Material handling and PEB / Material handling

Eddycranes
Eddycranes material handling equipment — EOT crane · 10 T
GST 18% on the listing · HSN 842710 · Confirm stock and the rate on the offer.
- Make
- Eddycranes
- MOQ
- 1 unit
- SKU
- RG-3990330
- HSN
- 842710
- Dispatch
- 8–14 weeks
- GST
- 18%
Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.
Freight
Ahmedabad to Vadodara · about 131 km · chargeable 14,925 kg
Freight ₹14,660 ex-GST · GST ₹2,639 · Payable ₹17,299
Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.
Specification
| Type | EOT crane |
|---|---|
| Capacity | 10 T |
| Make | Eddycranes |
| Standard | Confirm duty cycle and span on the offer |
| MOQ | 1 unit |
| Chartered Engineer | Inspection can be requested before dispatch |
| Datasheet | Open the datasheet on this page. GA and MTC follow with the offer where the duty needs them. |
Description
material handling equipment. Confirm duty cycle and span on the offer. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for a shop crane on a 12–18 m span. Runway and erection are extra.
Datasheet
Eddycranes · Eddycranes material handling equipment — EOT crane · 10 T
Market rate ₹29,85,000 ex-GST · HSN 842710 · MOQ 1 unit · 8–14 weeks
material handling equipment. Confirm duty cycle and span on the offer. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for a shop crane on a 12–18 m span. Runway and erection are extra.
| Type | EOT crane |
|---|---|
| Capacity | 10 T |
| Make | Eddycranes |
| Standard | Confirm duty cycle and span on the offer |
| MOQ | 1 unit |
| Chartered Engineer | Inspection can be requested before dispatch |
| Datasheet | Open the datasheet on this page. GA and MTC follow with the offer where the duty needs them. |
40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra
Chartered engineer
This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.
Request an inspection