Projects · drawing and BOQ

Chemical process / Distillation

Finepac distillation column — 300 mm · Packed
Finepac · DistillationPacked300 mmFinepac distillation column — 300 mm · PackedMOQ 1 unit · 8–14 weeks

Finepac

Finepac distillation column — 300 mm · Packed

₹1,68,000

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 841940 · Confirm stock and the rate on the offer.

Make
Finepac
MOQ
1 unit
SKU
RG-3991435
HSN
841940
Dispatch
8–14 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 840 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

Specification

Diameter300 mm
DutyPacked
MakeFinepac
StandardPacked or tray. Process data sheet before fabrication
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

distillation column. Packed or tray. Process data sheet before fabrication. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO.

Datasheet

Finepac · Finepac distillation column — 300 mm · Packed

Market rate ₹1,68,000 ex-GST · HSN 841940 · MOQ 1 unit · 8–14 weeks

distillation column. Packed or tray. Process data sheet before fabrication. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO.

Finepac · DistillationPacked300 mmFinepac distillation column — 300 mm · PackedMOQ 1 unit · 8–14 weeks
Diameter300 mm
DutyPacked
MakeFinepac
StandardPacked or tray. Process data sheet before fabrication
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra

Chartered engineer

This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.

Request an inspection

Other vendors to compare