Projects · drawing and BOQ

Fire and safety systems / Foam flooding

Minimax foam flooding package — AR-AFFF 3x3 · 500 m3
Minimax · Foam floodingAR-AFFF 3x3AR-AFFF 3x3Minimax foam flooding package — AR-AFFF 3x3 · MOQ 1 unit · 6–12 weeks

Minimax

Minimax foam flooding package — AR-AFFF 3x3 · 500 m3

₹11,25,000

Market rate, ex-GST

BuySpec

GST 18% on the listing · HSN 842410 · Confirm stock and the rate on the offer.

Make
Minimax
MOQ
1 unit
SKU
RG-3987502
HSN
842410
Dispatch
6–12 weeks
GST
18%

Dispatch is a typical band for this make, not a promised date. Confirm rate, certificates and lead on the offer before a PO.

Freight

Ahmedabad to Vadodara · about 131 km · chargeable 5,625 kg

Freight ₹5,530 ex-GST · GST ₹995 · Payable ₹6,525

Road part-load desk rate from the pincode. Chargeable weight is the higher of actual kg and 300 kg per cubic metre. Confirm the truck before a PO.

  • NFPA 11
  • NFPA 16.
  • NFPA 16

Specification

AgentAR-AFFF 3x3
Volume500 m3
MakeMinimax
StandardNFPA 11 / NFPA 16
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

Description

foam flooding package. NFPA 11 / NFPA 16. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one packaged system, ex-works. Room test and site pipe are extra.

Datasheet

Minimax · Minimax foam flooding package — AR-AFFF 3x3 · 500 m3

Market rate ₹11,25,000 ex-GST · HSN 842410 · MOQ 1 unit · 6–12 weeks

foam flooding package. NFPA 11 / NFPA 16. Market rate, ex-GST, for this make and duty. It is a desk rate for enquiry, not a mill price list. Confirm the offer before a PO. Price is for one packaged system, ex-works. Room test and site pipe are extra.

Minimax · Foam floodingAR-AFFF 3x3AR-AFFF 3x3Minimax foam flooding package — AR-AFFF 3x3 · MOQ 1 unit · 6–12 weeks
AgentAR-AFFF 3x3
Volume500 m3
MakeMinimax
StandardNFPA 11 / NFPA 16
MOQ1 unit
Chartered EngineerInspection can be requested before dispatch
DatasheetOpen the datasheet on this page. GA and MTC follow with the offer where the duty needs them.

40% advance, balance before dispatch 12 months from commissioning Extra, ex-works. Foundation and erection extra

Chartered engineer

This duty is worth a document check or a shop visit before you raise the PO. The fee is fixed. You request it, and Factoryclix confirms the payment against the inspection id.

Request an inspection

Other vendors to compare