Projects · drawing and BOQ

Process equipment / Boiler

Forbes Marshall industrial boiler — IBR 4 TPH
Forbes Marshall · BoilerIBR 4 TPHForbes Marshall industrial boiler — IBR 4 TPHMOQ 1 unit · 10–16 weeks

Forbes Marshall

Forbes Marshall industrial boiler — IBR 4 TPH

₹66,85,000

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 840219 · Confirm stock and the rate on the offer.

Make
Forbes Marshall
MOQ
1 unit
SKU
RG-3990225
HSN
840219
Dispatch
10–16 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 33,425 kg

Freight ₹32,840 ex-GST · GST ₹5,911 · Payable ₹38,751

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

  • IBR 4
  • IBR

Specification

DutyIBR 4 TPH
MakeForbes Marshall
StandardIBR where the duty is IBR. Non-IBR only inside the statutory limit
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

industrial boiler. IBR where the duty is IBR. Non-IBR only inside the statutory limit. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one boiler, ex-works. Chimney, fuel train and IBR fees are confirmed on the offer.

Datasheet

Forbes Marshall · Forbes Marshall industrial boiler — IBR 4 TPH

Market rate ₹66,85,000 ex-GST · HSN 840219 · MOQ 1 unit · 10–16 weeks

industrial boiler. IBR where the duty is IBR. Non-IBR only inside the statutory limit. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one boiler, ex-works. Chimney, fuel train and IBR fees are confirmed on the offer.

Forbes Marshall · BoilerIBR 4 TPHForbes Marshall industrial boiler — IBR 4 TPHMOQ 1 unit · 10–16 weeks
DutyIBR 4 TPH
MakeForbes Marshall
StandardIBR where the duty is IBR. Non-IBR only inside the statutory limit
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra

Chartered engineer

This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.

Request an inspection

Other vendors to compare