Project desk
Drawings, BOQ and the quotation
Fire, HVAC, electrical, piping, fittings, switchyard, chemical process, ETP, solar and civil. Open a project. The drawing, the standards and the priced bill sit on the same sheet. Rates are market rates, ex-GST.

Procure
- 2,000 m² built-up, 2 floors, 8 m height, industrial occupancy.
- Rates on the quotation are catalogue market rates, ex-GST. Freight, erection and statutory fees are extra.
Standards
- NBC 2016 Part 8 / IS 732 — Electrical installation
- IS 3043 — Earthing. At least two pits, more as the load grows
- CEA regulations — Supply and safety where the connection needs them
Statutory
- This is an enquiry BOQ, not a sanctioned design. A licensed consultant stamps drawings before construction.
- Critical vessels, boilers, gas banks and petroleum tanks need a chartered engineer or the statutory inspector before dispatch.
- The electrical drawing is signed by a licensed electrical contractor or chartered engineer where the supply authority asks for it.
Electrical BOQ
| Item | Qty | Make / match | Rate | Amount |
|---|---|---|---|---|
| MCCB 100Feeder breakers, one a floor plus the incoming. Nominal 100 A from the area allowance. · IEC 60947-2 | 3 no. | — | — | — |
| power cable 708 drums as a 70 sqmm allowance. Each catalogue line is one drum, not one metre. · IS 7098 | 8 drum | — | — | — |
| cable tray 300Tray allowance. A 2.5 m length is the catalogue unit. · NBC Part 8 | 25 length | — | — | — |
| earthingEarthing pits as a minimum. Resistance is proved on site. · IS 3043 | 2 no. | — | — | — |
Match the lines to see the quotation. Unmatched lines stay on the sheet for the seller.
Freight
Ahmedabad to Vadodara · about 131 km · chargeable 150 kg
Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124
Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.