Projects · drawing and BOQ

Process equipment / Silo

Praj storage silo — Pellet · 30 m3
Praj · Silo30 m3Praj storage silo — Pellet · 30 m3MOQ 1 unit · 8–14 weeks

Praj

Praj storage silo — Pellet · 30 m3

₹6,25,000

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 730900 · Confirm stock and the rate on the offer.

Make
Praj
MOQ
1 unit
SKU
RG-3989870
HSN
730900
Dispatch
8–14 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 3,125 kg

Freight ₹3,070 ex-GST · GST ₹553 · Payable ₹3,623

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

Specification

DutyPellet
Capacity30 m3
MakePraj
StandardConfirm product bulk density and discharge
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

storage silo. Confirm product bulk density and discharge. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one vessel, ex-works, with a standard nozzle set. Freight, foundation and statutory fees are extra.

Datasheet

Praj · Praj storage silo — Pellet · 30 m3

Market rate ₹6,25,000 ex-GST · HSN 730900 · MOQ 1 unit · 8–14 weeks

storage silo. Confirm product bulk density and discharge. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one vessel, ex-works, with a standard nozzle set. Freight, foundation and statutory fees are extra.

Praj · Silo30 m3Praj storage silo — Pellet · 30 m3MOQ 1 unit · 8–14 weeks
DutyPellet
Capacity30 m3
MakePraj
StandardConfirm product bulk density and discharge
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra

Chartered engineer

This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.

Request an inspection

Other vendors to compare