Projects · drawing and BOQ

Process equipment / Storage tank

Godrej Process storage tank — DM water · MS IS2062 · 1 KL
Godrej Process · Storage tank1 KL · MS IS2062Godrej Process storage tank — DM water · MS ISMOQ 1 tank — MS · 8–14 weeks

Godrej Process

Godrej Process storage tank — DM water · MS IS2062 · 1 KL

₹42,000

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 730900 · Confirm stock and the rate on the offer.

Make
Godrej Process
MOQ
1 tank — MS
SKU
RG-3988920
HSN
730900
Dispatch
8–14 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 210 kg

Freight ₹1,800 ex-GST · GST ₹324 · Payable ₹2,124

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

  • IS2062
  • IS 2062
  • PESO

Specification

LiquidDM water
MOCMS IS2062
Capacity1 KL
MakeGodrej Process
StandardIS 2062 for MS. ASTM A240 for stainless. PESO if the liquid is petroleum
MOQ1 tank — MS
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

storage tank. IS 2062 for MS. ASTM A240 for stainless. PESO if the liquid is petroleum. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one vessel, ex-works, with a standard nozzle set. Freight, foundation and statutory fees are extra.

Datasheet

Godrej Process · Godrej Process storage tank — DM water · MS IS2062 · 1 KL

Market rate ₹42,000 ex-GST · HSN 730900 · MOQ 1 tank — MS · 8–14 weeks

storage tank. IS 2062 for MS. ASTM A240 for stainless. PESO if the liquid is petroleum. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one vessel, ex-works, with a standard nozzle set. Freight, foundation and statutory fees are extra.

Godrej Process · Storage tank1 KL · MS IS2062Godrej Process storage tank — DM water · MS ISMOQ 1 tank — MS · 8–14 weeks
LiquidDM water
MOCMS IS2062
Capacity1 KL
MakeGodrej Process
StandardIS 2062 for MS. ASTM A240 for stainless. PESO if the liquid is petroleum
MOQ1 tank — MS
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra

Chartered engineer

This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.

Request an inspection

Other vendors to compare