Fire and safety systems / Horizontal lifeline

Karam
Karam horizontal lifeline — 10 m · Complete system
GST 18% on the listing · HSN 630790 · Confirm stock and the rate on the offer.
- Make
- Karam
- MOQ
- 1 system
- SKU
- RG-3991505
- HSN
- 630790
- Dispatch
- 2–4 weeks
- GST
- 18%
Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.
Freight
Ahmedabad to Vadodara · about 131 km · chargeable 150 kg
Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124
Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.
- IS 3521
- EN 795
Specification
| Length | 10 m |
|---|---|
| Build | Complete system |
| Make | Karam |
| Standard | IS 3521 BIS harness. EN 795 Class C line. BIS licence with the offer |
| MOQ | 1 system |
| Chartered Engineer | Inspection can be requested before dispatch |
| Datasheet | Open the datasheet on this page. GA and MTC follow with the offer where the duty needs them. |
Description
horizontal lifeline. IS 3521 BIS harness. EN 795 Class C line. BIS licence with the offer. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for the build and length in the spec, ex-GST.
Datasheet
Karam · Karam horizontal lifeline — 10 m · Complete system
Market rate ₹26,000 ex-GST · HSN 630790 · MOQ 1 system · 2–4 weeks
horizontal lifeline. IS 3521 BIS harness. EN 795 Class C line. BIS licence with the offer. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for the build and length in the spec, ex-GST.
| Length | 10 m |
|---|---|
| Build | Complete system |
| Make | Karam |
| Standard | IS 3521 BIS harness. EN 795 Class C line. BIS licence with the offer |
| MOQ | 1 system |
| Chartered Engineer | Inspection can be requested before dispatch |
| Datasheet | Open the datasheet on this page. GA and MTC follow with the offer where the duty needs them. |
30% advance, balance before dispatch 12 months. Test certificate with the batch Freight extra
Chartered engineer
This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.
Request an inspection