Process equipment / Silo

Cimbria
Cimbria storage silo — Cement · 30 m3
GST 18% on the listing · HSN 730900 · Confirm stock and the rate on the offer.
- Make
- Cimbria
- MOQ
- 1 unit
- SKU
- RG-3989845
- HSN
- 730900
- Dispatch
- 8–14 weeks
- GST
- 18%
Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.
Freight
Ahmedabad to Vadodara · about 131 km · chargeable 3,805 kg
Freight ₹3,740 ex-GST · GST ₹673 · Payable ₹4,413
Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.
Specification
| Duty | Cement |
|---|---|
| Capacity | 30 m3 |
| Make | Cimbria |
| Standard | Confirm product bulk density and discharge |
| MOQ | 1 unit |
| Chartered Engineer | Inspection can be requested before dispatch |
| Datasheet | Open the datasheet on this page. GA and MTC follow with the offer where the duty needs them. |
Description
storage silo. Confirm product bulk density and discharge. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one vessel, ex-works, with a standard nozzle set. Freight, foundation and statutory fees are extra.
Datasheet
Cimbria · Cimbria storage silo — Cement · 30 m3
Market rate ₹7,61,000 ex-GST · HSN 730900 · MOQ 1 unit · 8–14 weeks
storage silo. Confirm product bulk density and discharge. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one vessel, ex-works, with a standard nozzle set. Freight, foundation and statutory fees are extra.
| Duty | Cement |
|---|---|
| Capacity | 30 m3 |
| Make | Cimbria |
| Standard | Confirm product bulk density and discharge |
| MOQ | 1 unit |
| Chartered Engineer | Inspection can be requested before dispatch |
| Datasheet | Open the datasheet on this page. GA and MTC follow with the offer where the duty needs them. |
40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra
Chartered engineer
This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.
Request an inspectionOther vendors to compare
Buhler
Buhler storage silo — Grain · 30 m3₹8,62,000
Praj
Praj storage silo — Grain · 30 m3₹6,25,000
