Projects · drawing and BOQ

Process equipment / Heat exchanger

GEA heat exchanger — Shell and tube · 5 m2
GEA · Heat exchangerShell and tubeShell and tubeGEA heat exchanger — Shell and tube · 5 m2MOQ 1 unit · 8–14 weeks

GEA

GEA heat exchanger — Shell and tube · 5 m2

₹1,83,500

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 841950 · Confirm stock and the rate on the offer.

Make
GEA
MOQ
1 unit
SKU
RG-3990170
HSN
841950
Dispatch
8–14 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 918 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

  • TEMA

Specification

TypeShell and tube
Area5 m2
MakeGEA
StandardTEMA for shell and tube. Datasheet before fabrication
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

heat exchanger. TEMA for shell and tube. Datasheet before fabrication. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one exchanger, ex-works. TEMA datasheet to be agreed before fabrication.

Datasheet

GEA · GEA heat exchanger — Shell and tube · 5 m2

Market rate ₹1,83,500 ex-GST · HSN 841950 · MOQ 1 unit · 8–14 weeks

heat exchanger. TEMA for shell and tube. Datasheet before fabrication. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one exchanger, ex-works. TEMA datasheet to be agreed before fabrication.

GEA · Heat exchangerShell and tubeShell and tubeGEA heat exchanger — Shell and tube · 5 m2MOQ 1 unit · 8–14 weeks
TypeShell and tube
Area5 m2
MakeGEA
StandardTEMA for shell and tube. Datasheet before fabrication
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra

Chartered engineer

This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.

Request an inspection

Other vendors to compare