on this page. GA and MTC follow with the offer where the duty needs them. |
Description
foam flooding package. NFPA 11 / NFPA 16. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one packaged system, ex-works. Room test and site pipe are extra.
Datasheet
Tyco · Tyco foam flooding package — High expansion · 200 m3
Market rate ₹3,88,900 ex-GST · HSN 842410 · MOQ 1 unit · 6–12 weeks
foam flooding package. NFPA 11 / NFPA 16. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one packaged system, ex-works. Room test and site pipe are extra.
| Agent | High expansion |
|---|---|
| Volume | 200 m3 |
| Make | Tyco |
| Standard | NFPA 11 / NFPA 16 |
| MOQ | 1 unit |
| Chartered Engineer | Inspection can be requested before dispatch |
| Datasheet | Open the datasheet on this page. GA and MTC follow with the offer where the duty needs them. |
40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra
Chartered engineer
This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.
Request an inspectionOther vendors to compare
HD Fire
HD Fire foam flooding package — AFFF 3% · 100 m3₹2,46,800
Newage
Newage foam flooding package — AFFF 3% · 100 m3₹2,44,400
